Informs That Due to Schedule Complications W/Nsss Vendor, Completion of Evaluation of TS Impact of Analysis of Capsule s from Plant Rv Radiation Surveillance Program Not Expected Until 940729
ML17263A685
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/03/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9406130063
Download: ML17263A685 (4)


Text

DOCUIVIENT DISTRUTION SYSTEM t ACCELERATE Qp REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406130063 DOC.DATE: 94/06/03 NOTARIZED: NO 'OCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION I JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Informs that due to schedule complications w/NSSS vendor, D completion of evaluation of TS impact of analysis of capsule S from plant RV radiation surveillance program not expected until 940729.

DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL ~ SIZE: (

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 A D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA PD1-3 PD D JOHNSON,A INTERNAL: NRR/DE/EELB NRR/DORS/ONDD NRR/DRCH/HICB NRR/DRPW NRR/DSSA/SPLB - NRR/DSSA/SRXB NUDOCS-ABSTRACT O.C/~FD.CB OGC/HDS1 ,

~~gJiB . 01 EXTERNAL: NRC PDR NSIC D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCI,

~

) ~

U 1a Eg~

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT G MECREDY TELEPHONE Vice President AREA CODE 71B 546 2700 Clnna Nuclear Production June 3, 1994 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Technical Specification Impact of the Analysis of Capsule "S" from the Rochester Gas and Electric Corporation R. E.

Ginna Reactor Vessel Radiation Surveillance Program R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a): Letter from R. C. Mecredy, RG&E, to A. R. Johnson, NRC,

Subject:

"Analysis of Capsule "S" from the Rochester Gas and Electric Corporation R. E. Ginna Reactor Vessel Radiation Surveillance Program WCAP-13902 December 1993" dated March 29, 1994.

Dear Mr. Johnson:

The referenced letter discussed the potential for a Technical Specification change based upon an analysis of the Capsule "S" results for the R. E. Ginna Nuclea'r Plant reactor vessel. As presented in that letter, it was expected that, an evaluation as to the impact on the Technical Specifications would be completed by the end of May 1994. Due to schedule complications with the NSSS vendor, completion of this effort is not expected until July 29, 1994.

Very t ly yours, Robert C. Mecre y REJtl,334 xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 USNRC Ginna Senior Resident Inspector oo(

"",9406130063 940603 PDR ADOCK 050002ers P F'DR