Thomas F. Plunke
- President, Nuclear Di~sion Florida Ptawer and Light Company Post"t)ffice Box 14000 Juno
- Beach, Florida 33408-0420 duly 16, 1996
SUBJECT:
REQUEST FOR INFORMATION CONCERNING STEAM GENERATOR TUBE INTEGRITY ANALYSIS ST.
LUCIE PLANT, UNIT 1
Dear Mr. Plunkett:
As a result of the NRC staff's review of steam generator inspection and repair criteria for St. Lucie Unit 1, you provided additional information concerning these criteria in a letter dated June 25, 1996.
Based on a review of the material provided, the NRC staff has several comments and questions which are specified in the enclosure to this letter.
Your response to these comments and questions should be included, in the probabilistic tube integrity
- analysis, scheduled to be completed in, September 1996.
This information, in part, is necessary for the'staff to adequately perform an independent evaluation of this analysis.
f
'Sincerely, 1
, Original signed by Leonard A. Wiens, Senior Project Manager Project Directorate II-3 Division of'Reactor Projects-I/II Office o'f Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
Staff Review'Comments cc w/enclosure:
See next page DISTRIBUTION
- -Docket File.
PUBLIC St. Lucie Rdg.
S.
Varga J. Zwolinski OGC ACRS J.
Johnson DOCUMENT NAME:
G:iSTLUCIEiSLLTRSG.RAI To receive a copy of this document, indicate ln the botu C
a Copy without attachment/enclosure "E
a Copy with attachment/enclosure "N" > No copy OFFICE PD I I -3/LA
~ PDII-3/Pif i
PDI I-3/D NAME BClayton LWiens FHebdon DATE 07/
/96 07/
6 07/ ( /96 OFFICIAL RECORD COPY 9607i70i69 9607i6 PDR ADQCK 05000335 P
PDR II."Ki KK CEPS~,E IIlEPV
I f
\\
A' K
I 1
I
'4
'I lo J[
Mr. T. F. Plunkett Florida Power and l.ight Company St.
Lucie Plant CC:
Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St.
Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy A1A Jensen
- Beach, Florida 34957 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 J.
R.
Newman
- Morgan, Lewis 8 Bockius 1800 M Street, N.W.
Washington, DC 20036 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center
- Hiami, Fl or ida 33131-2398 Hr. Thomas R.L. Kindred County Administrator St.
Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 I
Mr. Charles
- Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Hr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 H.
N. Paduano, Manager Licensing L Special Programs Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 J.
A. Stall, Site Vice President St.
Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, Florida 34954-0128 J. Scarola Plant General Hanager St.
Lucie Nuclear Plant P.O.
Box 128 Ft. Pierce, Florida 34954-0128 Hr. Kerry Landis U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323-0199 E. J.
Weinkam Licensing Manager St.
Lucie Nuclear Plant P,O.
Box 128 Fort Pierce, Florida 34954-0128 Mr. Thomas 3. Saporito National Litigation Consultants 6230 W. Indiantown Road //7-355
- Jupiter, Florida 33458
S S
STAFF COMMENTS AND QUESTIONS RELATING TO TUBE INTEGRITY ANALYSIS Clarify how free span indications which are not crack-like and which can not be traced back to the preservice baseline inspection were dispositioned.
Discuss the extent to which the data used in the sizing qualification program have similar morphologies and eddy current responses (e.g.,
extent of intergranular attack,
- cracking, voltage responses, noise levels, etc.).
Discuss the basis for including data from different frequencies in the qualification program (400 kHz and 560 kHz) given that the ability to reliably size defects will, in part, depend on the frequency.
In the June 25,
- 1996, response to NRC Request 3, it was indicated that the burst pressure correlation that will be used relies on average crack depth.
The qualification data for the sizing program relies on maximum crack depth.
Discuss how the uncertainties associated with converting from maximum to average crack depth will be addressed (e.g.,
using a
curve similar to that in Figure 3 of Attachment A to the June 25, 1996 letter).
Provide the supporting metallogr aphic and eddy current data to support this approach.
Discuss how the uncertainties in the predicted burst pressure will be accounted for in the probabilistic methodology (i.e., the predicted burst pressure does not exactly match the observed burst pressure as is illustrated in Figure 1 of Attachment A).
In Figures 4,
5, and 6 of Attachment A to your June 25, 1996 letter, information regarding the distribution of material properties expected in the St.
Lucie Unit 1 steam generator tubes is provided.
Discuss if this data is from steam generators tubes that have been in service.
If not, provide the distribution of material properties based on destructive examination of pulled tubes from similarly fabricated Combustion Engineering steam generators.
Provide the mean and standard deviation of this data along with the 95/95 confidence value (i.e., the lower tolerance limit).
Discuss how the growth rate distribution was developed.
Discuss how the average growth rate was determined.
Clarify whether a lower 95X prediction interval curve for the burst pressure versus crack size correlation was used in the deterministic run-time evaluation.
Use of the lower 95X prediction interval curve is consistent with the approach in Generic Letter 95-05.
Please provide for comparative purposes a deterministic run-time evaluation assuming a
lower 95X prediction interval curve for the burst pressure correlation adjusted for lower bound (95/95) material properties based on the destructive examination of inservice steam generator tubes.
This analysis should also assume a
95X cumulative probability value for non-destructive examination uncertainty.
r
~a, lag yy 4,
\\
t W
2 In the June 25,
- 1996, response to NRC request 4,
EPRI report TR-104788 was cited.
EPRI report TR-104788 contains guidelines for primary-to-secondary leakage monitoring programs.
In this report, deviations from the guidelines are considered acceptable following plant-specific evaluations.
Please clarify any significant deviations taken from these guidelines.
'In addition, specifically address the leakage limits/action levels to be implemented at St. Lucie Unit l.
In the June 25,
- 1996, response to NRC Request 5, it was indicated that undetected flaws will be projected to give the end-of-cycle (EOC) distribution of through-wall cracks.
Discuss whether the detected flaws will also be included in this projection.
Discuss the need to include in the leakage analysis indications which are near through-wall and will pop-through the wall under postulated accident conditions.
Discuss how nondestructive examination (NDE) uncertainty will be accounted for in the projection of the EOC distribution.
The staff has accepted a value for the probability of detection which is independent of flaw depth of 0.6.
Clarify the value of the probability of detection that will be used in your analyses for predicting the EOC distribution of indications.
If different than the 0.6 value discussed
- above, provide a sensitivity study using this value.
Clarify whether the analyses to be performed to determine the EOC distribution will start from a beginning of cycle distribution which has been adjusted for the probability of detection and 'the number of indications repaired similar to the methodology described in Generic Letter. 95-05.,
Discuss and provide the qualification data for the leakage model that will be implemented.
Discuss how the results from the in-situ pressure tests will be factored into the leakage model.
Provide tabularized and graphical data for the distribution of indications detected (length and depth) for each steam generator,
'the distribution of indications repaired for each'team generator, the growth rate of indications (length and depth) for each steam generator, the material properties distribution, the NDE uncertainty
- models, and the burst pressure correlation.
For the distribution of indications detected and repaired, the growth rate distribution, and the material properties distribution, provide the number of indications with depths/lengths/material properties within a given interval (e.g.,
10 indications with depths between 35X and 40K through-wall).
For the remaining distributions, provide the data in a format suitable for the staff to independently verify the results of the tube integrity analysis.
In the June 25,
- 1996, response to NRC Request 7, it is stated that the "burst pressure will be treated deterministically."
Clarify what is meant by this statement.