Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17223B069 + (19:14:17, 8 January 2025)
- ML17223B067 + (19:14:17, 8 January 2025)
- ML17223B066 + (19:14:18, 8 January 2025)
- IR 05000335/1990027 + (19:14:28, 8 January 2025)
- ML17223B060 + (19:14:29, 8 January 2025)
- ML17223B059 + (19:14:30, 8 January 2025)
- 05000389/LER-1990-006-03, :on 901219,inadvertent Actuation of Auxiliary Feedwater Sys Equipment Occurred During Monthly Functional Testing.Caused by Equipment Failure.Details of Event & Troubleshooting Plan Reviewed + (19:14:32, 8 January 2025)
- ML17223B057 + (19:14:33, 8 January 2025)
- ML17223B056 + (19:14:34, 8 January 2025)
- ML17223B055 + (19:14:37, 8 January 2025)
- ML17223B053 + (19:14:38, 8 January 2025)
- L-90-395, Application for Amends to Licenses DPR-67 & NPF-16,revising Tech Specs Re Organizational Titles + (19:14:39, 8 January 2025)
- ML17223B047 + (19:14:39, 8 January 2025)
- L-90-455, Corrects 901121 Response to Violations Noted in Insp Repts 50-335/90-23 & 50-389/90-23.Corrective Actions Re Maint Personnel Training on Revised Matl Control Procedures Will Be Completed by 910228 + (19:14:41, 8 January 2025)
- L-90-454, Advises That Emergency Response Agencies Will Conduct Exercise of Emergency Plan for Plant on 910320 & 21. Odjectives for Exercise Encl + (19:14:42, 8 January 2025)
- L-90-453, Forwards Results of Unknown Spiked Samples Received on 901024 + (19:14:43, 8 January 2025)
- L-90-451, Advises of Completion of All Recommendations in Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment for Unit 2,per .Unit 1 Implementation Scheduled for Completion During Fall 1991 Refueling Outage + (19:14:45, 8 January 2025)
- L-90-452, Submits Comments on Draft Safety Evaluation on Station Blackout Rule (10CFR50.63),per NRC 901121 Request + (19:14:46, 8 January 2025)
- L-90-437, Revises 881024 Application for Amend to License NPF-16, Increasing Max Allowable RTD Delay Time from 16 to 14 s, Per NRC Request + (19:14:48, 8 January 2025)
- TAC:69863 + (19:14:48, 8 January 2025)
- ML17223B037 + (19:14:50, 8 January 2025)
- L-90-435, Forwards Response to Generic Ltr 90-06 Re Resolution of Generic Issue 70 on PORV & Block Valve Reliability & Generic Issue 94 on Addl Low Temp Overpressure Protection + (19:14:51, 8 January 2025)
- 05000389/LER-1989-009, :on 891128,containment Purge Valve Local Leak Rate Exceeded Tech Spec Limits.Caused by Valve Closure Stop Out of Adjustment.Testing Frequency Increased to Once Every 6 Wks + (19:14:53, 8 January 2025)
- ML17223B034 + (19:14:54, 8 January 2025)
- ML17223B033 + (19:14:54, 8 January 2025)
- L-90-436, Forwards Monthly Operating Repts for Nov 1990 for St Lucie Units 1 & 2 & Revised Operating Data Rept for Aug 1990 for Unit 2 Also Encl + (19:14:55, 8 January 2025)
- 05000389/LER-1990-004-02, :on 901109,inadvertent Actuation of Assorted Engineered Safeguards Equipment,Including Emergency Diesel Generator 2A,occurred.Caused by Personnel Error.Personnel Counseled + (19:14:57, 8 January 2025)
- ML17223B029 + (19:14:58, 8 January 2025)
- L-90-399, Advises That ATWS Sys Implementation Complete & in Compliance w/10CFR50.62, Requirements for Reduction of Risk from ATWS for LWR Power Plants + (19:14:59, 8 January 2025)
- ML17223B021 + (19:15:01, 8 January 2025)
- ML17223B020 + (19:15:02, 8 January 2025)
- ML17223B018 + (19:15:03, 8 January 2025)
- L-90-402, Advises That Licensee Completed First Verification of Structural Integrity of old-style CEAs in Unit Core on 901128,per NRC Request + (19:15:04, 8 January 2025)
- L-90-407, Quarterly Turtle Activities Rept for Third Quarter 1990 + (19:15:05, 8 January 2025)
- L-90-413, Documents 901123 Request & Verbal Approval of Temporary Waiver of Compliance from Tech Spec 3.7.3, Ccws + (19:15:07, 8 January 2025)
- L-90-400, Confirms That All Mods for Facility Completed & Operational. All Actions to Be Taken in Response to Generic Ltr 88-17 Complete + (19:15:09, 8 January 2025)
- ML17223B011 + (19:15:10, 8 January 2025)
- ML17223B010 + (19:15:11, 8 January 2025)
- L-90-404, Informs That 10CFR50.46 Rept of Changes/Errors in ECCS Limiting Transient Models for 891017-901016 Will Be in Mar 1991.Changes Discussed W/Facility NRC Project Manager + (19:15:13, 8 January 2025)
- L-90-397, Forwards Monthly Operating Repts for Oct 1990 for St Lucie Units 1 & 2 & Revised Data Rept for June 1990 for Unit 1 + (19:15:15, 8 January 2025)
- L-90-398, NPDES Discharge Monitoring Rept for Sept 1990 + (19:15:16, 8 January 2025)
- ML17223B000 + (19:15:19, 8 January 2025)
- L-90-393, Submits Addl Info on Proposed License Amend to Increase Max Allowable RTD Delay Time as Requested at 900920 Meeting W/ NRC + (19:15:20, 8 January 2025)
- 05000335/LER-1990-004-01, :on 900228,inadvertent Partial Actuation of Train a Containment Isolation & Containment Spray Sys Occurred + (19:15:22, 8 January 2025)
- ML17223A994 + (19:15:23, 8 January 2025)
- ML17223A992 + (19:15:24, 8 January 2025)
- ML17223A986 + (19:15:26, 8 January 2025)
- ML17223A984 + (19:15:27, 8 January 2025)
- ML17223A982 + (19:15:28, 8 January 2025)
- 05000335/LER-1990-009-02, :on 900924,ESF Valve Closure Occurred Due to Failed Relay + (19:15:29, 8 January 2025)
- ML17223A979 + (19:15:31, 8 January 2025)