Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A564 + (10:11:27, 8 January 2025)
- GO2-93-199, Responds to NRC Concerns Re Plant Specific Deviation from Generic BWROG Dwl Spray Initiation Limit Curve (Design Deviation 17),per EOPs + (10:11:28, 8 January 2025)
- TAC:M85185 + (10:11:29, 8 January 2025)
- ML17290A560 + (10:11:30, 8 January 2025)
- ML17290A558 + (10:11:31, 8 January 2025)
- GO2-93-169, Notifies That MOU for Emergency Preparedness Between Util & State of Wa Finalized & Signed.Copy of MOU Encl + (10:11:32, 8 January 2025)
- ML17290A554 + (10:11:33, 8 January 2025)
- GO2-93-198, Amends 930426 Response to Violation Noted in Insp Rept 50-397/92-41 Re Disposal of Cooling Tower Sediments.Util Denies Violation.Clarification of Corrective Actions Stated in Listed + (10:11:35, 8 January 2025)
- ML17290A553 + (10:11:35, 8 January 2025)
- GO2-93-195, Submits Special Notice of Change to Washington Nuclear Plant Units 1 & 2 Emergency Preparedness Plan (Epp).Change Deletes Crisis Mgt Ctr & Administrative Support Staff Listed in Section 10.4.1 of EPP + (10:11:37, 8 January 2025)
- ML17290A550 + (10:11:38, 8 January 2025)
- GO2-93-191, Application for Amend to License NPF-21,requesting Change to Refueling Platform Load Limits by Adding New Values Resulting from Installation of Upgraded Refueling Mast (GE Model NF500) + (10:11:39, 8 January 2025)
- GO2-93-193, Informs That Effective 930625,JH Swailes Assumed Responsibilities of Plant Manager at Facility.Requests That NRC Distribution List for Facility Correspondence Be Revised to Show Jh Swailes as Plant Manager + (10:11:40, 8 January 2025)
- GO2-93-196, Advises of Changes Util Made in Schedule to Improve Corrective Action Program.Description of Commitments & Corresponding Revised Completion Date or Completion Status Listed in Encl + (10:11:41, 8 January 2025)
- GO2-93-397, Responds to NRC Bulletin 93-003.Requests That Scheduled Date for Implementation of Bulletin Be Extended from 930730-0915 + (10:11:43, 8 January 2025)
- IR 05000397/1993022 + (10:11:47, 8 January 2025)
- ML17290A539 + (10:11:48, 8 January 2025)
- GO2-93-189, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-19.C/As:PPM 1.3.18 Will Be Revised to Provide Consistent Directions on How to Log Items in Sufficient Detail for Purposes of Identification + (10:11:49, 8 January 2025)
- ML17290A538 + (10:11:49, 8 January 2025)
- GO2-93-186, Forwards Change to ERDS Data Point Library,Consisting of Ref File Re Rx Bldg high-range Monitor + (10:11:51, 8 January 2025)
- GO2-93-188, Amends 921223 Response to Violations Noted in Insp Rept 50-397/92-35.Corrective Actions:Update to ODCM to Reflect Results of 10CFR50.59 Analysis to Permit Operation of Turbine Bldg Will Be Completed by 930831 + (10:11:52, 8 January 2025)
- 05000397/LER-1993-026, :on 930619,failed to Complete Weekly Battery Surveillance Requirements within Allowed TS Interval Due to Scheduling Oversight.Initiated & Completed PPM 7.4.8.2.1.20 + (10:11:54, 8 January 2025)
- GO2-93-156, Special Rept:On 930503,space Frame & Attached Seismic Triaxial Peak Accelorograph (SEIS-TPA-1) Removed to Allow for Refueling of Reactor Core.Instrument Returned to Svc on 930607 + (10:11:55, 8 January 2025)
- GO2-93-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-01.Corrective Actions:Per Was Written to Document Concerns Raised Re SE-V-12A & SW-V-12B + (10:11:56, 8 January 2025)
- ML17290A526 + (10:11:58, 8 January 2025)
- ML17290A525 + (10:11:59, 8 January 2025)
- IR 05000397/1993027 + (10:12:02, 8 January 2025)
