Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228B580 + (18:28:27, 8 January 2025)
- ML17228B579 + (18:28:30, 8 January 2025)
- L-96-187, NPDES Noncompliance Notification:On 960603,effluent Ph of Unit 1 Sewage Treatment Plant Observed to Be 4.03 Std Units. Util Believes Increased Numbers of Personnel at Site During Refueling Outage Resulted in Extra Loading + (18:28:31, 8 January 2025)
- ML17228B577 + (18:28:31, 8 January 2025)
- L-96-192, Requests Approval,Prior to Implementation of Change to Plant Rep.Attachment to Ltr Compares Current Threshold for Unusual Event Declaration for RCS Leakage to Proposed & Includes Util Justification for Proposed Change + (18:28:33, 8 January 2025)
- 05000389/LER-1996-003-02, :on 960625,SITs Discharge Valves Procedurally Isolated in Mode 4 Due to Personnel Error.Issued Night Order to Licensed Operators + (18:28:35, 8 January 2025)
- L-96-186, Responds to Re Request for Addl Info Re Spent Fuel Survey Commitment Closure.Completed All Three Open Actions.W/O Encl + (18:28:36, 8 January 2025)
- L-96-189, Submits Cumulative Total of Steam Generator Tubes Plugged During Spring 1996 Outage & Previous Outages + (18:28:37, 8 January 2025)
- L-96-182, Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2 + (18:28:39, 8 January 2025)
- IR 05000335/1996006 + (18:28:41, 8 January 2025)
- ML17228B568 + (18:28:43, 8 January 2025)
- ML17228B567 + (18:28:45, 8 January 2025)
- L-96-184, Revised Tech Specs Re Core Alteration Definition + (18:28:47, 8 January 2025)
- ML17228B565 + (18:28:47, 8 January 2025)
- ML17228B562 + (18:28:49, 8 January 2025)
- ML17228B561 + (18:28:51, 8 January 2025)
- ML17228B560 + (18:28:52, 8 January 2025)
- L-96-170, Provides Results of SG in-situ Pressure Testing + (18:28:53, 8 January 2025)
- 05000335/LER-1996-008-01, :on 960608,inadvertent Actuation of Safety Injection Actuation Signal & Containment Isolation Actuation Signal Occurred.Caused by Loss of Power Supply.Reviewed Power Supply Design & Conducted Visual Insp + (18:28:57, 8 January 2025)
- ML17228B555 + (18:28:59, 8 January 2025)
- 05000389/LER-1996-002-02, :on 960606,reactor Manually Tripped.Caused by Positioner Feedback Arm Failure on Main Generator Hydrogen Cooler Tcv.Mods Made to Hydrogen Cooler TCV to Eliminate Feedback Assembly & Reduce Vibration + (18:29:02, 8 January 2025)
- L-96-167, Responds to Violation Noted in Insp Repts 50-335/96-06 & 50-389/96-06.C/A:responsible Nuclear Watch Engineer Counseled & Disciplined & Shift Complement of Licensed & non-licensed Operators (Including Fire Team) Reviewed + (18:29:03, 8 January 2025)
- 05000335/LER-1996-007-01, :on 960607,1B EDG Inadvertently Started Due to Procedural Inadequacy.Reset B Channel Cias & Reenergized 1B3 4,160 Bus from Startup Transformer.Changes Made to MPs 1-0970027 & 1-0970028 + (18:29:08, 8 January 2025)
- ML17228B551 + (18:29:10, 8 January 2025)
- ML17228B550 + (18:29:11, 8 January 2025)
- L-96-173, Forwards St Lucie Unit 2 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 940423-960105. Rept Correlates W/Info Included in Rev 10 of UFSAR Submitted Under Separate Cover + (18:29:15, 8 January 2025)
- ML17228B546 + (18:29:17, 8 January 2025)
- ML17228B544 + (18:29:21, 8 January 2025)
- ML17228B543 + (18:29:22, 8 January 2025)
- 05000335/LER-1996-006-01, :on 960601,loss of Containment Audible Count Rate Indication Occurred.Caused by Procedural Inadequacy. Revised Electrical Bus Removal Procedure & Revised Plant Breaker List & Circuitry Drawing + (18:29:24, 8 January 2025)
- L-96-165, Forwards Key Performance Monthly Indicators Issued in June 1996 During Mgt Review Meeting + (18:29:26, 8 January 2025)
- ML17228B540 + (18:29:26, 8 January 2025)
- ML17228B538 + (18:29:29, 8 January 2025)
- ML17228B537 + (18:29:30, 8 January 2025)
- L-96-166, Forwards Response to Request for Addl Info Re Review of SG Tube Insp & Repair Criteria for Unit 1 + (18:29:31, 8 January 2025)
- L-96-155, Forwards Comments on Preliminary Accident Sequence Precursor Analysis + (18:29:33, 8 January 2025)
- ML17228B531 + (18:29:35, 8 January 2025)
- ML17228B530 + (18:29:37, 8 January 2025)
- ML17228B529 + (18:29:39, 8 January 2025)
- L-96-145, Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2 + (18:29:41, 8 January 2025)
- ML17228B527 + (18:29:41, 8 January 2025)
- 05000335/LER-1996-005-01, :on 960514,wide Range Nuclear Instrumentation Channel Rendered Inoperable When Required to Be in Svc for Fuel Movement.Caused by Personnel Error.Applicable Personnel Counseled & Surveillance Procedure Revised + (18:29:43, 8 January 2025)
- L-96-140, Requests Change to Official Svc Lists for Units 1 & 2, Effective Imediately + (18:29:44, 8 January 2025)
- ML17228B521 + (18:29:49, 8 January 2025)
- IR 05000335/1996001 + (18:29:50, 8 January 2025)
- PNO-II-96-043, on 960606,CR Operators Manually Tripped Unit Based on High Main Generator Gas Temp.High Temp Condition Resulted from Closure of Temp Control Valve.Valve Closure Resulted from Failure of Feedback Arm of Valve Positioner + (18:29:53, 8 January 2025)
- IR 05000250/1996005 + (18:29:55, 8 January 2025)
- IR 05000335/1996005 + (18:29:57, 8 January 2025)
- ML17228B514 + (18:30:00, 8 January 2025)
- ML17228B513 + (18:30:01, 8 January 2025)
- ML17228B511 + (18:30:03, 8 January 2025)