ML20082E714
| ML20082E714 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/26/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-NUREG-1275 GL-88-14, NUDOCS 9108010225 | |
| Download: ML20082E714 (1) | |
Text
AWama Pow Cm unf g
\\
dOifMNnOM CfCtfigrbway fW.! (he 80x I;f%
b 8??@jf1 V# 1 %d,#m MA)1
%eDh0er 206 lit.M u
J. o woodard N;3btgjj;gl)()gy(y vu e rmo.." "'
July 26, 1991 F ai rw;. a
- , m
,.s,,
Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant - Units 1 & 2 Generic Letter No. 88-14 Instrument Air Supply System Problems Affecting Safety Related Equipment Gentlemen:
Generic Letter 88-14 requested that each licensee / applicant review NUREG-1275, Volume 2, and perform a design and operational verification of l
nlant instrument air system (s). By letter dated February 3, 1989, Alabama Power Company provided the NRC a summary of action items identified in respunse to the generic letter and a current status of those items.
Subsequently, a letter dated June 1,1989 was transmitted to the NRC providing en updated status of the action items.
1 completion of The generic letter turther requested writ ten notification upo:
l the generic letter requirements. All of the planned actions for each unit of Farley Nuclear Plant have been completed as of May 31, 1991.
If you have any questions, please advise.
Respectfully submitted, b
m D Voodard JDV/DEM/SLG:cj r DK4-17 cc:
Mr. S. D. Ebnetet Mr. S. T. Hoffman SVORN TO AND SUBSCRIBED BEFORE ME i
Mr. G. F. Maxwell f/
M (kk ' DAY OFj'fff[ _,1991 THIS
/
d-ed 1/tk C / 7 N5tary'i%bli r
/
/
MyCommissionExp" lies:
'/~/k[/
9108010225 910726 FOR ADOCK 05000348
[
P PDR m