Florida Power and 'Light Company
ATTN:
Dr.
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report No. 50-335/81-23
~q g.Q CO+
gg((
egg~
~ $ gg~
J~
p
CO<~q)~<m~),
4Q g~
gag
g8
This refers to the routine safety inspection
conducted
by Mr. B.
R. Crowley of
this office
on
September
29
through
October
2
and
October 13-16,
1981,
of
activities authorized
by
NRC Operating
License
No.
DPR-67 for the
St.
Lucie
facility and to the discussion
of our findings held with Mr. C.
M. Wethy, Plant
Manager, at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
We
have
examined
actions
you
have
taken with regard
to previously reported
unresolved
items.
The
status
of these
items is discussed
in the
enclosed
inspection report.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and 'the enclosed
report will be placed in the NRC's Public Document
Room.
If the
report
contains
any
information that
you believe
to
be
exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone
within ten
days
from the
date
of this letter of your
intention to file a request for withholding;
and (b) submit within twenty-five
days
from the
date
of this letter
a written application
to this office to
withhold such information. If your receipt of this letter has
been
delayed
such
that
less
than
seven
days
are available for your review,
please
notify this
office promptly
so that
a
new due
date
may
be established.
Consistent
with
section
2.790(b)(l),
such
application
must
be
accompanied
by
an affidavit
executed
by the
owner of the information which identifies the
document
or part
thereof sought to be withheld,
and
a full statement
of the reasons
on the basis
of which it is claimed that the
information
should
be withheld
from public
disclosure.
This
section
further
requires
the
statement
to
address
with
specificity the considerations
listed in
The information
sought to be withheld shall
be incorporated
as far as possible into a separate
8ifgpyp
PDR ggpCK~ 8110gP
e
~oooo'~,
PQPi
&Co (+'
- e.
I $
\\
t
1
0
I
,li
Florida Power and Light Company
OCT 3 0 1981
part of the affidavit. If we
do not hear
from you in this regard within the
specified periods
noted above,
the report will be placed in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosure:
Inspection Report No. 50-335/81-23
cc w/encl:
C.
M. Wethy, Plant Manager
N. Weems, Assistant
gA
Construction Manager
bcc w/encl:
NRC Resident Inspector
Document Management
Branch
State of Florida
Paul J. Kellogg, Chief
Reactor Projects
Branch 2
Division of Resident
and
Reactor Project Inspection
BCrowley: aw,
ARHerdt ~ CEMurphy
10/08/81
10/8/81
10/3fY81
R I
J01
inski
1/
1
RI
RII
K a
PJ
logg
10 yg
1
10/
/81