ML17223B033
| ML17223B033 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/30/1990 |
| From: | Breen J FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17223B032 | List: |
| References | |
| NUDOCS 9012210145 | |
| Download: ML17223B033 (11) | |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-335 UNIT St. Lucie 1
DATE O.EC 1 4 1990 COMPLETED BY J. J.
Breen TELEPHONE 407 465-3550 MONTH NOVEMBER 1990 DAY AVERAGE DAILY POWER (MWe-Net)
LEVEL 11/ 1/90 11/ 2/90 11/ 3/90 1:l/ 4/90 ii/ 5/90 6/98
- li/ 7/90 11/ 8/90 11/ 9/98 1:l/1 0/90 11./11/98 11/12/90 11/13/98 1:l/:l4/90 11/15/90 1:l/16/90 11/17/90 1:l/:l8/90 11/19/98 11/2n/90 11/21/98 11/22/90 11/23/90 ii/24/90 11/25/90 11/26/90 11/27/98 11/28/90 11/29/90 11/30/98 845 865 864 866 865 866 864 863 862 864 864 867 866 865 867 867 868 866 863 862 859 9012210145 901214 PDR ADOCK 05000335 R
0
~ l
OPER*TXNG DATA RFPORT QPERATXNG STATUS DOCKET NQ 50 335 DATE 12/19/9e COMPLETED BY Ji J+
BREEN TELEPHONE 407/465/3550 1.
UNXT NAMEi STi LUCXE UNXT 1
2.
REPORTXNG PERXODi NOVEMBER 1990 3+
LXCENSED THERMAI.. POWER (MWT)+
zron 4+
NAMEPLATE R*TXNG (GROSS MME)i 85e
- =.,
DESXGN ELFCTRXChL RATXNG <NET MWE):
8S<)
6i MAXXMUM DEPENDABLE CAPACXTY (GROSS MHE)+
872 7,
MAXXMUM DEPENDABLL" CAPACXTY (NET MHE)l 839 8.
XF CHANGES OCCUR XN CAPACXTY RATXNGS
<XTEMS NUMBER 3 THRQUGI-I 7)
SXNCE LAST REPORTS GXVE REASONS) 9, PQHER LEVFL TO WHXCH RESTRXCTFD~
XF ANY (NET MHE) ie, REASONS FQR RESTRXCTXQNS XF ANY; MONTHLY
-YTD-CUMUI ATXVE 11.
I-IOURS XN REPORT PERXOD:
12, NUMBER OF HOURS REACTOR HAS CRXTTCAL 1S, REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15>
UNXT RESERVE SHUTDOWN HOURS 16, GROSS THERMAL ENFRGY GENERATED (MHI-I) 17, GROSS ELECTRXCAL ENERGY GENERATED (MHH) 18'ET ELECTRXCAL ENERGY GENERATED (MHH) 19.
UNXT.ERVXCE FhCTOR Ze.
UNXT AVAXLABXLXTYFACTOR Zii CAPACXTY FACTOR (USXNG MDC NET)
ZZi CAPACXTY FACTOR (USXNG DER NET)
Zsi UNXT FORCED OUTAGE RATE 24 'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS a
72e 72e+e 0.0 72e+e ewe 1943136 654e80 6Z1821 100.0 ieeie iezi9 ie4ii ewe Se16 4825+9 o,e 4r..s.4 ewe 1Z333068 410943e 387e868 58' 58+9 57 i 6 58+2 18 i 9 122232ie 92214i5 ze5 s
9136ei4 39 is 235290708 775525ee 73269733 r4,7 74i8 74 i 4 rsis 25 XF SHUT DOWN AT END OF REPORT PERXQD~
ESTXMATED DATE OF STARTUP'
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVEMBER, 199 0 DOCKET,NO 50-335 UNITNAMEST. LUCIE g1 DATE COMPLETED BYJ.
Z.
BREEN
~EPHONE 4 07-4 65-3 55 0 Date Type Duration (Hours)
Reason2 Method of Shutting Down Reactor Licensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto PreventRecurrence Unit 1 remained at full power for the month of November.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest
. C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error(Explain)
H - Other(Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit 1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO ~ 50-335 UNIT St. Lucie 1
DATE O~t, i 4 1999 COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 REPORT MONTH NOVEMBER 1990 For the month of November Unit 1 remained at full power.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St.
