ML17228B267
| ML17228B267 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/08/1995 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17228B268 | List: |
| References | |
| EA-95-180, NUDOCS 9509180259 | |
| Download: ML17228B267 (6) | |
See also: IR 05000335/1995016
Text
PRIORIT'Y Z
REGDLRTORY'19Kt%NIHtTVX%kkSRTYON SYSTEM
(RYDS)
ACCESSION NBR:9509180259
DOC.DATE: 95/09/08
NOTARIZED:
NO
I
FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
UTH. iVAM"
AUTHOR AFFILIATION
ERSCHOFF,E.W.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
a Light Co.
DOCKET
'5000335
05000389
SUBJECT:
Forwards insp repts
50-335/95-16
& 50-389/95-16
on 950803-
30.No violations noted.
DISTRXBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
+IS
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/D. SP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN2
FILE
01
COPXES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
XD CODE/NAME
NORRIS,J
AEOD/DEIB
GB/TTC
F'I'LE CENTER
DORS/OERB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RNAL: LITCO BRYCE,J
H
NRC
1
1
1
1
NOAC
1
1
ROTE TO ALI "RIDS" RECIPIEi4'TS:
PLEASE HELP US TO REDUCE CTASTE! COYTACTTHE DOCL'MEi'I CONTROL
DESk. ROOM Pl -37 (EXT. 504-20S3
) TO ELIMIYATE5'Ol'R NAME PROD!
DIS'I'RIOL"I'IOiI.ISTS I'OR DOCU!iIENI'S YOL'OX"IiLED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
0
September
8,
1995
EA 95-180
Florida Power
and Light Company
ATTN:
Nr. J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-335/95-16
and 50-389/95-16
Dear Hr. Goldberg:
This refers to the inspection
conducted
August 9-30,
1995, at St.
Lucie
Nuclear Plant.
The purpose of the inspection
was to determine
whether
activities authorized
by the license
were conducted
safely
and in accordance
with NRC requirements.
At the conclusion of the inspection,
the findings were
discussed
with those
members of your staff identified in the enclosed report.
Areas
examined during the inspection
are identified in the report.
The
inspector
reviewed the failures of two Power Operated Relief Valves.
The
inspection
included
a review of the failure investigation
and programs
or
processes
which resulted
in the incorrect installation of key components
in
the valves during their overhaul
in the
1994 Uni't
1 refueling outage.
Within
these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
apparent violations. were identified
'and are being considered for escalated
enforcement
action in accordance
with
the "General
Statement
of Policy and Procedure for NRC Enforcement Actions"
June
30,
1995/NUREG 1600).
The apparent
violations identified are related to
a violation of Technical Specifications
resulting from Power Operated Relief Valve inoperability and to failures to
perform adequate
post-maintenance
and surveillance testing.
Accordingly,
no
Notice of Violation is presently
being issued for these
inspection findings.
In addition, please
be advised that the number
and characterization
of
apparent violations described
in the enclosed
inspection report
may change
as
a result of further
NRC review.
A pr edecisional
enforcement
conference
to discuss
these
apparent violations
has
been
scheduled for September
25,
1995, at 10:00 a.m.
The decision to hold
a predecisional
enforcement
conference
does not mean that the
NRC has
'etermined that violations have occurred or that enforcement
action will be
taken.
This conference
is being held to obtain information to enable
the
NRC
to make
an enforcement
decision,
such
as
a common understanding
of the facts,
root causes,
missed opportunities to identify the apparent violations sooner,
corrective actions,
significance of the issues
and the
need for lasting
and
effective corrective action.
In particular,
we expect you to address
the
safety significance of the inoperable
Power Operated Relief Valves,
9509i80259
950908
ADOCK 05000335
G
OFFICIAL COPY
FPLL
2
particularly with respect to
Low Temperature
Over Pressure
protection.
In
addition, this is an opportunity for you to point out any errors in our
inspection report
and for you to provide any information concerning your
perspectives
on 1) the severity of the apparent violations,
2) the application
of the factors that the
NRC considers
when it determines
the amount of a civil
penalty that may be assessed
in accordance
with Section VI.B.2 of the
and 3) any other application of the Enforcement Policy to
this case,
including the exercise of discretion in accordance
with Section
VII.
You will be advised
by separate
correspondence
of the results of our
deliberations
on this matter.
No response
regarding the apparent violation is
required at this time.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosure will be placed in the
NRC Public Document
Room.
Sincerely,
Or'ig signed
by Ellis W. Herschoff
Ellis W. Herschoff, Director
Division of Reactor Projects
Docket Nos. 50-335,
50-389
License
Nos.
EA 95-180
Enclosures:
1.
Inspection
Report
2.
Enforcement Policy:
Section
V, "Predecisional
Enforcement
Conferences"
cc w/encls:
D. A. Sager,
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
H.
N. Paduano,
Hanager
Licensing
and Special
Programs
Florida Power
and Light Company
P.
O.
Box 14000
Juno
Beach,
FL
33408-0420
J. Scarola,
Plant General
Hanager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
cc w/encls:
Continued
see
page
3
FP5L
cc w/encls:
Continued
Robert
E.
Dawson
Plant Licensing Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0218
J.
R.
Newman,
Esq.
Morgan,
Lewis
E Bockius
1800
H Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami,
FL
33131-2398'ill
Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317
Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
'allahassee,
FL
32399-'100
Thomas
R. L. Kindred
County Administrator
St.
Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles. B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite 3300
Rockville,
HD
20852
F PKL
Distribution w encls:
J.
Lieberman,
J.
Gray,
J.
Goldberg,
S.
Lewis,
P.
Longo,
J.
Beal,
G. Tracy,
OEDO
J. Norris,
G. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U.S. Nuclear Regulatory
Comm.
7585 South Highway AIA
Jensen
Beach,
FL
34957-2010
OFFICE
SIGNATURE
NAME
Rll
ELea
Rll
OOM
RPrevatte
Rll
MMiller
Rll
8g
Rll
RII
CEva
DATE
09 /
/95
09/ 7/95
09/ 7 /95