ML17209B173
| ML17209B173 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/25/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17209B171 | List: |
| References | |
| NUDOCS 8106090292 | |
| Download: ML17209B173 (4) | |
See also: IR 05000335/1981004
Text
8
REQ(g
~i
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I I
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
Florida Power and Light Company
MAR 25 ~88>
ATTN:
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report No. 50-335/81-04
This refers to the routine inspection
conducted
by P. Skinner of this office on-
February
17-20,
1981,
of activities
authorized
by
NRC Operating
License
No.
DPR-67 for the St.
Lucie facility.
Our preliminary findings were discussed
with
C.
M. Wethy at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the
inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities
under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
App'en-
dix A.
El'ements to be included in your response
are delineated
in Appendix A.
In accordance
with Section
2.790 of the
NRC "Rules of Practice,"
Part Z, Title
10,
Code of Federal
Regulations,'
copy of this letter and the enclosed
inspec-
tion'eport will be placed
in the
NRC Public
Document
Room. If this report
contains
any information that you believe to be proprietary, it is necessary
that
you
make
a written application within 20- days to this office to withhold such
information from public disclosure.
Any such application must include the basis
for claiming that the information is proprietary
and the proprietary information
should
be contained
in a separate
part of the document.
If we do not hear
from-
you in this regard within the specified period,
the report will be placed in the
Publ ic- Document
Room.
Should you have. any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely
C
. C.
ewis, Acting Director
Division of Resident
and
Reactor Project Inspection
Enclosures:
See
Page
2
S 3,06090Ã+
~
O
Florida. Power and Light. Company
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-335/81-04
cc; w/encl:
C.
M. Wethy, Plant Manager
N. Weems, Assistant
Construction Manager