Forwards IE Insp Rept 50-389/81-04 on 810309-20 & Notice of Violation
ML17209B181
Person / Time
Site: Saint Lucie 
Issue date: 04/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17209B179 List:
References
NUDOCS 8106100004
Download: ML17209B181 (3)


See also: IR 05000389/1981004

Text

~

~

C

~8 REOI

f

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATI.ANTA,GEORGIA 30303

APR 15

188)

" Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report No. 50-389/81-04

This refers to the special

safety inspection

conducted

by J.

C. Bryant et al of

this office on March 9-20,

1981, of activities authorized

by

NRC Construction

Permit No.

CPPR-144 for the St.

Lucie 2 facility.

Our preliminary findings were

discussed with B. J.

Escue at the conclusion of the inspection.

This inspection

was

a comprehensive

examination of site work in progress

and of

your management

and quality assurance

controls

as applied to that work and other

activities.

In addition to inspection of selected

areas of responsibility at the

site, discussions

were held with many employees

to determine their knowledge of

and ability to carry out their individual responsibilities.

These discussions

~

~

~

~

~

~

included determination of the, employees

freedom to obtain corrective

action

on

safety issues,

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the

inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

,personnel,

and observations

by the inspectors.

During the inspection,

it=was found that certain activities

under your license

appear

to violate

NRC requirements.

These

items

and

references

to pertinent

requirements

are

li'sted

in

the

Notice

of Violation

enclosed

herewith

as

Appendix A.

Elements

to

be

included

in your

response

are

delineated

in

Appendix A.

Two new unresolved

items are identified in the enclosed

inspection report.

These

items will be examined during subsequent

inspections.

In accordance

with Section

2.790 of the

NRC "Rules of Practice,"

Part 2, Title

, 10,

'Code of Federal

Regulations,

a

copy of this letter

and

the

enclosed

inspection report will be placed in the

NRC Public Document

Room. If this report

contains

any information that you believe to be proprietary, it is necessary

that

~

you

make

a written application within 20 days to this office to withhold such

information from public disclosure.

Any such application

must include the basis

for claiming that the information is proprietary and the proprietary information

8X 6>0004

Florida Power and Light Company

APR g g )gag

should

be contained

in a separate

part of the document.

If we do not hear

from

you in this regard within the specified period,

the report will be placed in the

Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/81-04

cc w/encl:

B. J.

Escue, Plant Manager

N. Weems, Assistant

Manager

QA Construction

~

~

ic ard C.

wis, Acting Director

ivision f Resident

and Reactor

Project Inspection

r

l

r