ML17221A380
| ML17221A380 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/08/1987 |
| From: | EBASCO SERVICES, INC. |
| To: | FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17221A382 | List: |
| References | |
| SK-83-02-M-002, SK-83-2-M-2, NUDOCS 8709110327 | |
| Download: ML17221A380 (1) | |
Text
3 10 12 13 14 15 16 17 18 19 8770-G-206 SI-I I (n(-.~)
21L0 FH 3
FH 4
2TL 4o FH 5.
3i -/oo to MATCH LINE SFE DW6 8110 6 I12 (J-io)
FH (0
A RAA "o
ooot Io PIPE SLEEVE
~ ~.
0 10"-FS-SIO EL. I(o' 45'OR COMPONENT COOLANT I '-CC-ISO Of Ut vtJ t/t B
C D
F RAC EL.
I B'- 0 I IL3 2LF5-o52I EL I '5-I 3 FS-520 CL.tEJ-I F
5 4 CL. IS"0 IE-FS 50I EL.'i(IL0 t
d 0
in S'710 Ci ZOG SH. 2 (N-5) tao PiPC SLEEVE 8'F'5-524 CI 6899 iltatil 0
J Io PIPE. SLCCVE (TYPJ 8770-G 20/o (SII,ET(E-5)
V-4201 Bl t43-I 3 P5-524 KL i Bo I
3 =~ 555 t
aEL I I-3 EL. 5.
I"pipt lattvE Pad MATCH LINE IP oa I
av 0
0 LJt PILIGo-Io" OttPE Itt PIPE, SLCEVt o al to PIPE %LEEVE I/Iotpc tatev 4
tililI'atll D
8.it-3 I lvl
'IVAl CLE o
I 4511 SH A
0 0 G-2 2 tJ-SI VOTES:
A,LL PIPING TO CONFORM TO EBASCO PIPING LINE LIST DRAWING 8110- B-052 tv SPEC. 81'70-FLO-H9 NO ALLOWANCE HAS BEEN MADE FOR WELDS OR GASKETS.
t UNLESS QTHERWISE NOTED:
ELBOWS TO BE LONG RADIUS AND INDICATED BY SHARP CORNERS; ALL PIPING 2 INCHES AND SMALLER, EXCEPT WHERE DIMENSIONED ON DRAWINGS TO BE FIELD RUN.
FOR SMALL BRANCH PIPE CONNECTIONS, SEE DESIGN GUIDES M4-20 AND M4-21 AND THE PIPING
(,INE LIST.
FIELD TO SET ALL PIPE SLEEVES IN CONCRETE BEFORE CONCRETE IS PLACED. SEE CONCRETE HYDRAULIC DRAWINGS FOR TYPICAL DETAILS OF PIPE SLEEVES AND PIPE OPENINGS REQUIRING SPECIAL FRAMING.
PIPING WILL NOT BE CUT FOR COLD SPRING.
SEE DESIGN GUIDE M11 1
DESIGN AND LOCATION OP PIPF HANGERS FOR THE SUPPORTrOF DEAD WEIGHT BY HANGER FABRICA-l TOR.
ANCHORS AND RESTRAINTS FOR SEISMIC PROTEC-TION TO BE DESIGNED BY HANGER FABRICATOR AT THE LOCATIONS SHOWN ON THE EBASCO STRESS ANALYSIS OPENINGS 8 INCHES IN DIAMETER AND LARGER, IN GRATING AND CHECKERED PLATE FLOORS FOR SHO?
FABRICATED PIPING SHALL BE PROVIDED BY STRUCTURAL STEROL FABRICATOR. ALL OTHER OPENINGS IN GRATING AND CHECKERED FLOOR PLATES SHALL BE PROVIDED IN THE FIELD.
ALL OPENINGS, EXCEPT THOSE FOR STRESS ANA-LYZED PIPELINES, SHALL CLEAR PIPE INSULA-TION BY A MINIMUMOF I INCH BEYOND EXTREMEi PIPE MOVEMENT.
