Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212B209 + (20:46:25, 8 January 2025)
- ML17212B202 + (20:46:26, 8 January 2025)
- ML17212B206 + (20:46:26, 8 January 2025)
- ML17212B201 + (20:46:27, 8 January 2025)
- L-81-520, Forwards Responses to Request for Addl Info Re Matrix Power Supply Isolation Device Testing.Responses Will Be Incorporated Into FSAR in Future Amend + (20:46:28, 8 January 2025)
- ML17212B198 + (20:46:28, 8 January 2025)
- ML17212B194 + (20:46:30, 8 January 2025)
- ML17212B192 + (20:46:31, 8 January 2025)
- ML17212B190 + (20:46:32, 8 January 2025)
- L-81-512, Advises of Review of Proposed Amends to Apps a & B of Tech Specs to Reflect Changes in Equipment & Operating Conditions,Per 811120 Telcon.Proposed Revisions Will Be Prepared for Discussion at Meeting Scheduled for Jan 1982 + (20:46:33, 8 January 2025)
- ML17212B186 + (20:46:33, 8 January 2025)
- L-81-510, Submits Instrumentation Installation Schedule for Inadequate Core Cooling Indication Per NUREG-0737.Full Sys Expected to Be Operational by 840115 + (20:46:35, 8 January 2025)
- ML17212B181 + (20:46:38, 8 January 2025)
- L-2017-124, Flooding Focused Evaluation Summary + (20:46:39, 8 January 2025)
- ML17212B179 + (20:46:41, 8 January 2025)
- RAIO-0717-55142, LLC Response to NRC Request for Additional Information No. 51 (Erai No. 8854) on the NuScale Design Certification Application + (20:46:41, 8 January 2025)
- ML17212B168 + (20:46:44, 8 January 2025)
- ML17212B160 + (20:46:45, 8 January 2025)
- NL-17-1267, Report of Changes to Emergency Plan + (20:46:46, 8 January 2025)
- ML17212B151 + (20:46:46, 8 January 2025)
- ML17212B149 + (20:46:47, 8 January 2025)
- ML17212B142 + (20:46:49, 8 January 2025)
- 05000318/LER-1981-041-03, /03L-0:on 810813,plant Computer Failed,Rendering Incore Detector Monitoring Sys Inoperable.Caused by Analog/Digital Converter 1,failing to Read Ref Voltage Values Cycling in & Out of Normal Range.Converter Replaced + (20:46:51, 8 January 2025)
- ML17212B115 + (20:46:52, 8 January 2025)
- ML17212B094 + (20:46:55, 8 January 2025)
- IR 05000335/1981025 + (20:46:58, 8 January 2025)
- L-81-503, Forwards Rept of const/start-up Progress for Oct 1981 & Revised Rept for Sept 1981 + (20:47:00, 8 January 2025)
- ML17212B075 + (20:47:00, 8 January 2025)
- IR 05000335/1981023 + (20:47:04, 8 January 2025)
- ML17212B071 + (20:47:09, 8 January 2025)
- IR 05000335/1981026 + (20:47:10, 8 January 2025)
- L-81-500, Informs That Response to 811109 Auxiliary Sys Branch Questions 410.40 & 410.43-46 Will Be Submitted by 811218 + (20:47:12, 8 January 2025)
- ML17212B068 + (20:47:12, 8 January 2025)
- L-81-485, Forwards Public Version of Revision 10 to Radiological Emergency Plan,Consisting of Organizational Change Affecting Emergency Central Officer Position + (20:47:14, 8 January 2025)
- ML17212B059 + (20:47:16, 8 January 2025)
- ML17212B054 + (20:47:17, 8 January 2025)
- L-81-495, Advises of Commitment to Insure That Plant Staff Can Be Augmented to Levels Specified in Table B-1 of NUREG-0654, Revision 1,within 45 to 75 Minutes of Notification. Capability Meets Intent of 10CFR50.47(b)(2) + (20:47:18, 8 January 2025)
- ML17212B038 + (20:47:21, 8 January 2025)
- ML17212B037 + (20:47:22, 8 January 2025)
- ML17212B036 + (20:47:24, 8 January 2025)
- ML17212B035 + (20:47:25, 8 January 2025)
- L-81-488, Forwards Oct 1981 Const/Startup Progress Rept.Revised Sept 1981 Rept Also Encl + (20:47:26, 8 January 2025)
- L-81-493, Forwards Responses to Requests for Addl Info Re Turbine Missile Analysis.Response Will Be Incorporated Into FSAR in Future Amend + (20:47:28, 8 January 2025)
- ML17212B019 + (20:47:31, 8 January 2025)
- ML17212B022 + (20:47:31, 8 January 2025)
- L-81-487, Advises That Util Will Provide Fully Authorized & Approved Emergency Operating Procedure for Station Blackout by 810331,in Confirmation of 811118 Telcon.Procedure Will Incorporate NRC & C-E Comments + (20:47:32, 8 January 2025)
- L-81-490, Notifies That Info Requested in NRC 810505 Generic Ltr 81-21 Re Natural Circulation Cooldown Was Provided During Review of OL Application + (20:47:34, 8 January 2025)
- L-81-482, Advises That Plant Design Data Re Containment Sump Info,Per NRC 811007 Request,Will Be Provided by 820305 + (20:47:36, 8 January 2025)
- L-81-484, Discusses re-exam of Stretch Power Application Re Sections 7.2.3 Loss of All Non-Emergency AC Power Event, & 7.3.4, Seized Rotor Event, Per Request + (20:47:37, 8 January 2025)
- L-81-481, Documents 811013 Telcon Between Nrc,Util & C-E Re Util Commitment to Perform Equipment Functional Testing & Submit Data Supporting Analytical Chemistry procedure.Post-accident Sampling Sys Irradiation Test Description Encl + (20:47:39, 8 January 2025)
- ML17212B009 + (20:47:42, 8 January 2025)
- ML17212B007 + (20:47:43, 8 January 2025)