ML17275B263
| ML17275B263 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/15/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275B264 | List: |
| References | |
| NUDOCS 8110020377 | |
| Download: ML17275B263 (4) | |
See also: IR 05000397/1981015
Text
zgsazxmcKl
SPP
1.5 881
Docket No.60-397
Mashington Public Power
Supply System
P. 0.
Box 968
Richland, Mashington
99362
Attention:
Mr. R.
G. Matlock
Program Director,
MNP-2
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
g,. ~g~by"
0
"@
ab
This refers to the inspection conducted
by Mr. A. J.
D'Angelo of this
office on July 27-31,
1981 of activities authorized
by NRC Construction
Permit No. CPPR-93,
and to the discussion of our findings held by Mr. M.
C. Bibb
and other members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection report.
Mithin these areas,
the inspection consisted of
selective examinations of procedures
and representative
records. in-
terviews with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations.
a copy
of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information
that you (or your contractors)
believe to be exempt from disclosure
under
10 CFR 9. 5(a)(4). it is necessary
that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
26 days from the date of this letter a written application to this
I
office to withhold such information. If your receipt of this letter has
been delayed
such that less
than seven
(7) days are available for your
5
review, please notify this office promptly so that a new due date
may be
established
Con.slstent w1th sect1on 2.790(b)(l),
any such appllcatlon
] t(
must be accompanied
by an affidavit executed
by the owner of the information
which Identlfles the document or part sought to be wlthheldan,d pI)1c(b<
contains
a full statement of the basis
on which it is claimed that'ttie"
information should
be withheld from public disclosure.
This section
81i0020377 8109i5
ADDCK 00000397
gZ d3S
iIII)1
I
0
OFFICE)
SURNAME)
DATEP
..av.....AY>..
D'ANGELO/mn
9IIA/81
~ ~ ~
Sofa
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
DOD
S
FAULKEN
RRY
9/I>/81
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
9/(f781
~ ~ ~ ~ ~ ~ ~ s
~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~
~p ran
~ ~ ~ ~ ~ ~
gAtll) "
Qe Ngg)Q o ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ 0 ~
~ ~
~ 0 ~
NRC FORM 318 (IO/80) NRCM 0240
OFFICIAL RECORD COPY
0 USGPO: 1980
329.824
1
y
a
I
e
Washington Public Power Supply System -2-
SEP 15 "~@
further requires
the statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
sha'll
be incorporated
as far as possible into a separate
part of the
affidavit. If we do not hear from you in this regard within the specified
periods
noted above,
the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuNs
them with ypu.
Sincerely,
Original signed
by
T. H. Bishop for
B.
H. Faulkenberry,
Chief
Reactor Construction Projects
Branch
Enclosure:
IE Inspection Report
No. 60-397/81-15
cc w/o enclosure:
R.
B. Glasscock
W.
C. Bibb
G.
C,
Sorensen
bcc:
DUB/Document Control
Desk
(RIDS)
Distributed by RV:
RV
Engelken (ltr)
State of WA (Lewis)
Resident
Inspector
(3)
h
4 ~
l
a
0
~
J
t
tp(
E w
v\\