ML17308A515

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1990 for St Lucie Units 1 & 2.W/910114 Ltr
ML17308A515
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/1990
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-17, NUDOCS 9101180292
Download: ML17308A515 (19)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM kl REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9101180292 DOC.DATE: 90/12/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1990 for St Lucie Units 1 &

2.W/910114 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR t ENCL t SIZE: lC TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ LPEB10 1 1 NRR/DOEA/OEAB 1 1 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

P.O. ox 128, Ft. Pierce, FL 34954-0128 JAN, i4 1991 L-91-17 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December 1990 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Very truly yours, Vice President St. Lucie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL $ 326

~9101180292 90i23i

-PDR ADOCK 05000335

>R' - r PDR an FPL Group company

P K

K 1 a

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT St. Lucie 1 TE JAN i4 t99)

COMPLETED BY J. J. Breen TELEPHONE 407 465-3550 MONTH DECEMBER 1990 DAY AVERAGE DAILY. POWER LEVEL (MWe-Net) l2/ 1/90 86'64 12/ 2/90 12/ 3/90 864 "2/ 4/90 691 12/ 5/99 QB P 12/ 6/90 769 i./ 7';98 12/ 8/90 866 866 12/ 9/VO 868 12/10/99 869 "2/il/90 870 12/12/90 868 12/13/90 868 12/14/90 86?

12/'5/90 867 12/16/90 865 1"/17/90 866 12/18/90 865 1"/19/90 865 12/20/90 863 1"/~1/90 861 12/22/90 864 12/23/'?0 864 12/24/90 864 1"/"5/90 862 12/26/90 862 12/27/90 862 12/28/90 861 12/29/S'0 861 12/30/90 863 12/31/90 861

OPERATING DATA REPORT DOCKET NO 50 335 DATE gag 1 C lS91 CONPLETED BY J,J. BREEN OPERATING STATUS TELEPHONE 407/465/3550

i. UNIT NAVE: Sr, LUCXE REPORTXNG PERIOD UNIT 1 DECEHBER 1 99(')

2 o

3. LXCENSED THERMAL POWER <HWT): ~700 NAMEPLATE RATTNG <GROSS NWE): 850 5i DESXGN ELECTRXCAL RATING <NET NWE) o 830
6. NAXXNUM DEPENDABLE CAPACITY (GROSS HWE) l 872 7i HAXIHUN DEPENDABLE CAPACITY (NET HWE): 839 8, XF CHANGES OCCUR IN C*PACTTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT~ GIVE REASONS:

POWER LEVEL TO WHXCH RESTRICTED~ IF *NY (NET HWE) 10'EASONS FOR RESTRICTIONS'F ANY@

MONTHLY -YTD- CUHULATIVE 11 o HOURS XN REPORT PERIOD 3 744 8760 122976oO

12. NUHBER OF HOURS RE*CTOR WAS CRITXCAL 744' 5569o9 92958i5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 OiO 2e5.3 14 i HOURS GENERATOR ON-LINE 744oO 5467.4 92104.4 15< UNXT RESERVE SHUTDOWN HOURS OiO 0.0 39+3 lb. GROSS THERMAL ENERGY GENERATED <HWH) 1951346 14284414 237242054 17 GROSS ELECTRICAL ENERGY GENERATED (HWH) 656140 4765570 78208640
18. NET ELECTRIC*L ENERGY GENERATED (HWH) 623009 4493877 73892742
19. UNIT SERVICE FACTOR 100+0 62+4 74 '
20. UNIT AVAILABILITYFACTOR 100iO 62.4 74.9 2li CAPACXTY FACTOR (USING HDC NET) 99i8 100i9 61 i 1 61 '

74 '

73.4 22m CAPACITY FACTOR (USING DER NET) 23 o UNIT FORCED OUTAGE RATE OiO 16i7

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS $

25, XF SHUT DOWN AT END OF REPORT PERIOD~ ESTIHATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 UNiT NAME ST. LUCIE g1 DATE "A" ~ < >99l COMPLETED By J. J. BREEN REPORT MONTH DECEMBER'990 TELEPHONE 4 07-4 65-3 55 0 Method of Shutting Ucensee Cause &Corrective Down Event Component Action to No. Date Type'uration (Hours) Reason2 Reactor Reports'ystem Code4 Codes Prevent Recurrence 16 901204 0.0 5 N/A HH PUMPXX Problems with the 1A Condensate Pump.

17 901205 0.0 5 N/A HH ALVEX Problems with 1A heater drain pump solenoid valve.

18 901205 0.0 5 N/A URBIN Vibration in g1 and g2 low pressure bearings.

. 19 901205 0.0 4 N/A ALVEX Problems with 1A heater drain pump solenoid valve.

2 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURES@161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other(Exphin)

a/%

&~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie 1 DATE '..JA i4 N>

COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 REPORT MONTH DECEMBER 1990 Unit 1 was at full power until December 4, 1990, when downpower commenced due to 1A condensate pump problems. On December 5, 1990, the pump was back in service and power began to increase. It held at approximately 804 due to a problem with the heater drain was pump solenoid valve; Unit 1 then experienced vibration in the g1 and g2 low pressure bearings. At approximately 774 power, bearing vibration readings became acceptable and power was held for repair of the 1A heater drain pump solenoid valve.

