October 10, 1995 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President Nuclear Division P. 0.

Box 14000 Juno

Beach, FL 33408-0420 SUBJECT'LANT PERFORMANCE REVIEW (PPR) - ST.

LUCIE

Dear Mr. Goldberg:

On September 21,

1995, the NRC staff completed the semiannual Plant Performance Review (PPR) of St. Lucie.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by regional management to facilitate planning and allocation of inspection resources.

The PPR for St, Lucie involved the participation of all Regional Technical Divisions and NRR in evaluating inspection results and safety performance information for the period from March 1995 to September

1995, PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the St.

Lucie PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 6 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact K. Landis at (404) 331-5509.

Sincerely, Orig signed by Ellis W. Merschoff W5<023030e 95aoXO PDR ADOCK 05000335 P

PDR Docket No.:

50-335, 50-389 License No.:

DPR-67, NPF-16

Enclosure:

Inspection Plan cc w/encl:

(See page 2)

Ellis W. Merschoff, Director Division of Reactor Projects OFFICIAL COPY

FPLL cc w/encl:

D. A. Sager Vice President St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 H.

N. Paduano, Manager Licensing and Special Programs Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 J. Scarola Plant General Manager St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 Robert E.

Dawson Plant Licensing Manager St.

Lucie Nuclear Plant P. 0:

Box 128 Ft,. Pierce, FL 34954-0218 J.

R.

Newman, Esq.
Morgan, Lewis

& Bockius 1800 M Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, FL 33131-2398 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 cc w/encl:

Continued see page 3

FPKL cc w/encl:

Continued Joe Ayers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R.

L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 3300 Rockville, HD 20852 Distribution w encl:

J. Norris, NRR G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Comm.

7585 South Highway AIA Jensen

Beach, FL 34957-2010 OFFICE RII SIGNATURE NAME RII KL di Rll Rll asto 10 2

/95 a

ES NO 10 /(6 / 95 ES NO DATE 10/

/95 COPY?

YES NO OFFICIAL R RO COPY OCUHENI'AH.

GsiSL.PPR 1

(i /95 ES NO 10/

/95 YES NO 10/

/95 YES NO

ST LUCIE INSPECTION PLAN IP - Inspection Procedure TI - Temporary Instruction Core Inspection Minimum NRC Inspection Program (mandatory all plants)

INSPECTION PROCEDURE IP 84750 IP 86750 IP 38701 IP 38702 IP 38703 TITLE/

PROGRAM AREA Radioactive Waste

Systems, Water Chemistry Confirmatory Measurements and Radiological Environmental Monitoring Solid Radioactive Waste Management and Transportation of Radioactive Materials Procurement Program;
Receipt, Storage, and Handling of Equipment and Haterials Program Commercial Grade Procurement Inspection.

NUMBER OF PLANNED INSPECTORS INSPECTION DATES 10/16-20/95 12/04-15/95 TYPE OF INSPECTION COMMENTS Core Inspection Regional Initiative to address recent concerns in the procurement area.

IP 40500 IP 92720 Safety Assessment Corrective Action Program 12/95 or 01/96 I-week Regional Initiative Inspection to review the adequacy and status of the ongoing Safety Assessment and Corrective Action Program at St Lucie.

INSPECTION IP 61726 IP 62703 IP 82701 IP 82301 IP 82302 IP 83750 IP 84750 IP 86750 TI 2515/109 TITLE/

PROGRAH AREA Surveillance Observation Haintenance Observation Operational Status of the Emergency Preparedness Program Evaluation of Exercises for Power Reactors Review of Exercise Objecti.ves and Scenarios for Power Reactors Occupational Radiation Exposure Radioactive Waste

Systems, Water Chemistry Confirmatory Heasurements and Radiological Environmental Honitoring Solid Radioactive Waste Hanagement and Transportation of Radioactive Haterials Inspection Requirements for Generic Letter 89-10, Safety-Related Hotor-Operated Valve Testing and Surveillance Licensing Examination Pre aration Initial Licensing Examination NUHBER OF PLANNED INSPECTORS INSPECTION DATES ll/95 l-week, 01/96 l-week, 03/96 1-week 02/05-09/96 02/26-03/01/96 1 or 2

TBD 01-03/96 03/11-15/96 03/25-29/96 TYPE OF INSPECTION COMHENTS Core Inspection Core Inspection -

EP Exercise Core Inspection Area of Emphasis Inspection to close out Generic Letter 89-10 Operator Exam Preparation Scheduled Operator Exam