Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-81-240, Submits Info Re Seismology Per 810505 Meeting Agreement + (20:56:57, 8 January 2025)
- ML17209B231 + (20:56:57, 8 January 2025)
- IR 05000335/1981008 + (20:57:00, 8 January 2025)
- ML17209B220 + (20:57:02, 8 January 2025)
- ML17209B219 + (20:57:03, 8 January 2025)
- ML17209B217 + (20:57:04, 8 January 2025)
- ML17209B218 + (20:57:04, 8 January 2025)
- ML17209B216 + (20:57:05, 8 January 2025)
- ML17209B214 + (20:57:06, 8 January 2025)
- ML17209B209 + (20:57:07, 8 January 2025)
- L-81-235, Advises That Technical Support Ctr Data Display Sys Scheduled Completion Date Will Be Delayed Until 810701,due to Problems Encountered W/Const & Sys Testing Phases + (20:57:08, 8 January 2025)
- ML17209B194 + (20:57:10, 8 January 2025)
- ML17209B193 + (20:57:11, 8 January 2025)
- ML17209B192 + (20:57:12, 8 January 2025)
- ML17209B190 + (20:57:13, 8 January 2025)
- ML17209B189 + (20:57:15, 8 January 2025)
- ML17209B188 + (20:57:16, 8 January 2025)
- IR 05000389/1981004 + (20:57:28, 8 January 2025)
- ML17209B182 + (20:57:29, 8 January 2025)
- ML17209B181 + (20:57:30, 8 January 2025)
- L-81-199, Ack Receipt of IE Insp Rept 50-389/81-04 on 810309-20.No Proprietary Info.Corrective Actions:Const Supervision Instructed in Requirements for Repairing Concrete Honeycomb + (20:57:31, 8 January 2025)
- ML17209B178 + (20:57:33, 8 January 2025)
- L-81-237, Advises That Response to Matls Engineering Branch Requests for Addl Info Will Be Provided 810801 for Inservice Insp Section & 810615 for Component Integrity Section.Response to Chemical Engineering Branch Will Be Provided by 810626 + (20:57:34, 8 January 2025)
- ML17209B176 + (20:57:35, 8 January 2025)
- IR 05000335/1981004 + (20:57:47, 8 January 2025)
- ML17209B174 + (20:57:49, 8 January 2025)
- L-81-176, Ack Receipt of IE Insp Rept 50-335/81-04 on 810217-20.No Proprietary Info.Corrective Actions:Developing Instructions & Forms to Provide Strict Controls for Temporary Changes + (20:57:50, 8 January 2025)
- ML17209B173 + (20:57:50, 8 January 2025)
- L-81-239, Forwards Response to Info Requested in Re post- TMI Requirements for Emergency Operations Facility.Util Established Five Level Hierarchy of Functions Essential to Effective Emergency Operations + (20:57:53, 8 January 2025)
- ML17209B170 + (20:57:53, 8 January 2025)
- 05000335/LER-1981-023-03, /03L-0:on 810501,isolation Valve HCV 14-9 Did Not Shut Fully.Caused by Shut Limit Switch Not Actuating from Remote Operation.Valve Lubricated + (20:57:56, 8 January 2025)
- 05000335/LER-1981-023, Forwards LER 81-023/03L-0 + (20:57:58, 8 January 2025)
- 05000335/LER-1981-020-03, /03L-0:on 810422,control Element Assembly 66 Dropped to Full Insertion.Cause Unknown.Coil Power Programmer 15-volt Power Supply Replaced as Precaution + (20:58:03, 8 January 2025)
- 05000335/LER-1981-020, Forwards LER 81-020/03L-0 + (20:58:05, 8 January 2025)
- 05000335/LER-1981-022-03, /03L-0:on 810421,during Power Ascension After Unit Outage,Containment Radiation Channel MD Failed Low.Cause Not Determined,Since Radiation Detector in High Radiation Field. New Detector Obtained for Replacement + (20:58:07, 8 January 2025)
- L-81-234, Updates 801223 Response to NUREG-0737,Item II.F.2, Instrumentation for Inadequate Core Cooling. Mods to Begin Per C-E Owners Group Reactor Vessel Level Monitoring Sys.Sys Described to NRC at 810304 Meeting in Washington,Dc + (20:58:08, 8 January 2025)
- 05000335/LER-1981-022, Forwards LER 81-022/03L-0 + (20:58:11, 8 January 2025)
- 05000335/LER-1981-021-03, /03L-0:on 810424,during Normal Operation,Channel Mb Containment Pressure Detector Failed.Caused by Force Motor Burnout.Detector Replaced + (20:58:13, 8 January 2025)
- 05000335/LER-1981-021, Forwards LER 81-021/03L-0 + (20:58:15, 8 January 2025)
- 05000335/LER-1981-025, Forwards LER 81-025/03L-0 + (20:58:16, 8 January 2025)
- ML17209B152 + (20:58:18, 8 January 2025)
- ML17209B151 + (20:58:19, 8 January 2025)
- ML17209B150 + (20:58:20, 8 January 2025)
- ML17209B149 + (20:58:21, 8 January 2025)
- ML17209B148 + (20:58:22, 8 January 2025)
- ML17209B146 + (20:58:23, 8 January 2025)
- ML17209B145 + (20:58:24, 8 January 2025)
- ML17209B143 + (20:58:25, 8 January 2025)
- ML17209B142 + (20:58:25, 8 January 2025)
- ML17209B141 + (20:58:26, 8 January 2025)
- ML17209B139 + (20:58:27, 8 January 2025)
- L-81-226, Clarifies 810409 Response to NUREG-0737,Item II.E.4.2.5 Re Containment Pressure Setpoint.Clarifies Bistable Input, Output & Setpoint Value + (20:58:28, 8 January 2025)