Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-87-390, Forwards Response to Generic Ltr 87-12, Loss of RHR While RCS Partially Filled. Util Will Respond to Certain Aspects of Generic Ltr in Future + (19:47:29, 8 January 2025)
- L-87-320, Submits Periodic Update of Spds/Safety Assessment Sys,Per 870317 Milestone Schedule.Hardware & Software for Upgraded Sys Will Be Installed in Nov 1987.Advantages of Inoperable SPDS Listed + (19:47:31, 8 January 2025)
- L-87-381, Forwards Info Requested on Detailed Description of Computer Model Developed to Predict Tube Wear Resulting from Batwing Motion & Rept of 1986 Batwing Wear Insps of Unit 2 Steam Generators + (19:47:33, 8 January 2025)
- ML17221A396 + (19:47:34, 8 January 2025)
- L-87-376, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Scope & Extent of Program Includes All Moderate & High Energy Carbon Steel Piping Sys, Both Nuclear safety-related & nonsafety-related + (19:47:35, 8 January 2025)
- L-87-377, Submits Addl Info in Support of Util 870904 Application for Amend to License NPF-16,revising Tech Spec Surveillance Requirement 4.4.5.2, Steam Generator Tube Sample Selection & Insp + (19:47:36, 8 January 2025)
- IR 05000335/1987011 + (19:47:38, 8 January 2025)
- ML17221A389 + (19:47:40, 8 January 2025)
- ML17221A388 + (19:47:40, 8 January 2025)
- ML17221A385 + (19:47:41, 8 January 2025)
- ML17221A387 + (19:47:41, 8 January 2025)
- ML17221A384 + (19:47:42, 8 January 2025)
- ML17221A383 + (19:47:42, 8 January 2025)
- ML17221A380 + (19:47:43, 8 January 2025)
- ML17221A379 + (19:47:44, 8 January 2025)
- ML17221A378 + (19:47:45, 8 January 2025)
- L-87-369, Application for Amend to License NPF-16,revising Tech Spec Surveillance Requirement 4.4.5.2 Re Steam Generator Tube Sample Selection & Insp by Adding New Section to Exclude Tubing in Batwing Area from Sample Selection.Fee Paid + (19:47:46, 8 January 2025)
- L-87-370, Forwards Proposed Inservice Test Program for Second 10-yr Inservice Testing Interval Beginning on 880211.Util Plans to Submit Revised Tech Specs Re Inservice Testing,Superseding Original Submittals of 1977 & 1978,in Sept 1987 + (19:47:47, 8 January 2025)
- L-87-368, Forwards Rev 0 to MCI-PSL-100, Inservice Insp Second 10-yr Summary Program. Util Requested That Revised Inservice Insp Tech Specs,Submitted on 870817,be Issued Prior to Start of Start of 10-yr Insrvice Insp Interval + (19:47:49, 8 January 2025)
- L-87-356, Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1987 + (19:47:50, 8 January 2025)
- ML17221A369 + (19:47:56, 8 January 2025)
- ML17221A368 + (19:47:57, 8 January 2025)
- L-87-327, Forwards Revised Large Break LOCA ECCS Performance Results for Limiting Break Size for Facility Justifying Increased Steam Generator Tube Plugging Limit of Up to 1,430 Tubes + (19:47:58, 8 January 2025)
- L-87-353, Responds to NRC 870721 Request for Addl Info Supporting Util Response to IE Bulletin 85-003.Electrical Power Removed from Unlisted Motor Operated Valves (Mov).Mov Reviewed for Compliance W/Ie Bulletin 85-003 + (19:47:59, 8 January 2025)
- ML17221A362 + (19:48:01, 8 January 2025)
- L-87-352, Forwards Revised Response to Insp Repts 50-335/87-11 & 50-389/87-10.Corrective Actions:Temporary Change Issued to Operating Procedure I-0530020 & Will Remain in Effect Until Procedure Revised to Reflect Current Method of Operation + (19:48:02, 8 January 2025)
- ML17221A359 + (19:48:04, 8 January 2025)
- ML17221A357 + (19:48:05, 8 January 2025)
- IR 05000335/1987018 + (19:48:09, 8 January 2025)
- ML17221A354 + (19:48:11, 8 January 2025)
- L-87-339, Submits Proposed Schedule for Util Responses to NRC 870804 Telcon Request for Addl Info Re NUREG-0737,TMI Action Item II.D.1, Performance Testing of Relief & Safety Valves + (19:48:12, 8 January 2025)
- ML17221A351 + (19:48:12, 8 January 2025)
- ML17221A345 + (19:48:15, 8 January 2025)
- ML17221A344 + (19:48:16, 8 January 2025)
- ML17221A342 + (19:48:17, 8 January 2025)
- L-87-351, Forwards Written Explanation of Plans for Insp of Steam Generators,Specifically Plans for Tubes in Batwing Area. Supporting Documentation Encl + (19:48:18, 8 January 2025)
- TAC:61216 + (19:48:19, 8 January 2025)
- ML17221A339 + (19:48:20, 8 January 2025)
- ML17221A337 + (19:48:21, 8 January 2025)
- L-87-345, Remits Fee for Review of Alternate Safe Shutdown Capability, Per RM Diggs 870713 Request + (19:48:22, 8 January 2025)
- NL-17-0348, Proposed Alternative FNP-ISI-ALT-05-01 in Accordance with 10CFR50.55a(z)(1) to Utilize ASME Code Case N-854 + (19:48:23, 8 January 2025)
- ML17221A328 + (19:48:24, 8 January 2025)
- L-87-338, Application for Amends to Licenses DPR-67 & NPF-16,revising Surveillance Frequency for Tripping Plant to Demonstrate Control Element Assemblies from within 24 H to within 7 Days Prior to Reducing Shutdown Margin.Fee Paid + (19:48:25, 8 January 2025)
- ML17221A324 + (19:48:26, 8 January 2025)
- L-87-343, Responds to Violations Noted in Insp Repts 50-335/87-11 & 50-389/87-10.Corrective Actions:Temporary Changes to Operating Procedures 1-0530020 & 1-0530021 Implemented & Will Remain in Effect Until Procedures Revised + (19:48:27, 8 January 2025)
- ML17221A322 + (19:48:29, 8 January 2025)
- ML17221A320 + (19:48:30, 8 January 2025)
- L-87-322, Requests That Implementation Schedule for Compliance W/Atws Rule Be Delayed Until Fourth Outage Scheduled for Feb 1990. NRC Review & Approval of Util Proposed Implementation Plan Needed Before Implementation Can Occur + (19:48:31, 8 January 2025)
- IR 05000335/1987017 + (19:48:34, 8 January 2025)
- ML17221A317 + (19:48:35, 8 January 2025)
- ML17221A315 + (19:48:37, 8 January 2025)