Forwrds IE Insp Rept 50-397/81-15 on 810727-31.No Noncompliance Noted
ML17275B263
Person / Time
Site: Columbia 
Issue date: 09/15/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B264 List:
References
NUDOCS 8110020377
Download: ML17275B263 (4)


See also: IR 05000397/1981015

Text

zgsazxmcKl

SPP

1.5 881

Docket No.60-397

Mashington Public Power

Supply System

P. 0.

Box 968

Richland, Mashington

99362

Attention:

Mr. R.

G. Matlock

Program Director,

MNP-2

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project

No.

2

g,. ~g~by"

0

"@

ab

This refers to the inspection conducted

by Mr. A. J.

D'Angelo of this

office on July 27-31,

1981 of activities authorized

by NRC Construction

Permit No. CPPR-93,

and to the discussion of our findings held by Mr. M.

C. Bibb

and other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection report.

Mithin these areas,

the inspection consisted of

selective examinations of procedures

and representative

records. in-

terviews with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations.

a copy

of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information

that you (or your contractors)

believe to be exempt from disclosure

under

10 CFR 9. 5(a)(4). it is necessary

that you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

26 days from the date of this letter a written application to this

I

office to withhold such information. If your receipt of this letter has

been delayed

such that less

than seven

(7) days are available for your

5

review, please notify this office promptly so that a new due date

may be

established

Con.slstent w1th sect1on 2.790(b)(l),

any such appllcatlon

] t(

must be accompanied

by an affidavit executed

by the owner of the information

which Identlfles the document or part sought to be wlthheldan,d pI)1c(b<

contains

a full statement of the basis

on which it is claimed that'ttie"

information should

be withheld from public disclosure.

This section

81i0020377 8109i5

PDR

ADDCK 00000397

gZ d3S

iIII)1

I

0

PDR

OFFICE)

SURNAME)

DATEP

..av.....AY>..

D'ANGELO/mn

9IIA/81

~ ~ ~

Sofa

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~

DOD

S

FAULKEN

RRY

9/I>/81

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

9/(f781

~ ~ ~ ~ ~ ~ ~ s

~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~

~p ran

~ ~ ~ ~ ~ ~

gAtll) "

Qe Ngg)Q o ~ ~ ~ ~

~ ~

~ ~ ~ ~ ~ 0 ~

~ ~

~ 0 ~

NRC FORM 318 (IO/80) NRCM 0240

OFFICIAL RECORD COPY

0 USGPO: 1980

329.824

1

y

a

I

e

Washington Public Power Supply System -2-

SEP 15 "~@

further requires

the statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld

sha'll

be incorporated

as far as possible into a separate

part of the

affidavit. If we do not hear from you in this regard within the specified

periods

noted above,

the report will be placed in the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuNs

them with ypu.

Sincerely,

Original signed

by

T. H. Bishop for

B.

H. Faulkenberry,

Chief

Reactor Construction Projects

Branch

Enclosure:

IE Inspection Report

No. 60-397/81-15

cc w/o enclosure:

R.

B. Glasscock

W.

C. Bibb

G.

C,

Sorensen

bcc:

DUB/Document Control

Desk

(RIDS)

Distributed by RV:

RV

PDR

Engelken (ltr)

State of WA (Lewis)

Resident

Inspector

(3)

h

4 ~

l

a

0

~

J

t

tp(

E w

v\\