Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-89-185, Responds to Request for Info on Environ Qualification of Taped Electrical Splices.Scotch Tapes Allowed by Electrical Test Guide Included Scotch 33,23 & 70 + (10:52:45, 8 January 2025)
- IR 05000397/1989026 + (10:52:50, 8 January 2025)
- ML17285A803 + (10:52:52, 8 January 2025)
- ML17285A800 + (10:52:52, 8 January 2025)
- IR 05000397/1989023 + (10:53:21, 8 January 2025)
- ML17285A797 + (10:53:22, 8 January 2025)
- ML17285A795 + (10:53:23, 8 January 2025)
- ML17285A794 + (10:53:25, 8 January 2025)
- 05000397/LER-1989-039, :on 890914,discovered Three Discrepancies W/ Current Configuration of Reactor Bldg Exhaust Air Radiation Monitoring Sys That Do Not Satisfy Design Basis Requirements + (10:53:28, 8 January 2025)
- ML17285A789 + (10:53:29, 8 January 2025)
- ML17285A788 + (10:53:29, 8 January 2025)
- ML17285A787 + (10:53:30, 8 January 2025)
- TAC:60955 + (10:53:31, 8 January 2025)
- ML17285A785 + (10:53:31, 8 January 2025)
- GO2-89-180, Certifies That Initial & Requalification Operator Training Program for Accredited & Based on Sys Approach to Training, Per Generic Ltr 87-07 + (10:53:32, 8 January 2025)
- ML17285A783 + (10:53:36, 8 January 2025)
- ML17285A780 + (10:53:37, 8 January 2025)
- ML17285A782 + (10:53:37, 8 January 2025)
- ML17285A777 + (10:53:38, 8 January 2025)
- 05000397/LER-1989-036, :on 890905,discovered That Present Surveillance Procedures Do Not Provide for Independent Measurement of Two Values.Caused by Less than Adequate Surveillance Procedures on Response Time Testing of APRM Sys + (10:53:43, 8 January 2025)
- GO2-89-178, Forwards Page 2 to Inservice Insp Summary Rept Sent on 890928.During Duplication of Subj Document,Back Side of Form NIS-1 Not Copied + (10:53:43, 8 January 2025)
- GO2-89-176, Discusses Unreviewed Safety Question Re Standby Gas Treatment,Specifically Establishing Secondary Containment Pressure within 120 of Initiation.Calculations Indicate That post-accident Doses Remain Below 10CFR100 Limits + (10:53:45, 8 January 2025)
- GO2-89-175, Forwards Inservice Insp Summary Rept for Refueling Outage RF89A, for Spring 1989.Rept Includes NIS-1 Owner Data & NIS-2 Owner Repts on Repair or Replacement Completed Since Last Rept + (10:53:46, 8 January 2025)
- ML17285A757 + (10:53:46, 8 January 2025)
- ML17285A754 + (10:53:48, 8 January 2025)
- 05000397/LER-1989-037, :on 890830,differential Pressure Indicating Switch RHR-DPIS-12B Discovered Isolated & Equalized.Cause Not Determined.Instrumentation & Control Work Practices Manual Developed & Training Provided + (10:53:49, 8 January 2025)
- GO2-89-173, Provides Results of Testing of Sensitivity of Gamma-Metrics Monitoring Sys.Wide Range Neutron Monitoring Sys Capable of Monitoring Full Range of Sensitivity Recommended by Reg Guide 1.97,Rev 2 + (10:53:50, 8 January 2025)
- ML17285A752 + (10:53:50, 8 January 2025)
- PNO-V-89-058, on 890921,reactor Manually Tripped from 35% Power Due to High Conductivity in Condensate.Caused by Condenser Tube Leak,Estimated Between 5 & 10 Gpm.Licensee Estimates 8 Days for Repairs to Extraction Line & Condenser + (10:53:53, 8 January 2025)
- ML17285A746 + (10:53:53, 8 January 2025)
- GO2-89-172, Application for Amend to License NPF-21,revising Tech Spec Sections 3.0 & 4.0 Re Recommendations of Generic Ltr 87-09 + (10:53:54, 8 January 2025)
- IR 05000397/1989020 + (10:53:55, 8 January 2025)
- GO2-89-162, Forwards Proprietary MDE-88-0485, Tech Spec Improvement Analysis for Reactor Protection Sys for Washington Nuclear Project 2. Rept Withheld + (10:53:56, 8 January 2025)
- ML17285A737 + (10:53:58, 8 January 2025)
- ML17285A739 + (10:53:58, 8 January 2025)
- GO2-89-155, Forwards Rev 9 to Washington Nuclear Plant 1 & 2 Emergency Preparedness Plan + (10:53:59, 8 January 2025)
- ML17285A733 + (10:54:00, 8 January 2025)
- 05000397/LER-1989-035, :on 890817,reactor Scram Occurred During Surveillance Testing of Reactor Level Instrument Associated W/Automatic Depressurization Sys.Caused by Personnel Error. Training Improved & Visibility Increased + (10:54:01, 8 January 2025)
- GO2-89-159, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S35OW Swing Check Valves or Similar Design. Results of Review Listed + (10:54:02, 8 January 2025)
- ML17285A726 + (10:54:03, 8 January 2025)
- TAC:72188 + (10:54:04, 8 January 2025)
- GO2-89-158, Forwards Addl Info Re Underground Fire Main Analysis.Based on Results of Analyses,No Thrust Block Necessary for 12-inch Fire Main FP-43-1.ASME Rept, Flexibility Analysis of Buried Pipe, Encl + (10:54:07, 8 January 2025)
- ML17285A721 + (10:54:08, 8 January 2025)
- ML17285A722 + (10:54:08, 8 January 2025)
- GO2-89-156, Forwards Revised Semiannual Effluent Repts for Jan-June 1988 & Jul-Dec 1988 + (10:54:09, 8 January 2025)
- 05000397/LER-1989-031, :on 890806,low Reactor Pressure Vessel Level Reactor Scram Initiated by Reactor Protective Sys in Response to Actual Low Water Level Condition Caused Unplanned Trip of Reactor Feedwater Pump 1B + (10:54:10, 8 January 2025)
- ML17285A716 + (10:54:11, 8 January 2025)
- GO2-89-151, Requests Extension to FSAR Amend 40 Submittal Date Until Sept 1989 + (10:54:12, 8 January 2025)
- 05000397/LER-1989-034, :on 890811,six Class 1E 480 Volt Ac Motor Control Ctrs Declared Inoperable Due to Design Deficiency. Caused by Exclusion of Fault Tripping Coordination. Distribution Sys to Be Evaluated + (10:54:13, 8 January 2025)
- 05000397/LER-1989-032, :on 890810,discovered That non-Class 1E 120 Volt Ac Electrical Power Supply Branch Circuit Violated Electrical Separation Criteria.Caused by Equipment/Design Deficiency/Spec Less than Adequate + (10:54:15, 8 January 2025)
- TAC:74567 + (10:54:16, 8 January 2025)
- GO2-89-152, Requests Temporary Relief from Tech Specs Surveillance Requirement Re Average Power Range Monitor Flow Biased Simulated Thermal Power Upscale Function + (10:54:17, 8 January 2025)