- ML17290A522 + (10:12:03, 8 January 2025)
- 05000397/LER-1993-025, :on 930615,Group 1 Nuclear Steam Supply Shutoff Sys Isolation Occurred During Performance of TS Surveillance Test on Turbine Throttle Valves.Caused by Procedure Deficiency.Procedure Changed + (10:12:04, 8 January 2025)
- 05000397/LER-1993-024, :on 930615,ESG Actuation of Containment Instrument Air Backup Nitrogen Bottle Programmer Occurred. Caused by Personnel Error & Procedure Deficiency.Test Procedures to Be Strengthened + (10:12:05, 8 January 2025)
- GO2-93-180, Application for Amend to License NPF-21,increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing Safety Relief Valve Setpoint Tolerance. Proprietary ...Power Uprate W/Extended Load... Encl + (10:12:07, 8 January 2025)
- ML17290A518 + (10:12:07, 8 January 2025)
- GO2-93-176, Monthly Operating Rept for June 1993 for Wnp,Unit 2.W/ Undated Ltr + (10:12:09, 8 January 2025)
- ML17290A512 + (10:12:11, 8 January 2025)
- ML17290A511 + (10:12:11, 8 January 2025)
- ML17290A509 + (10:12:12, 8 January 2025)
- GO2-93-178, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-13.C/As:licensee Will Conduct Followup Audits No Later than 930901,assessing Plant Personnel Performance Re Surveillance Procedure Documentation & Procedure Adherence + (10:12:13, 8 January 2025)
- IR 05000397/1993007 + (10:12:15, 8 January 2025)
- ML17290A506 + (10:12:16, 8 January 2025)
- ML17290A504 + (10:12:17, 8 January 2025)
- 05000397/LER-1991-010, :on 910422,inability to Isolate Primary Containment Due to Wiring Separation Error Caused by Inadequate Work Instructions.Initiated Hourly Fire Tour for Accessible Areas + (10:12:18, 8 January 2025)
- 05000397/LER-1993-009, :on 930217,existence of Noncondensible Gases in Reference Leg of RPV Instrumentation Due to Design Deficiency.Procedures Developed & Revised & Evaluation Performed + (10:12:19, 8 January 2025)
- 05000397/LER-1993-023, :on 930605,concluded That Flexible Conduit Associated W/Pressure Switches Not Seismically Supported. Caused by Improper Construction Instructions.Walkdown of Quality Class I Racks Performed + (10:12:21, 8 January 2025)
- GO2-93-166, Forwards Revised ISI Program Relief Requests 2-ISI-001 & 2-ISI-010 to Be Implemented During Third Insp Period of First Insp Interval.Ge Coverage Repts for R-8 & R-7 & Coverage Plot for N3 - Main Steam Also Encl + (10:12:22, 8 January 2025)
- 05000397/LER-1992-034-02, Forwards LER 92-034-02.Supplemental Rept Describes Completion of Penetration Seal Rework & Changes to Flood Watch Requirements + (10:12:24, 8 January 2025)
- GO2-93-165, Corrects Info in Util Re Annual Reporting Requirements for Level of Financial Protection.Listed Property & Liability Insurance Coverage in Force at Facility + (10:12:25, 8 January 2025)
- 05000397/LER-1992-034, :on 920713,determined That Nonwater Tight Penetration Seals in ECCS Pump Rooms Could Result in Common Mode Failure from Flooding.Inadequate Penetration Seals in ECCS Pump Rooms Except for Door Seals Reworked + (10:12:27, 8 January 2025)
- GO2-93-164, Revises 930413 Response to GL 92-08 Re Thermo-Lag 330-1 Fire Barriers.Schedule for Actions Necessary to Complete Activity Encl + (10:12:28, 8 January 2025)
- ML17290A487 + (10:12:31, 8 January 2025)
- 05000397/LER-1992-037-02, Forwards LER 92-037-02.Rev Provides Updated Info Re C/As for Manual Reactor Scram Due to Core Instability.Commitment to Obtain Amend to TS to Eliminate Requirements for Calculating T Deleted.Confusion Eliminated Through Trai + (10:12:32, 8 January 2025)
- TAC:M84304 + (10:12:33, 8 January 2025)