ML17286B159
| ML17286B159 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/25/1991 |
| From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| Shared Package | |
| ML17286B158 | List: |
| References | |
| NUDOCS 9112040166 | |
| Download: ML17286B159 (3) | |
Text
~ mNTZOLl.SD COALY ~
REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY/RELIEF VALVES LIMITING CONDITION FOR OPERATION ACTION: (Continued)
C.
valve(s) within 2 minutes or if suppression pool average water tempera-ture is 110 F or greater, place the reactor mode switch in the Shut-down position.
With one or more safety/relief, valve acoustic monitors inoperable, restore the inoperable monitor(s) to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."""
SURVEILLANCE RE UIREMENTS 4.4.2 The acoustic monitor for each safety/relief valve shall be demonstrated OPERABLE by performance of a:
a.
CHANNEL CHECK at least once per 31 days, and a
b.
CHANNEL CALIBRATION at least once per 18 months.""
(ho lANR RQQ wQ ohio 49(3 MQ QR OCZ 0
'R 9 fLA 1:I ti, c CC;cpcck A* i'cc
- cA'c i c,p c/pcpicc~.4 ILAIL-8 t~e 3/4 4-7a
!Amendment No.
80 For. MS"lc'V -RQ WASHINGTON NUCLEAR - UNIT 2
""The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.
5Mt:cpf4
"""The acoustic monitor/may be inoperable until theM4th Refueling Outage scheduled for No Later Than May 15,&990 without applying the shutdown requirement
I(
Ij
TABLE 3. 3.7.5-1 ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT l.
2.
3.
4 Reactor Vessel Pressure Reactor Vessel Water Level Suppression Chamber Mater Level Suppression Chamber Water Temperature 5.
Suppression Chamber Air Temperature REQUIRED NUHBER OF CHANNELS 2/sector HIHIHUN CHANNELS OPERABLE 1/sector APPLICABLE OPERATIOHAL COHDITIOHS 1
2 1
2
- 1. 2 1& 2 1
2 6.
7.
8.
Drywell Pressur e Drywell Air Temperature Drywell Oxygen Concentrati on 1,
2 10 2
9.
Drywel l Hydrogen Concentrati on 10.
Safety/Relief Valve Position Indicator s ll.
Suppression Chamber Pressure 2/valve" 1/valve 1'
1 & 2 1,
2 12.
Condensate Storage Tank Level 2
1 13.
Hain Steam Line Isolation Valve Leakage Control System Pressure 2
1 1
2 Ms-7M - 4b
~4h "NOTE - The acoustic monitog may be inoperable until the~ Refueling Outage scheduled for No Later Than Hay 15, ~e without applying the shutdown requirement of Action Bo.a.
ACTION 80 80
&0 eo A
80 eo raO eo 80
-C
~
80 eo