Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275B371 + (13:24:01, 8 January 2025)
- ML17275B363 + (13:25:13, 8 January 2025)
- ML17275B358 + (13:25:14, 8 January 2025)
- ML17275B356 + (13:25:15, 8 January 2025)
- ML17275B355 + (13:25:16, 8 January 2025)
- ML17275B351 + (13:25:17, 8 January 2025)
- ML17275B315 + (13:25:18, 8 January 2025)
- ML17275B286 + (13:25:19, 8 January 2025)
- ML17275B285 + (13:25:20, 8 January 2025)
- ML17275B281 + (13:25:20, 8 January 2025)
- GO2-81-335, Confirms That Facility Loose Parts Detection Sys Has Been Designed & Specified to Meet Requirements of Reg Guide 1.133,Revision 1,May 1981 + (13:25:22, 8 January 2025)
- ML17275B279 + (13:25:25, 8 January 2025)
- ML17275B273 + (13:25:26, 8 January 2025)
- ML17275B269 + (13:25:27, 8 January 2025)
- GO2-81-031, Forwards Hanford Site Evacuation Time Assessment Study, in Response to NRC 810806 Questions 432.017-432.025.Info Will Be Incorporated in Facility Emergency Plan,Primarily Section 12 + (13:25:30, 8 January 2025)
- ML17275B268 + (13:25:30, 8 January 2025)
- IR 05000397/1981015 + (13:26:54, 8 January 2025)
- ML17275B263 + (13:26:56, 8 January 2025)
- GO2-81-313, Advises That Util Reviewed Preservice Insp & Preoperational Testing Requirements Transmitted w/810306 Ltr. Preoperational Testing Requirements Will Be Detailed in Chapter 1A of FSAR + (13:26:57, 8 January 2025)
- ML17275B259 + (13:27:28, 8 January 2025)
- ML17275B258 + (13:27:29, 8 January 2025)
- GO2-81-027, Forwards Revised Response to NRC Re Violations Noted in IE Insp Rept 50-397/81-03.Corrective Actions: Personnel Responsible for Updating Drawings Retrained as of 810611 + (13:27:30, 8 January 2025)
- ML17275B253 + (13:28:02, 8 January 2025)
- ML17275B251 + (13:28:03, 8 January 2025)
- ML17275B252 + (13:28:03, 8 January 2025)
- GO2-81-288, Forwards Response Schedule to Rl Tedesco 810427 Request for Addl Info on Questions 031.135-031.138 Concerning IE Bulletins 79-27 & 80-06 & IE Info Notice 79-22 + (13:28:04, 8 January 2025)
- GO2-81-294, Forwards Response to Siting Analysis Branch Questions 311.1. Info Will Be Incorporated in FSAR Amend within 4 Months. Marked-up Portion of Amend 12 to OL Encl + (13:28:26, 8 January 2025)
- ML17275B248 + (13:28:57, 8 January 2025)
- ML17275B247 + (13:28:58, 8 January 2025)
- GO2-81-292, Forwards Qualification & Staffing Level Charts of Offsite Managers & Technical Staff,Per Agenda Item 5 from R Auluck 810731 Memo.Info Provided in Preparation for 810924 Meeting W/Nrc.Details Will Be Provided in FSAR Chapter 13 Submittal + (13:28:59, 8 January 2025)
- GO2-81-285, Forwards Transmittal Ltr & Certificate of Svc on L Dallas & Nd Lewis for Amend 17 to Fsar.W/O Transmittal Ltr + (13:29:31, 8 January 2025)
- ML17275B242 + (13:30:04, 8 January 2025)
- ML17275B241 + (13:30:05, 8 January 2025)
- ML17275B240 + (13:30:06, 8 January 2025)
- GO2-78-164, Forwards Info Documenting Conformance W/Positions in NUREG- 0313, Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping, in Response to NRC 780306 Request + (13:30:07, 8 January 2025)
- GO2-81-268, Forwards Response to NUREG-0313,Revision 1, Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping. Mods to Reduce Occurrence of Intergranular Stress Corrosion Cracking Have Been Made + (13:30:39, 8 January 2025)
- GO2-81-276, Application to Amend CPPR-93 Extending Const Completion Date to 840201.Class II Amend Fee Encl + (13:30:53, 8 January 2025)
- ML17275B231 + (13:30:55, 8 January 2025)
- GO2-81-269, Forwards Responses to Containment Sys Branch 810316 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend within 4 Months.Remainder of Responses Re Hydrogen Recombiner Will Be Submitted to NRC by 810918 + (13:30:56, 8 January 2025)
- GO2-81-263, Forwards Amend 17 to FSAR + (13:30:57, 8 January 2025)
- ML17275B226 + (13:30:59, 8 January 2025)
- GO2-81-259, Forwards Burns & Roe,Inc Rept, Improved Structural Analysis Methods for Prediction of Containment-Response to Suppression Pool Hydrodynamic Loads. Rept Should Be Withheld (Ref 10CFR2.790).Affidavit Encl + (13:31:00, 8 January 2025)
- ML17275B224 + (13:31:01, 8 January 2025)
- ML17275B223 + (13:31:02, 8 January 2025)
- ML17275B220 + (13:31:03, 8 January 2025)
- ML17275B219 + (13:31:08, 8 January 2025)
- GO2-81-251, Forwards Responses to NRC 810316 Request for Addl Info Re OL Application Review.Responses Will Be Incorporated Into FSAR within 4 Months.Addl Responses Will Be Submitted by 810830 + (13:31:09, 8 January 2025)
- GO2-81-255, Forwards marked-up Responses to NRC 801230 Questions Re Instrumentation & Controls Sys.Responses Will Be Incorporated Into FSAR Amend within 4 Months + (13:31:11, 8 January 2025)
- IR 05000397/1981014 + (13:31:14, 8 January 2025)
- ML17275B210 + (13:31:15, 8 January 2025)
- GO2-81-249, Notifies That Util Has Scheduled Terminal Block Qualification Test at Wyle Labs,In Response to NRC Re Environ Qualification of safety-related Equipment. Tests Will Incorporate Aged & Tested Terminal Block Samples + (13:31:18, 8 January 2025)