Text
. 0
AUG 18
198$
Docket No.
50-3S7
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr, R.
G. Matlock
Program Director
et'/(pg
0819ef~ p
Cea~~D~g
Gentlemen:
Subject:
NRC INSPECTION
This refers to the routine inspection
conducted
by Mr. A. Toth
of this office during July 1981, of activities authorized
by
NRC Construction Permit No.
CPPR-93,
and to the discussion of
his findings held by Mr. Toth with Mr. C. 0. Wright and other
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the en-
closed inspection report.
Within these
areas,
the inspection
consisted of selective
examinations of procedures
and represen-
tative records,
interviews with personnel,
and observations
by
the inspector.
No items of noncompliance with NRC requirements
were identified
within the scope of this inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of this letter and the enclosed inspection report will be
placed in the NRC's Public Document
Room. If this report contains
any information that you believe to be exempt from disclosure
under
10 CFR 915(a)(4), it is necessary
that you (a) notify this
office by telephone within ten (10) days from the date of this
letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written
application to this office to withhold such information. If your
receipt of this letter has
been delayed
such that less than seven
(7) days are available for your review, please notify this office
promptly so that a new due date
may be established.
Consistent
with section
2.7SO(b)
(1), any such application must be accompanied
OFFICEP
SURNAME/
DATEP
~ ~
~
~ ~
~
,. q=~@f4',
/7j/d.
Bi09030060 BiOBiB
ADOCK 05000397 "
o~
Sl
~ ~ ~
~
~ ~
~ ~
~ ~
~
~
~ ~ ~
~
~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~
NRC FORM 318 Uo/80) NRCM 0240
USGPO'98~29.824
~
W
~
H
fi
k
l
<<4,0rl
l
~
<t i
C
a~)
L
~,
~ u ~
a ~
~
~
~
~
by an affidavit executed
by the owner of the information which
identifies the document or part sought to be withheld, and which
contains
a full statement of the basis on'hich it is claimed that
the information should be withheld fxom public disclosure.
This
section further requires the statement
to address
with specificity
the considerations
listed in 10
CPR 2.790(b)(9).
-The information
sought to be withheld shall be incorporated
as far as possible into
a separate
part of the affidavit.
Xf we do not hear from you in
this regard within the specified periods noted above,
the report will
be placed in the Public Document
Room.
Should you have
any questions
concerning this inspection,
we will
be glad to discuss
them with you.
Sincerely,
8. T. 00093
Enclosure:
ZE Xnspection Report'
No. 50-397l81-14
B. H. Paulkenberry,
Chief
Reactor Construction Projects
Branch
cc w/o enclosure:
g.
C. Bibb Project Manager
R.
B. Glasscock,,Quality
Assurance Director
Sent to
DMB for DCS processing.
Distributed by RV:
RV PDR
Resident
Inspectors
(3 copies)
State of'JA (Lewis)
RHE (w/o enclosure)
0
f
'I
I
I
F
I
,,!
I
L ~
'h
J
IIL
P
L
'I
I
f
.I
lf
I,
~
P
P
I
t
I
I
r
h
r
P
I
s
8
Lh
II
) \\
I
J
Ih
P
I
~
I
II
I