Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17308A565 + (06:16:57, 8 January 2025)
- ML17308A564 + (06:16:58, 8 January 2025)
- ML17308A551 + (06:16:59, 8 January 2025)
- ML17308A522 + (06:17:00, 8 January 2025)
- ML17308A521 + (06:17:01, 8 January 2025)
- ML17308A519 + (06:17:03, 8 January 2025)
- L-91-053, Combined Semiannual Radioactive Effluent Release Rept for Period Jul-Dec 1990 + (06:17:04, 8 January 2025)
- ML17308A515 + (06:17:41, 8 January 2025)
- L-90-421, Forwards Summary Sheets of 1990 Operator License Requalification Exam Results.Exam Conducted During Wks of 901029 & 1105.Encl Withheld (Ref 10CFR2.790(a)(6)) + (06:17:44, 8 January 2025)
- ML17308A512 + (06:17:44, 8 January 2025)
- IR 05000335/1990028 + (06:18:01, 8 January 2025)
- 05000389/LER-1990-005-03, :on 901112,component Cooling Water HX Pinhole Leak Discovered Due to Shell to Tube Sheet Weld Degradation. Sample of West End Weld Removed & Sent to Lab for Failure Analysis + (06:18:05, 8 January 2025)
- ML17308A508 + (06:18:07, 8 January 2025)
- ML17308A507 + (06:18:08, 8 January 2025)
- TAC:68608 + (06:18:09, 8 January 2025)
- ML17308A504 + (06:18:10, 8 January 2025)
- L-90-215, Rept of 10CFR50.59 Plant Changes, Covering 890123-900122 + (06:18:12, 8 January 2025)
- L-90-210, Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions + (06:18:15, 8 January 2025)
- L-90-230, Reactor Containment Bldg Integrated Leakage Rate Test Final Rept + (06:18:19, 8 January 2025)
- TAC:61713 + (06:18:21, 8 January 2025)
- L-90-110, Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question + (06:18:30, 8 January 2025)
- ML17308A489 + (06:18:33, 8 January 2025)
- ML17308A487 + (06:18:34, 8 January 2025)
- ML17308A486 + (06:18:36, 8 January 2025)
- ML17308A485 + (06:18:37, 8 January 2025)
- ML17308A482 + (06:18:39, 8 January 2025)
- L-89-253, Forwards Inservice Insp Rept for Unit 2 + (06:18:40, 8 January 2025)
- L-89-260, Rept of Changes Made Under Provision of 10CFR50.59 for Period Ending 890122 + (06:18:44, 8 January 2025)
- L-89-259, Forwards Rev 8 to Updated FSAR for St Lucie Unit 1 & List of Plant Changes/Mods,Per 10CFR50.59.Rev Includes Activities Completed Between 880123-890122.Brief Description of Changes Submitted Under Separate Cover + (06:18:46, 8 January 2025)
- L-89-230, Reactor Containment Bldg Integrated Leak Rate Test + (06:18:49, 8 January 2025)
- 05000335/LER-1989-001-03, :on 890517,inadvertent Liquid Release from Waste Mgt Sys Occurred.Caused by Personnel Deviation from Procedure OP 1-0510022 W/O Prior Initiation of Temporary Change Due to Out of Svc Valve + (06:18:54, 8 January 2025)
- TAC:59144 + (06:18:55, 8 January 2025)
- L-89-149, Forwards Revised Conceptual Design for Util ATWS Mods,Per NRC 890419 Request.Detailed Engineering of Diverse Scram Sys Underway + (06:18:56, 8 January 2025)
- ML17308A472 + (06:18:58, 8 January 2025)
- L-89-179, Forwards Attachments 4,5,6 & 7 to 890503 Application for Amend to License DPR-67,inadvertently Omitted.Tech Specs Re Steam Generator Tube Repair Also Encl.Proprietary WCAP-12076 & CEN-377-(F)-P Withheld (Ref 10CFR2.790) + (06:18:59, 8 January 2025)
- L-89-137, 1988 Annual Radiological Environ Operating Rept + (06:19:03, 8 January 2025)
- L-89-133, Rept of Changes Made Under Provisions of 10CFR50.59 for Period Ending 881006 + (06:19:06, 8 January 2025)
- IR 05000335/1989007 + (06:19:13, 8 January 2025)
- L-89-113, Forwards Rev 4 to Updated FSAR & Advises That Cover Ltr for Previous Submittal of 880404 Inadvertently Stated That Rev 3 Covered Period from 861007-871005 Rather than Actual Period of 861007-871006.List of Plant Changes Also Encl + (06:19:15, 8 January 2025)
- IR 05000335/1988033 + (06:19:19, 8 January 2025)
- ML17308A459 + (06:19:21, 8 January 2025)
- ML17308A458 + (06:19:23, 8 January 2025)
- ML17308A457 + (06:19:24, 8 January 2025)
- L-88-311, Forwards Response to NRC Bulletin 87-002,Suppl 2 Re Fastener Testing to Determine Conformance W/Applicable Matl Specs, Consisting of Primary Suppliers,Secondary Suppliers & non-safety Suppliers Lists + (06:19:26, 8 January 2025)
- IR 05000335/1988009 + (06:19:31, 8 January 2025)
- ML17308A449 + (06:19:33, 8 January 2025)
- L-88-165, Annual Radiological Environ Operating Rept,St Lucie Plant Units 1 & 2 + (06:19:34, 8 January 2025)
- L-88-158, Forwards Rev 0 to Pump & Valve Inservice Test Program. List of Plan Changes Encl.Revised Plan Includes Three Revised Relief Requests & One New Relief Request Re Safety Injection & Containment Spray + (06:19:41, 8 January 2025)
- ML17308A446 + (06:19:44, 8 January 2025)
- ML17308A436 + (06:19:51, 8 January 2025)