ML17275B210

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-14 During Jul 1981.No Noncompliance Noted
ML17275B210
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/18/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B211 List:
References
NUDOCS 8109030060
Download: ML17275B210 (4)


See also: IR 05000397/1981014

Text

. 0

AUG 18

198$

Docket No.

50-3S7

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr, R.

G. Matlock

Program Director

et'/(pg

0819ef~ p

Cea~~D~g

Gentlemen:

Subject:

NRC INSPECTION

This refers to the routine inspection

conducted

by Mr. A. Toth

of this office during July 1981, of activities authorized

by

NRC Construction Permit No.

CPPR-93,

and to the discussion of

his findings held by Mr. Toth with Mr. C. 0. Wright and other

members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the en-

closed inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and represen-

tative records,

interviews with personnel,

and observations

by

the inspector.

No items of noncompliance with NRC requirements

were identified

within the scope of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and the enclosed inspection report will be

placed in the NRC's Public Document

Room. If this report contains

any information that you believe to be exempt from disclosure

under

10 CFR 915(a)(4), it is necessary

that you (a) notify this

office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written

application to this office to withhold such information. If your

receipt of this letter has

been delayed

such that less than seven

(7) days are available for your review, please notify this office

promptly so that a new due date

may be established.

Consistent

with section

2.7SO(b)

(1), any such application must be accompanied

OFFICEP

SURNAME/

DATEP

~ ~

~

~ ~

~

,. q=~@f4',

/7j/d.

Bi09030060 BiOBiB

PDR

ADOCK 05000397 "

o~

PDR

Sl

~ ~ ~

~

~ ~

~ ~

~ ~

~

~

~ ~ ~

~

~

~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~

NRC FORM 318 Uo/80) NRCM 0240

0 FF IC IAL R ECO R D COPY '

USGPO'98~29.824

~

W

~

H

fi

k

l

<<4,0rl

l

~

<t i

C

a~)

L

~,

~ u ~

a ~

~

~

~

~

by an affidavit executed

by the owner of the information which

identifies the document or part sought to be withheld, and which

contains

a full statement of the basis on'hich it is claimed that

the information should be withheld fxom public disclosure.

This

section further requires the statement

to address

with specificity

the considerations

listed in 10

CPR 2.790(b)(9).

-The information

sought to be withheld shall be incorporated

as far as possible into

a separate

part of the affidavit.

Xf we do not hear from you in

this regard within the specified periods noted above,

the report will

be placed in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will

be glad to discuss

them with you.

Sincerely,

8. T. 00093

Enclosure:

ZE Xnspection Report'

No. 50-397l81-14

B. H. Paulkenberry,

Chief

Reactor Construction Projects

Branch

cc w/o enclosure:

g.

C. Bibb Project Manager

R.

B. Glasscock,,Quality

Assurance Director

Sent to

DMB for DCS processing.

Distributed by RV:

RV PDR

Resident

Inspectors

(3 copies)

State of'JA (Lewis)

RHE (w/o enclosure)

0

f

'I

I

I

F

I

,,!

I

L ~

'h

J

IIL

P

L

'I

I

f

.I

lf

I,

~

P

P

I

t

I

I

r

h

r

P

I

s

8

Lh

II

) \\

I

J

Ih

P

I

~

I

II

I