ML17223B053

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept Administered on 901029-1109.Training Deficiencies Noted But Program Rating Satisfactory
ML17223B053
Person / Time
Site: Saint Lucie 
Issue date: 12/28/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17223B054 List:
References
NUDOCS 9101140037
Download: ML17223B053 (4)


Text

December 28, 1990 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President Nuclear P.

O. Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

ST.

LUCIE REQUALIFICATION EXAMINATIONREPORT 50-335/OL-90-02 The NRC administered examinations during the weeks of October 29 and November 5, 1990, to employees of your company who currently hold licenses to operate the St. Lucie facility.

At the conclu-sion of the site visit, preliminary findings were discussed with those members of your staff identified in the enclosed report.

Based on the results of this evaluation, the requalification program continues to be rated as satisfactory.

Your examina-tion team members were very effective and dilegent in their implementation of this process.

However, several training deficiencies were noted.

Specifically, several knowledge and ability weakness by the operators were noted on the written examination, and one case of inadequate conflict resolution ability was noted in the simulator examination.

Except in one

instance, the operators demonstrated adequate familiarity and ability with EOP-15, Functional Recovery.

Enclosure 3 details these findings.

l In accordance with 10 CFR 2.790(a),

a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed bg T, A, peebl,es)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety 3 ~

4 Enclosures,:

1.

Examination Report No. 50-335/OL-90-02 2.

RO/SRO Written Examinations with answers (Document Control Desk Only)

Requalification Program Evaluation Simulation Facility Fidelity Report 9101140037 901228 PDR ADDCK 05000335 V

PDR

Florida Power and Light Company 2

Deceg4ep 28,

$990 cc w/encls. 1,.3, and 4:

G. Z. Boissy, Plant Manager P.

N. McCullough, Manager, Nuclear Training P. Fincher, Training Manager cc w/encl 1:

State of Florida bcc w/encls 1, 3,

and 4:

J. Norris, NRR

'A. Gibson, DRS R. Crlenjak, DRP S. Elrod, St. Lucie Senior Resident Inspector Z. Moorman, DRS Operator Licensing Branch, NRR bcc w/encls 1, 2, 3, and 4:

Document Control Desk

  • JMoorman:jm/btm
  • CCasto 12/

/90 12/

/90 rlenjak 12/za /90

  • FOR PREVIOUS CONCURRENCE SEE ATTACHED COPY RII:DRS RII DRS RI RP RII:D S

,/

Pee es 12/,gg /90

Florida Power and Light Company 2

December 28, 1990 bcc w/encls 1, 3, and 4:

J. Norris, NRR A. Gibson, DRS R. Crlenjak, DRP S. Elrod, St. Lucie Senior Resident Inspector Z. Moorman, DRS Operator Licensing Branch, NRR bcc w/encls 1, 2, 3, and 4:

Document Control Desk RII D S

RII:DRS g~

JMo an:jm/btm CCa to 12/ q~ /90 12/

/90 RII:DRP RCrlenjak 12/

/90 RII:DRS Peebles 12/

/90