Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17286B169 + (10:34:16, 8 January 2025)
- 05000397/LER-1991-030, :on 911104,small Leak Noted in Welded Connection Between RHR Sys Drain Valve & RHR Loop a Shutdown Cooling Return Valve.Caused by Const Fabrication Defect.Rhr Valve V-161A Isolated from RCS + (10:34:18, 8 January 2025)
- 05000397/LER-1991-031, :on 911104,determined That intermediate-range Monitor Control Rod Block Channel Calibrs Not Performed at TS Required Frequency.Caused by Less than Adequate Procedures.Calibr Procedures Performed + (10:34:19, 8 January 2025)
- TAC:M56181 + (10:34:20, 8 January 2025)
- ML17286B161 + (10:34:21, 8 January 2025)
- GO2-91-215, Application for Amend to License NPF-21,changing TS 3.4.2 Re Safety Relief Valves & Table 3.3.7.5-1 Re Accident Monitoring Instrumentation to Permit Acoustic Monitor to Be Inoperable Until Plant Shuts Down for Next Outage + (10:34:22, 8 January 2025)
- ML17286B159 + (10:34:22, 8 January 2025)
- ML17286B153 + (10:34:23, 8 January 2025)
- GO2-91-212, Application for Amend to License NPF-21,changing Tech Spec Table 3.3.6-1.4.a, Control Rod Block Intermediate-Range Monitor Not Full in Signal to Delete Footnote Which States That Signal Bypassed When Detectors in Range 1 + (10:34:24, 8 January 2025)
- ML17286B150 + (10:34:26, 8 January 2025)
- IR 05000397/1991024 + (10:34:27, 8 January 2025)
- GO2-91-209, Discusses 911029 Meeting Re Update on Status of New Simulator Being Mfg for Util.Contractor Experiencing Technical Difficulties in Developing Necessary Computer Models.Extension of 920630 Deadline Requested + (10:34:28, 8 January 2025)
- GO2-91-205, Monthly Operating Rept for Oct 1991 for WNP-2 + (10:34:30, 8 January 2025)
- ML17286B144 + (10:34:30, 8 January 2025)
- GO2-91-210, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-31.Corrective Actions:Health Physics Dept Initiated Discussion Re Proper Use of Alarming Dosimeters & Procedure Re Erratic Operation of Model 415 Revised + (10:34:32, 8 January 2025)
- GO2-91-208, Forwards Affidavit from GE Declaring from GE to BWR Owners Group Re Plant Specific TS Improvement for ECCS as Proprietary,Per Application for Amend to License NPF-21, Changing TS 3/4.3.3 & Associated TS Tables + (10:34:34, 8 January 2025)
- ML17286B141 + (10:34:34, 8 January 2025)
- ML17286B136 + (10:34:36, 8 January 2025)
- ML17286B135 + (10:34:37, 8 January 2025)
- 05000397/LER-1991-027, :on 910930,question on Jet Operability & Surveillance Applicability in Operational Conditions 1 & 2 Below 25% Rated Thermal Power Raised.Caused by Inadequate Procedure.Ts Amend Request Will Be Submitted + (10:34:38, 8 January 2025)
- GO2-91-198, Advises That Mods Necessary to Implement Listed Issues Re Excess Flow Check Valve Position Display & Annunicator Alarm Intensity Per Dcrdr Completed,Per Generic Ltr 88-20 + (10:34:40, 8 January 2025)
- ML17286B131 + (10:34:40, 8 January 2025)
- ML17286B128 + (10:34:41, 8 January 2025)
- GO2-91-200, Application for Amend to License NPF-21,changing Tech Specs to Eliminate Main Steam Line Radiation Monitor Scram & MSIV Closure Functions Per GE Topical Rept NEDO-31400.Changes Will Reduce Unnecessary Plant Shut Downs + (10:34:42, 8 January 2025)
- 05000397/LER-1991-028, :on on 910930,containment Airlock Door Seal Leakage Test Not Performed within Allowable Surveillance Interval.Caused by Inadequate Personnel Work Practices. Master Startup Checklist Amended + (10:34:44, 8 January 2025)
- IR 05000346/2017010 + (10:34:46, 8 January 2025)
