Forwards IE Insp Rept 50-335/81-25 on 810911-1010.No Noncompliance Noted
ML17212B075
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/29/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212B076 List:
References
NUDOCS 8112070438
Download: ML17212B075 (4)


See also: IR 05000335/1981025

Text

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

HJZZM co

Subject:

Report Nos.

-335/81-25

This refers to the routine safety inspection

conducted

by Hr. S.

A. Elrod of this

office on September

11 - October

10, 1981, of activities authorized

by

NRC

License

No.

DPR-67 for the St. Lucie Unit No.

1 facility and to the discussion of

our findings held with Mr. C.

M. Wethy, Plant Manager, at the conclusion of the

inspection.

Areas

examined

during the inspection

and

our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the

scope of this inspection,

no violations or deviations

were disclosed.

We have

examined actions

you have

taken with regard to previously identified

enforcement

matters

and unresolved

items.

The status of these

items is discussed

in the enclosed

report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If the report contains

any information that you believe to be exempt from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office by telephone within ten days

from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days

from the date of this letter

a written application to this office to with-

hold such information.

If your receipt of this. letter

has

been delayed

such that

less

than

seven

days are available for your review, please notify this office

promptly so that

a

new due date

may be established.

Consistent with section

2.790(b)(1),

such application must

be accompanied

by an affidavit executed

by the

owner of the information which identifies the document or part thereof sought to

be withheld, and

a full statement

of the reasons

on the basis of which it is

claimed that the information should

be withheld from public disclosure.

This

section further requires

the statement

to address

with specificity the considera-

tions listed in 10 CFR 2.790(b)(4).

The information sought to

be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we

do not hear from you in this regard within the specified periods

noted above,

the

report will be placed

in the Public Document

Room.

8112070438

811029

PDR

ADDCK 05000335

'PDR

~e'o(si(i

'

I" pi~

4

I

lt

!

A1

Florida

Power

and Light Company

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

P. J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

Enclosures:

Inspection

Report Nos. 50-335/81-'5

cc w/encl:

C.

M. llethy, Plant Manager

N.

'l<eems, Assistant

gA

'onstruction

Manager

B. J.

Escue,

Plant

Manager

bcc w/encl:

NRC Resident

Inspector

Document

Management

Branch

State of Florida

AT-

RII:RRPI

4D

HCDance

10/ q /81

RII'RRPI

P JKe

og

10/y/81

V

~

~

~

H

~

~

h

~ V

~

~

H