ML17209B220

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/81-08 on 810311-0410.No Noncompliance Noted
ML17209B220
Person / Time
Site: Saint Lucie 
Issue date: 04/28/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17209B221 List:
References
NUDOCS 8106120436
Download: ML17209B220 (3)


See also: IR 05000335/1981008

Text

~1,AR RE0II

CC

ClO

Ol

g

r

Cl

~0

++*++

J'NITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

APR> 8 1981

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P." 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report No.

0-335 81-

This refers to the routine safety

inspection

conducted

by

S.

A. Elrod of this

office

on Harch ll April 10,

1981, of activities authorized

by

NRC Operating

License

No.

OPR-67 for the St.

Lucie

1 facility. and to the discussion

of our

findings held with C.

M. Wethy at the 'conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the

inspection

consi'sted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within'the scope of this inspection,

no violations or deviations were disclosed.

t

Five

new unresolved

items resulted

from this inspection

and are discussed

in the

enclosed report.

These items will be'examined during subsequent

inspections.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice",

Part 2, Title

10,

Code

of Federal

Regulations,

a

copy of this. letter

and

the

enclosed

inspection

report will.be placed

in the

NRC's Public

Document

Room.

If this

report contains

any information that you (or your contractor)

bel'ieve

to

be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such

information from public disclosure.

Any -such

application

must include

a full statement

of the reasons

on the basis of which it

is claimed that the information is proprietary,

and should

be

prepared

so that

proprietary information identified in the application is contained

in

a separate

part of the document.

If we do not hear from you within the specified

period,

. the report will be placed in the Public Document

Room.

+1

O

C

1

I

<<~

H

H

4

APR2 8

1981

Florida Power and Light Company

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

\\, c

~

~C.

. C.

Le ss, Acting Director

Division of Resident

and

Reactor Project Inspection

Enclosures:

Inspection Report No. 50-335/81-08

cc w/encl:

C.

M. Wethy, Plant Manager

N. Weems, Assistant

QA

Construction Manager