Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228B300 + (18:34:06, 8 January 2025)
- ML17228B296 + (18:34:09, 8 January 2025)
- ML17228B295 + (18:34:16, 8 January 2025)
- ML17228B294 + (18:34:18, 8 January 2025)
- ML17228B292 + (18:34:19, 8 January 2025)
- L-95-280, Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2 + (18:34:20, 8 January 2025)
- ML17228B290 + (18:34:25, 8 January 2025)
- ML17228B289 + (18:34:26, 8 January 2025)
- L-95-274, Forwards Rev 1 to Plan to Improve Operational Performance at Plant + (18:34:27, 8 January 2025)
- L-95-246, Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS + (18:34:28, 8 January 2025)
- L-95-252, Comment Supporting RG DG-1043,Rev 2 to RG 1.49, NPP Simulation Facilities for Use in Operator License Exams + (18:34:30, 8 January 2025)
- L-95-254, Withdraws Portion of Amend Request Involving Audits of Fire Protection Programmatic Controls,Fire Protection Equipment & Program Implementation + (18:34:31, 8 January 2025)
- 05000335/LER-1995-003, :on 950708,automatic Reactor Trip Occurred During Overspeed Surveillance Testing Due to Personnel Error.Counselled Operations Personnel Involved W/Event & Made Procedure Changes + (18:34:33, 8 January 2025)
- 05000335/LER-1995-008, :on 950828,HPSI Pump Operation During Plant Conditions Was Not Allowed by TS Due to Personnel Error. Notified Operations Dept Personnel of Lack of Clarity in TS Applicability Statement & TS Changes + (18:34:35, 8 January 2025)
- L-95-264, Grants NRC Permission to Copy Final Plant Specific Seismic Adequacy Evaluation of St Lucie Unit 1 to Resolve USI A-46 & GL 87-02 + (18:34:35, 8 January 2025)
- ML17228B278 + (18:34:37, 8 January 2025)
- L-95-259, Monthly Operating Repts for Aug 1995 for St Lucie Units 1 & 2 + (18:34:38, 8 January 2025)
- L-95-262, Forwards Matrix Including Description of Each Corrective Action & Current Status Re Series of Events at Facility + (18:34:40, 8 January 2025)
- ML17228B275 + (18:34:41, 8 January 2025)
- ML17228B273 + (18:34:43, 8 January 2025)
- ML17228B272 + (18:34:44, 8 January 2025)
- ML17228B271 + (18:34:45, 8 January 2025)
- ML17228B270 + (18:34:46, 8 January 2025)
- IR 05000335/1995016 + (18:34:54, 8 January 2025)
- ML17228B267 + (18:34:55, 8 January 2025)
- L-95-258, Special Rept:On 950812,post Hurricane Erin Beach Dune Survey Performed.Average Values of Results Greater than or within Range Provided in St Lucie Unit 1 Final Usar,Section 2.4.2.2 & Acceptable + (18:34:56, 8 January 2025)
- ML17228B265 + (18:34:58, 8 January 2025)
- ML17228B263 + (18:34:59, 8 January 2025)
- ML17228B261 + (18:35:00, 8 January 2025)
- ML17228B260 + (18:35:01, 8 January 2025)
- 05000335/LER-1995-007, :on 950817,inadvertent Containment Spray Via 1A Low Pressure SI Pump While Venting ECCS During Startup Due to Inadequate Procedure.Operators Stopped 1A LPSI Pump & Isolated SDC HX to Stop Spray + (18:35:04, 8 January 2025)
- IR 05000335/1995013 + (18:35:07, 8 January 2025)
- ML17228B252 + (18:35:08, 8 January 2025)
- ML17228B251 + (18:35:10, 8 January 2025)
- L-95-232, Forwards Responses to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Util Considers Submittal Complete Response to Requests in GL Supplement + (18:35:11, 8 January 2025)
- ML17228B249 + (18:35:11, 8 January 2025)
- L-95-230, Monthly Operating Repts for July 1995 for St Lucie Units 1 & 2 + (18:35:14, 8 January 2025)
- ML17228B247 + (18:35:14, 8 January 2025)
- L-95-215, Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 + (18:35:16, 8 January 2025)
- ML17228B245 + (18:35:16, 8 January 2025)
- ML17228B242 + (18:35:18, 8 January 2025)
- L-95-233, Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 + (18:35:19, 8 January 2025)
- L-95-226, Requests Approval to Incorporates ASME Section XI Code Case N-532,for Use in St Lucie Units 1 & 2 Ten Year ISI Programs + (18:35:20, 8 January 2025)
- ML17228B237 + (18:35:22, 8 January 2025)
- ML17228B235 + (18:35:23, 8 January 2025)
- ML17228B234 + (18:35:24, 8 January 2025)
- PNO-II-95-047, on 950802,plant Declared Unusual Event Due to Two Gpm Leak from 1A2 RCP Seal to Containment Sump.Unit 1 Shut Down in Mode 3 Preparing for Restart After Hurricane Erin Passed + (18:35:26, 8 January 2025)
- IR 05000335/1995012 + (18:35:50, 8 January 2025)
- 05000335/LER-1995-003-02, :on 950708,automatic Reactor Trip Occurred During Turbine Overspeed Surveillance Testing Due to Personnel Error.Personnel Involved in Event Counseled & Procedure Changes Being Made + (18:35:54, 8 January 2025)
- ML17228B229 + (18:35:55, 8 January 2025)
- ML17228B226 + (18:35:57, 8 January 2025)