D F
RAA FH 2
2I -D 4
d o
F FH3 4.EL. 2216 34'.0 I. 2' L
/2-CW-l78 GAEL. GSLG 20LO FH4 PLAN BELOW EL. I9'-0
. 2TLCto FH 5
(A-4)
FOR CQI4T SEE DWG. 8110-G.I80 FOR CONT. SEE DWG. 8770-G-IISI (s-is)
E tv to 9 ol 9
IS Bl -Go 9
U
,Y'e IS El IEI 5-5 (C" I 2)
FH
/to FOR CONT. SEE. DWG. 8110-6-205 REFERENCE DRAWINGS, aJ, H,"
STD 2/2" FIRE ai".SE CONN Lt liNITH SCREt CAto IO FS 510 EL. 59 3 I
I CAPPED CONN.
II0i. F ~+ ~
I 0 "
I= S - 5 I 0 (StPNOH aSt2K) t 4 EL 23L 3 8'/2 8'/2 G'- I'/zo mwmi~og m
ww SalM P 8 I10-G ZOEt SH.Z (H-5)
PS
/2-FS 508 IZ-CC 130 FUEL POOL HT. EXCHANGER FOR COMPONENT COOLANT PIPING SEE DWG. 8110-G-180 I '-IZS ELEC1 RACEWAY LI'ST OF DRAWINGS 8 l10-A-l46 INSTRUMENT LIST -'IPE, VALVES 4 INSTRUMENT SYMBOLS 81'TO-6-270 PIPE LINE LIST~
8110- 8-052 VALVE 4 SPECIALTY LIST '
I10 - A-05 I FUEL POOL SYSTEM P
Fo 10~
8l'TO-8 I
SPENT FUEL P IT COOLANT PJ Pl NG PLAIJ 87 70. Ci-20/tt 5H 1
14 PIPE.
FUEL POOL SKIMMER 2"N 4 )a2 t
ot O
M SPENT FUEL RACK FUEL POOL Pi'T LINER
)4 SYPHON BREaaKE R -I 2/t HIS RtitlOVttasLE BULKHEAD
- FS 52I EL 40'to
- FS-520 P E~L40-7/I t
3"- FS 524 I
WP EL 37L2 I
-IE 7/f/N H/P///4 14K/a/lt SN SEC'4 AIF/F//V%K@ PAAR%
Ta AFEZHcN NAJPEjt.
/ c/'m /+z-/s('401 3'L F5-524 KL 23'.ai'/
0 Vl aa 0
I2 0
0:
aL I.F5-5al 5 t-4-IB E
SN 2 (E-5) 5 44I2 a
0 Q'a IOxtS RED.
V 4208 v 4209
-Pt-5/o2
-FS-SO2
.FS Pt.2I TKE tats Ecc tLEL.CI
- 0. IFta V-4202 V-4205 I "VENT /
IE'FS-50I 433 433 PI 44ttt at v-4229 SLP3-52&
kiMt-5 V.4236 FS-ttl 3" PIPE SLEEVE (TVP)
PL'J.
-S ROOF EL281 Et" ttttv p ON ]
I-I ta tn ao aaa $
?a. Q.
Dtacket g mattattt) tF at /0 I I I ~3~
otat to t
REGULATIORYDOCKET FILE I
0 I/4 =I-0
'l APERTURE CARD IO 15 FT.
M, K.
1 N
RAC tta IT taa Z
an tS 0
369 I5 18" I
I I
tU aa L-.
PLAN ABOVE EL. I9-0 3-FS'555 EL EICOS~
I F5-5(:-
VENI V4222.
PZ I-4 /4
/8 Pr522 F:P PUR PUMP 8 7 70- G -20G SH. 2 (N-I2) il PtPC aattavE LADDER~
INWAV C
81 G 206 SH.Z (J-SI
+.
FLORIDA POWER & LIGHT COMPANY ST LUCIE PLANT 1978 890,000 KW INSTALLATIONUNIT NO. I SPENT FUEL PIT COOLANT PIPING PLAN EBASCO SERVICES INCORPORATED NEW YORK ooopolc coNTIIOLo Oooo.
10 12 13
-.14 NO.
DATE REVISION APPROVED SCALE I/4 jl 0 Ply MECH.