Informs That as Result of Internal Review,Util Discovered Error in Listed Statement of TS Change Request 75 Re ASME Code Sys Hydrostatic Pressure Testing,Which Formed Part of Basis for NRC Approval of Amend 44 to License
ML20069H287
Person / Time
Site: Oyster Creek
Issue date: 06/03/1994
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-94-2081, NUDOCS 9406130057
Download: ML20069H287 (2)


Text

.,

f s

GPU Nuclear Corporation MmNuclear Forked River. New Jersey 087310388 609 971-4000 Writer's Direct Dial Numben C321-94-2081 June 3, 1994 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station i

Docket No. 50-219 Facility Operating License No. DPR-16 ASME Code System Hydrostatic Pressure Testing

References:

(1) JCP&L Letter, " Technical Specification Change Request No. 75", dated November 16, 1979.

(2)

NRC Letter, " Safety Evaluation Supporting Amendment No. 44", dated January 4, 1980.

As a result of an internal review, GPU Nuclear has discovered an error in Technical Specification Change Request (TSCR) No. 75 which formed part of the basis for NRC approval of Amendment No. 44 to the Oyster Creek Operating License. An error was discovered in the following statement.

"...during the system hydrostatic pressure test required by ASME Code Section XI,15-500, at or near the end of each ten year inspection interval.. 0ver-pressure protection would continue to be provided by the safety valves."

This statement was later incorporated in the NRC Safety Evaluation Report as follows:

i "The licensee has also proposed to allow the pressure relief function of i

the electrotnatic relief valves to be inoperable or bypassed (the ADS function of the valves would be maintained) during the system hydrostatic pressure test required by ASME Code Section .I, IS-500 at or near the end of each ten year inspection interval.

This allowance is necessary since the hydrostatic test pressure is above the setpoint of

-the relief valves.

j 1 C U U.. I

/

'hY 9406130057 940603

[ ( )1 PDR ADOCK 05000219

{n P

PDR v

GPU Nuclear Corporabon is a subsidiary of General Pubhc Utmes Corporahon

p.

s C321-94-2081 Page 2 Even though the pressure relief function of the electromatic relief valves is bypassed, overpressure protection would continue to be provided by the 16 safety valves.

Elimination of this relief function does not affect the reactor safety analysis, since credit was not taken for the relief function. Therefore, we find this modification acceptable."

The statement "over pressure protection would continue to be provided by the l

safety valves" is in error since procedurally the code safety valves are gagged to prevent weeping during system hydrostatic testing.

Specifically, when performing the ASME Code system hydrostatic pressure tests,.

)

it is Oyster Creek's procedure to gag the code safety valves prior to exceeding 970 psig. Four of the Electromatic Relief Valves (EMRV) are recalibrated to a opening pressure of 1230 psig with the remaining EMRV placed J

in the "0FF" position.

If the Reactor Vessel begins to pressurize rapidly, i

overpressure is controlled by securing the operating Control Rod Drive (CRD) pump with depressurization achieved by letting down to the Clean-Up system.

If pressure increases to 1190 psig, the EMRV in "0FF" is switched to " MAN" (the EMRV opens) to relieve pressure.

Since the CRD pump capacity is approximately 110 GPM, one EMRV is more than sufficient to relieve pressure due to a running CRD pump. Therefore the error regarding safety valves providing overpressure protection has no significant implication for public 3

health and safety.

However, since overpressure protection is not provided by the safety valves during the ASME Code system hydrostatic pressure tests, documentation of acceptance of this clarification to the referenced TSCR and NRC Safety Evaluation Report is requested.

If you have any questions or comments on this submittal, please contact Mr.

George Busch, Manager, Oyster Creek Licensing at (609) 971-4643.

l trulyyeyrs,

/

J

. Bro l

ic Prosident and Director er reek cc: Administrator, Region 1 Senior Resident Inspector Oyster Creek NRC Project Manager

(