Luck.e 2
OEC 14 199O COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 MONTH NOVEMBER DAY AVERAGE DAILY 1990 POWER LEVEL (MWe-Net) ll/ 1/90 ll/ 2/90 ll/ 3/90 li/ 4/90 11/ 5/98 ll/ arSe il/ 7/90 11/ 8/90 ll/ 9/90 11/18/98 ll/11/90 11/12/90 ll/13/98 ii/14/90 11/15/90 11/16/90 11/17/98 11/18/90 11/19/90 11/28/90 11/21/90
).1/22/9e ll/23/90 11/24/90 11/25/98 11/26/90 11/27/98 11/28/98 11/29/90 li/30/90
-3
-3
-3
-3
-3
-3 2
-4
-3
-"3
-27
-30
-28
. 79
-29 3 1
OPERATING DATA REPORT OPERATING STATUS DOCI<ET HO 50 389 DATE 12/ IR/98 COMPLETED BY J.
J+
BREEH TELEPHONE 407/465/3550 1
o UNXT NAME+
ST.
I..UCIE UNIT 2 2 i REPORTING PERIOD+
NOVEMBER 1998 3+
LICENSED THERMAL POWER (MWT)+
z7ee 4o HAMEPLATE RATING (GROSS MWE)i 850 5i DESXGN ELECTRXCAL RATTNG (NFT MI4E)i 838 6,
MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE)l 882 7a MAXTMUM DEPENDABLE CAPACITY (NET MWE> o 839 8
IF CHANGES OCCUI XN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~
GIVE REASONS; 9 i O'OWER LEVEL TO WHXCI-I RESTRICTED ) IF AHY
( HET MWE )
Ie.
REASONS I=OR RESTRICTIONS ~ IF AHYl MONTHLY
-YTD-CUMUf ATIVE
- Li.
I-IOURS XH REPORT PERIOD+
12 i NUMBER OF I.IOIJRS REACTOR WAS CRITICAL 13'EACTOR RESERVE SHUTDOWN HOURS 14, I4QIJRS GEHERATOI ON-LINE 15'NXT RESERVE SHUTDOWN HOURS
- L6i GROSS THERMAL ENERGY GENERATED
<MWH)
- L7, GROSS ELECTRIChL ENERGY GENERATED (MWH) 18, NET ELECTRICAL EHERGY GENERATED
<MWH>
19'NXT SERVXCE FACTOR Ze e
UNIT AVAILABXLITYFACTOR Zii CAPACITY FACTOR (USXNG MDC NET) 22.
CAPACITY FhCTOR (USING DER NET) 23'JHXT FORCED OUTAGE RATE Z4.
SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS 728 45,e eie eie eie 0
0
-7288 0 i 0 0.0 e,e e,o 0.0 8016 5987+4 8+8 5839i8 eie 15415989 5113870 4822084 72 i 9 72>9 7107 7215 iei9 64129 i 8 54156+3 eie 53194+5 ewe 139213385 46365788 43835198 82' Bzi9 83iz 83iz 5i9 25, XF SHUT DOWN AT END OF REPORT PERIOD~
ESTXMATED DATE OF STARTUP: 12/g/98
r
~
4
~ i 1'
~
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
DATE ST.
LUCZE g2 g g4$ 90 NOVEMBERI 1990 REPORT MONTH Z. Z.
BREEN COMPLETED BY 407-465-3550 Date Type Duration (Hours)
Reason2 Method of Shutting Down Reactor Licensee Event Report¹ System Code 4 Component Codes Cause 5 Corrective Actionto Prevent Recurrence 18 900930 720 N/A C
FUELX Unit 2
has been in a
refueling outage for the month of November.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training 8 LIcense Examination F - Administrative G - Operational Error(Explain)
H - Other(Exphin)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source
ltd C~
Ny
~ lv Cp Al I'
t I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT 86. Lucie 2
P fQ 5'4 1SSO COMPLETED BY J. J.
Breen TELEPHONE 407 465-3550 REPORT MONTH NOVEMBER 2.990 During the month of November Unit 2 has been in a refueling outage.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.