Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000237/2014408 +
- IR 05000400/2014005 +
- IR 05000335/2014011 +
- ML15005A480 +
- ML15027A409 +
- TAC:MF5659 +
- ML15039A011 +
- ML15028A404 +
- ML15028A032 +
- ML15035A217 +
- ML15049A418 +
- ML15049A416 +
- ML15049A412 +
- ML15049A404 +
- CNL-14-144, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits (BFN TS-494) +
- GNRO-2013/00065, Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065 +
- ML15028A403 +
- ML15014A249 +
- ML15028A029 +
- ML15028A007 +
- ML15027A633 +
- ML15027A632 +
- ML15027A631 +
- ML15027A630 +
- ML15027A629 +
- ML15027A628 +
- ML15027A627 +
- ML15027A626 +
- ULNRC-06163, 90-Day Notification Pursuant to 10 CFR 72.212(B)(1) of Intent to Load Spent Fuel Under a General License +
- LIC-15-0018, Supplement to License Amendment Request (LAR) 14-03; Proposed Change to Technical Specification 3.2, Table 3-5 +
- ML15027A565 +
- ML15027A206 +
- ML15027A183 +
- ML15033A278 +
- ML22056A505 +
- ML20206L066 +
- 05000263/LER-2013-007-02, Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures +
- LG-15-014, LG-15-014 Verification of Readiness for Supplemental Inspection at Limerick Generating Station +
- PNO-III-15-001, Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage +
- ML15023A315 +
- ML15028A051 +