Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-3623, Submits Util Calculation FQ-C-JAN-002, Evaluation of Out of Limit RPV Cooldown/Heatup Rate Occurring on 890112 +
- ML17250B227 +
- ML18010A345 +
- ML18010A343 +
- ML18010A341 +
- ML18010A340 +
- ML20085B457 +
- ML20085B441 +
- ML20085B440 +
- ML20082E716 +
- ML20082E714 +
- ML20082E711 +
- ML20082E309 +
- ML20082E111 +
- ML20079E143 +
- ML20077K049 +
- ML20077J766 +
- ML20077J764 +
- ML20076D975 +
- ML20076D756 +
- ML20076D533 +
- ML20076D504 +
- ML20076D453 +
- ML20091C214 +
- ML20091C208 +
- BECO-91-096, Part 21 Rept Re Trip Latch Roller Interference on GE AK-50 Type Breakers Resulting in Failure of Automatic Transfer Scheme.Initially Reported on 910724.Breakers Modified to Prevent Clevis Pin Interference.Ge Notification Encl +
- RBG-35377, Forwards Response to SALP Rept 50-458/91-11 Covering Jan 1990 Through Mar 1991.Committee Established to Review Security Problems & Implement Timely Corrective Actions & Training Program for Maint Planners Developed +
- B13891, Requests Relief from ASME Code Section XI Re Repair to Pipe 3SWP-030-334-3 at Millstone Unit 3 +
- 3F0791-17, Responds to SALP Rept 50-302/91-07.Budgets Approved & Util in Process of Purchasing Security Equipment +
- RBG-35-380, Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl +
- 05000285/LER-1991-013, :on 910626,diesel Generator DG-2 Autostarted During Performance of Surveillance Test,Resulting in Tripping & Locking Out Breaker 1AD1.Caused by Human Error. Event Discussed W/Licensed Operator +
- 05000374/LER-1991-006, :on 910321,primary Containment Integrity Declared Inoperable During Surveillance Testing.Caused by Procedural Deficiency.Operator Determined Cause of Dual Indication & Valves Closed +
- 05000483/LER-1991-003, :on 910628,discovered That ECCS Safety Injection Cold Leg Injection Throttle Valve Mispositioned Since 910518.Caused by Failure to Verify Valve Position & to Install New Locking Seal.Procedure Written +
- 05000266/LER-1991-007, :on 910626,fire Barrier Penetration Seal Discovered Inoperable.Caused by Personnel Error.Fire Watch Stationed & Maintained in Affected Area Until Both Barriers Restored +
- 05000338/LER-1991-014, :on 910703,determined That ASME Section XI Surveillance Requirements Inadequately Performed for Four Boric Acid Transfer Pumps During Second Quarter 1991.Caused by Personnel Error.Generic Ltr 89-04 Reviewed +
- 05000313/LER-1991-002, :on 910410,inadvertent Actuation of Combined Control Room Emergency Ventilation Sys Occurred Due to Invalid Unit 2 Radiation Monitor Trip.Caused by Noise Spike. Method for Determining Setpoint Developed +
- 05000353/LER-1991-011-02, :on 910620,plant Personnel Discovered Daily Jet Pump & APRM Flow Unit Operability Verfication Surveillance Test Not Performed.Caused by Personnel Error.Procedures Will Be Revised to Remove Identified Ambiquities +
- 05000352/LER-1991-007, :on 910226,determined That Tech Specs Surveillance Requirement Had Not Been Satisfied for Tech Spec Section 3.7.7.Caused by Personnel Error.Appropriate Steps Taken to Satisfy Tech Specs Actions +
- 05000374/LER-1991-006-06, :on 910321,Unit 2 Primary Containment Integrity Discovered Inoperable.Caused by Procedural Deficiency.Event Tailgated by All Depts Emphasizing That When Requesting Special Procedure,Personnel Be Aware +
- 05000219/LER-1991-001, :on 910301,deluge Sys Taken Out of Svc W/O Establishing Continuous Fire Watch.Caused by Personnel Error.Continuous Fire Watch Assigned & Lessons Learned Lecture Given to Fire Watch Personnel +
- 05000443/LER-1991-008, :on 910627,turbine Trip W/Reactor Trip Occurred Due to Inadvertent Actuation of Switchyard Circuit Breakers. Caused by Manufacturing Error.Relay Housing for Relay Replaced During First Refueling Outage +
- 05000456/LER-1990-013, :on 900811,feedwater Isolation Occurred Due to Spurious Actuation of Train B Feedwater Isolation Circuitry. Feedwater Isolation Reset & Flow Reestablished to Steam Generators +
- ML20092K908 +
- ML18057B186 +
- ML18057B180 +
- 05000388/LER-1991-010, :on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules Replaced +
- ML17305B661 +
- ML17348B030 +
- L-91-203, Special Rept:On 910626,failure of 2B Emergency Diesel Generator Occurred During post-maint Testing Following Implementation of Plant Mod.Caused by Failed Relay.Relay R1X1 Replaced +
- L-91-213, Advises That Payment of Civil Penalty in Amount of $37,500 Electronically Transmitted to NRC on 910723,in Response to Notice of Violation Forwarded Via NRC +