I Unit 1 came up to full power on December 6, 1990, and remained there for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

'I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389 UNIT St. Lucie 2 DATE COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 MONTH DECEMBER 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/ '/90 -31 3'7 12/ 2/90 "P4 12/ 3/'90 12/ 4/90 -"6 12/ 5/98 187 12/ 6/90 229 12/ 7/90 489 12/ 8/90 56""

12/ 9t98 673 1"/10/90 788

'2/11/90 849 1 "/1" ""-8 869 12/13/90 864 12/14/90 862 1 /'b/90 862 12/16/90 862 1"/17/90 862 12/18/90 866 12/19t90 868 12/20/90 867 12/21/90 866 12/22/90 868 12/23/90 868 12/24/90 869 868 12/26/90 840 12/27/90 804 1 /28/90 868 12/29/~0 868 12/30/90 868 12/31/90 868

J

OPERATING DATA REPORT DOCKET NO 50 389 DATE JAN 1,4 COMPLETED BY J.J. BREEN TELEPHONE 407/465/3550 OPERATING STATUS

1. UNTT NAME: ST. LUCIE UNIT 2 2 ~ REPORTING PERIOD: DECEMBER 1990
3. LICENSED THERHAI -'OWER (HWT): ~70()

4, NAHEPLATE RATING (GROSS MWE) l 850

5. DESIGN ELECTRICAL RATING (NET HWE) o 830
6. MAXIMUM DEPENDABLE CAF'ACXTY (GROSS HWE) l 882 7+ MAXXHUH DEPENDABLE CAPACITY (NET MWE)i . 839
8. XF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUHBER 3 THROUGH 7)

SINCE LAST REPORT~ GI E REASONS:

9+ POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET HWE) 10 REASONS FOR RESTRICTIONS'F ANY'ONTHLY

" - YTD- CUMULATIVE i1 o HOURS XN REPORT PERIOD: 744 8760 64873.6 12'UMBER OF HOURS REACTOR WAS CRXTXCAL 704oO 6691.4 54860.3 13m REACTOR RESERVE SHUTDOWN HOURS OoO 0' O.v

14. HOURS GENERATOR ON-LINE 649i8 6489+6 53844 15'NIT RESERVE SHUTDOWN HOURS OoO OoO 0+0 ihi GROSS THERMAL ENERGY GENERATED (HWH) 1575775 16991685 140789081 17'ROSS ELECTRICAL ENERGY GENERATED (HWH) 531140 5645010 4689692e 18'ET ELECTRXCAL ENERGY GENERATED <HWH) 498985 5320989 44334103 19 o UNXT SERVICE FACTOR 87.3 74.1 83 '

20+ UNIT AVAXLABXLXTYFACTOR 87o3 74 i 1 83 '

21 i CAF'ACITY FACTOR ( USING MDC NET ) 79i9 72 ' 83 '

22'APACITY FACTOR <USING DER NET) 80o8 73o2 83 '

23'NIT FORCED OUTAGE RATE 12i7 ii+0 6 '

24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 i IF SHUT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP:

C I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

ST. LUCIE g2 DATE JAH i4 >.

COMPLETED BY J J. BREEN REPORT MONTH DECEMBERI 1990 HONE 407-465-3550 Method of Shutting Ucensee Cause & Corrective No. Date Type Duration (Hours) Reason~

Down Reactor Reports'omponent Event System Code4 Codes Actionto Prevent Recurrence 18 900930 62.7 C N/A RC FUELXX Unit 2 was in a refueling outage until December 3, 1990.

901203 0.0 B N/A RB XXXXXX Power held at 25< for physics testing.

20 901204 0.0 N/A HA TURBIN Downpower due to overspeed trip testing.

20 901204 0.3 A N/A TURBIN Turbine overspeed trip.

21 901204 31.2 A N/A TURBIN Vibration in g6 bearing.

22 901205 0.0 N/A XXXXXX Held at 30% power due to chemistry hold.

3 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restnction 4 - Continued (NUREG4161)

E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other(Exphin)

rf>

II

UNlT SHUTDOWNS AND POWER REDUCTlONS DOCKET NO.

UNITNAME ST. LUCIE g2 DATE 'JAIL 1 4 l991 COMPLETED By ~. Z- BREEN REPORT MONTH DECEMBERi 1990 TELEPHONE 407 465-3550 Method of Shutting Licensee Cause & Corrective Date Type'uration (Hours) Reason2 Down Reactor Event Report if'ystem Code4 Component Codes Action to Prevent Recurrence 23 901206 0.0 F N/A ZZZZZZ Nuclear Delta Temperature calibration.

24 901206 0.0 N/A XXXXXX Power held at 50% for physics testing.

25 901207 0.0 N/A ALVEX Moisture seperator reheater block temperature control valve problems.

26 901208 0' N/A XXXXX Power held at 804 for physics testing.

3 F Forced Reason Method Exhibit G-instructions S Scheduled A - EquipmentFaHure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURE&4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

ll

\

~

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~

UNIT DATE COMPLETED BY TELEPHONE

'S 50-389 St. Lucie J. J. Breen 407 2

465-3550 REPORT MONTH DECEMBER 1990 On December 3, 1990, as Unit 2 started coming out of the fall 1990

.refueling outage, power was held at 25% for physics testing. On December 4, 1990, Unit 2 started to downpower for turbine overspeed trip testing; the turbine then tripped due to the g6 bearing.

Troubleshooting was done on g6 bearing and was completed on December 5, 1990. Power was then increased and held at 30% due to a chemistry hold.

On December 6, 1990, as power started to increase a nuclear delta temperature calibration was done; power was then increased and held at approximately 504 for physics testing. On December 7, 1990, power was held at 49.5% to resolve moisture seperator reheater temperature control valve, problems. Power was then raised to 804 and held for physics testing on December 8, 1990 thru December 9, 1990. On December 9, 1990, power was increased and Unit 2 was at full power from December 10, 1990, until the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.