Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236B675 + (3)
- ML16356A567 + (47)
- ML023510021 + (47)
- ML17301A158 + (10)
- ML020570311 + (48)
- ML020250504 + (4)
- ML20136B359 + (4)
- L-23-175, Submittal of Fifth Ten Year Inservice Testing Program + (4)
- ML030020565 + (54)
- ENS 45526 + (48)
- ML25175A346 + (48)
- ML103160150 + (48B)
- ML20117K248 + (49)
- ML20063A050 + (2)
- ML18057A505 + (49)
- ML20076F317 + (49)
- ML20134D000 + (74C)
- ML20212B765 + (49)
- ML20215K647 + (111)
- ML11308A097 + (35)
- ML073190037 + (49)
- 05000334/LER-1981-029-03, Containment Isolation Check Valve Found to Have Too Low Opening Pressure & Leakage in Excess of Measuring Device Used for Type C Testing.Cause Unknown.Maint Performed + (2)
- ML20097H337 + (49)
- IR 05000334/1979012 + (60)
- IR 05000334/2018002 + (49)
- ML13324A725 + (49)
- ML18123A244 + (5)
- L-02-040, Supplemental Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity + (5)
- ML19312D997 + (5)
- 05000334/LER-1996-009, :on 960731,containment Penetrations Not Designed Accordance with Design Basis.Caused by Inadequate Design.Unit 1 Penetration Numbers 1,2,4,5,TS 3.6.3.1 Were Entered + (5)
- ML021150585 + (5)
- L-03-103, Reactor Head Inspection 60-Day Report + (53)
- NL-16-096, 2016 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements + (50)
- RNP-RA/02-0170, Revised Relief Request No. 18 Regarding Examination of the Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for the Fourth Ten-Year Inservice Inspection Interval + (50)
- RNP-RA/02-0166, Relief Request No. 18 Regarding Examination of Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for Fourth Ten-Year Inservice Inspection Interval + (50)
- RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report + (68)
- ML19332F304 + (50)
- ML20147E175 + (50)
- ML20041G484 + (50)
- IR 05000317/2018010 + (50)
- ML030020565 + (54)
- ML20054F019 + (N-41)
- RC-14-0145, Twenty-First Refueling Inservice Inspection (ISI) Reports + (22)
- L-03-064, Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations + (51)
- ML022190627 + (51)
- L-02-040, Supplemental Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity + (65)
- ML20206D176 + (51)
- ML14156A312 + (51)
- ULNRC-06121, Enclosure 1, Amendment 36, LRA Changes + (51)
- ULNRC-06118, Updated RAI Response to the License Renewal Application, Enclosures 1 and 2 + (51)
- ML19319E570 + (51)
- IR 05000334/2008003 + (51)
- IR 05000313/1977003 + (51)
- ULNRC-05906, License Renewal Application - Request for Additional Information (RAI) Set 7 Responses + (51)