- GO2-91-196, Amends 911014 Response to NRC Re Violations Noted in Insp Rept 50-397/91-24 on 910715-19 & 0812-16.Corrective Actions:Pressure Regulator Repaired & Surveillance Procedure Changed to Require Prestart Checks of All Air Start Header + (10:34:47, 8 January 2025)
- ML17286B122 + (10:34:47, 8 January 2025)
- GO2-91-195, Responds to 10CFR50,App E Re Emergency Response Data Sys. Util Currently Investigating Use of Plant Prime Computer to Serve as Interface W/Nrc Sys.Emergency Response Data Sys Expected to Be Operable by 930213 + (10:34:49, 8 January 2025)
- ML17286B118 + (10:34:51, 8 January 2025)
- ML17286B119 + (10:34:51, 8 January 2025)
- ML17286B116 + (10:34:52, 8 January 2025)
- ML17286B115 + (10:34:54, 8 January 2025)
- ML17286B113 + (10:34:54, 8 January 2025)
- IR 05000397/1991028 + (10:34:57, 8 January 2025)
- ML17286B109 + (10:34:58, 8 January 2025)
- 05000397/LER-1991-026, :on 910918,main Control Room Received Alarms, Indicating RWCU HX Room High Temp & RWCU Outboard Isolation Valve Automatically Closed.Caused by Failed Electric Component.Circuit Input Card Replaced + (10:35:02, 8 January 2025)
- GO2-91-171, Provides Critical Evaluation Re Failures of Crew D During Annual Requalification Exam Administered on 910909. Contributing Factors Included,Insufficient Performance Overlap Amongst Crew Members & Training Evaluation Process + (10:35:03, 8 January 2025)
- GO2-91-187, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-24.Corrective Actions:Training Matrix Developed to Include Specific Training on Various Info Sys & Sys Walkdown Checklist Written to Document Insps + (10:35:06, 8 January 2025)
- GO2-91-178, Submits Status of Corrective Actions Associated W/Ler 91-017-00 Re Automatic Start of Diesel Generators Caused by Offsite Grid Disturbance.Operator Responsible for Mispositioned Switch Subj to Disciplinary Action + (10:35:08, 8 January 2025)
- GO2-91-188, Application for Amend to License NPF-21,revising TS 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Actuation Instrumentation & Surveillance Requirements + (10:35:10, 8 January 2025)
- ML17286B104 + (10:35:10, 8 January 2025)
- 05000397/LER-1991-025, :on 910911,train a of Containment Atmosphere Control Sys Rendered Inoperable for More than 30-day Limit Permitted by Ts.Caused by Loss of Oil from Recombiner Blower.Train a & Recombiner Blower Repaired + (10:35:12, 8 January 2025)
- 05000397/LER-1991-024, :on 910909,unanalyzed Condition Associated W/ Postulated Main Steam Line Failure Outside Containment Discovered by Ge.Caused by Failure to Consider Iodine Source Term.Procedure Re Cold Startup Changed + (10:35:14, 8 January 2025)
- GO2-91-180, Monthly Operating Rept for Sept for WNP-2 + (10:35:15, 8 January 2025)
- GO2-91-191, Responds to Generic Ltr 91-06, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10CFR50.54(F).Provides Justification to Questions Listed W/No as Answer + (10:35:16, 8 January 2025)
- GO2-91-012, Provides Actions Planned for Improving Performance of Reactor Bldg post-accident Grab Sampling Sys (REA-SR-48),per Insp Rept 50-397/90-29.State-of-art in-line post-accident Monitoring Sys to Be Installed in Elevated Release Duct + (10:35:18, 8 January 2025)
- GO2-91-192, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/91-26.Corrective Actions:Containers Labeled as Required & Individuals Involved Were Counseled & Labeling Requirements Discussed + (10:35:19, 8 January 2025)
- ML17286B095 + (10:35:21, 8 January 2025)
- ML17286B093 + (10:35:22, 8 January 2025)
- ML17286B089 + (10:35:23, 8 January 2025)
- ML17286B092 + (10:35:23, 8 January 2025)