Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A415 + (18:19:50, 8 January 2025)
- ML17229A413 + (18:19:51, 8 January 2025)
- IR 05000335/1997099 + (18:19:53, 8 January 2025)
- IR 05000335/1995009 + (18:19:55, 8 January 2025)
- ML17229A410 + (18:19:57, 8 January 2025)
- ML17229A408 + (18:19:58, 8 January 2025)
- ML17229A407 + (18:20:00, 8 January 2025)
- ML17229A406 + (18:20:01, 8 January 2025)
- ML17229A404 + (18:20:03, 8 January 2025)
- ML17229A403 + (18:20:04, 8 January 2025)
- L-97-178, Monthly Operating Repts for June 1997 for St Lucie + (18:20:05, 8 January 2025)
- ML17229A401 + (18:20:05, 8 January 2025)
- L-97-172, NPDES Noncompliance Notification:On 970614 & 30,discovered One Dead Sea Turtle on Each Date.Caused by five-inch Barrier Net Loaded W/Algae.Removed Algae from Net & Hand Drudged Silt to Allow Net to Return to Original Position + (18:20:07, 8 January 2025)
- 05000389/LER-1997-004-02, :on 970611,discovered Incorrect Original Cable Tray Fire Stop Assembly Installation Was Outside App R Design Basis.Caused by Personnel Error.Hourly Fire Watch Patrols Will Be Posted + (18:20:12, 8 January 2025)
- L-97-180, Informs NRC of Intent of Util to Conduct Graded Review of Plant FSAR + (18:20:13, 8 January 2025)
- L-97-171, Forwards Response to 970606 RAI Re Application for Exemption from Requirements of 10CFR70.24, Criticality Accident Requirements, for Areas Designated for New Fuel Handling & Storage at St Lucie Units 1 & 2 + (18:20:15, 8 January 2025)
- TAC:M98979 + (18:20:17, 8 January 2025)
- ML17229A394 + (18:20:18, 8 January 2025)
- ML17229A393 + (18:20:19, 8 January 2025)
- ML17229A392 + (18:20:20, 8 January 2025)
- L-97-165, Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-335/97-04 & 50-389/97-04.Corrective Actions:Edg DC Oil Soak Back Pump Was Secured & Fuses Removed + (18:20:21, 8 January 2025)
- ML17229A390 + (18:20:23, 8 January 2025)
- L-97-166, Requests Exemption from Packaging Requirements of 49CFR173.427(B)(1) & Surface Contaminated Object Limits of 49CFR173.403 for Shipment of Two SGs from St Lucie Unit 1. W/Plan & Calculation + (18:20:27, 8 January 2025)
- 05000389/LER-1997-003-02, :on 970521,determined Required Post Maint Open Stroke Test for Valve V3245,2B2 SIT Discharge Check Valve, Had Not Been Performed.Caused by Personnel Error.Procedure Revised + (18:20:29, 8 January 2025)
- L-97-150, Responds to Transmitting SALP Rept 50-335/97-99 for St Lucie Units 1 & 2 for Period 960107-970329 + (18:20:30, 8 January 2025)
- ML17229A385 + (18:20:32, 8 January 2025)
- 05000389/LER-1997-002-03, :on 970518,containment Sump Debris Screen Was Not IAW Design Due to Gaps in Screen Encl.Performed SER to Document Containment Sump Design Requirements + (18:20:33, 8 January 2025)
- ML17229A382 + (18:20:35, 8 January 2025)
- ML17229A380 + (18:20:36, 8 January 2025)
- L-97-146, Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2 + (18:20:37, 8 January 2025)
- ML17229A378 + (18:20:39, 8 January 2025)
- ML17229A377 + (18:20:40, 8 January 2025)
- ML17229A376 + (18:20:41, 8 January 2025)
- 05000335/LER-1997-006, :on 970501,operation Was Prohibited by TS Due to Inadequately Tested Degraded Voltage Sys.Revised Unit 1 ESFAS Surveillance Test Procedure + (18:20:42, 8 January 2025)
- ML17229A374 + (18:20:44, 8 January 2025)
- ML17229A373 + (18:20:46, 8 January 2025)
- L-97-141, Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 1 + (18:20:47, 8 January 2025)
- ML17229A371 + (18:20:47, 8 January 2025)
- ML17229A368 + (18:20:49, 8 January 2025)
- ML17229A367 + (18:20:50, 8 January 2025)
- TAC:M98163 + (18:20:51, 8 January 2025)
- TAC:M98787 + (18:20:52, 8 January 2025)
- ML17229A365 + (18:20:52, 8 January 2025)
- ML17229A364 + (18:20:53, 8 January 2025)
- ML17229A363 + (18:20:54, 8 January 2025)
- L-97-140, Communicates Util Plans for Eddy Current Testing of Replacement SGs for Unit 1.Concludes That SRs of Unit 1 TS 3.4.5 Not Applicable to Preservice Insp of Replacement SGs + (18:20:55, 8 January 2025)
- 05000335/LER-1997-007, :on 970502,reactor Coolant Pump Oil Collection Sys Was Outside App R Design Bases.Identified Leak Sites Were Repaired & Mods to RCP Oil Collection Sys to Capture Any Future Leakage from Areas + (18:20:57, 8 January 2025)
- ML17229A360 + (18:20:58, 8 January 2025)
- L-97-134, Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases + (18:20:59, 8 January 2025)
- TAC:M92014 + (18:21:01, 8 January 2025)
- ML17229A357 + (18:21:02, 8 January 2025)