ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM kl REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9101180292 DOC.DATE: 90/12/31 NOTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION BREEN,J.J.
Florida Power
& Light Co.
SAGER,D.A.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
SUBJECT:
Monthly operating repts for Dec 1990 for St Lucie Units 1
2.W/910114 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED LTR t
ENCL t
SIZE: lC TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ LPEB10 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL 26
P.O.
ox 128, Ft. Pierce, FL 34954-0128 JAN, i 4 1991 L-91-17 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 Gentlemen:
Re:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December 1990 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Very truly yours, Vice President St. Lucie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL
$ 326
~9101180292 90i23i
- -PDR ADOCK 05000335
>R' r
P K
K a
1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT St. Lucie 1
TE JAN i 4 t99)
COMPLETED BY J. J.
Breen TELEPHONE 407 465-3550 DAY MONTH DECEMBER 1990 AVERAGE DAILY. POWER LEVEL (MWe-Net) l2/ 1/90 12/ 2/90 12/ 3/90 "2/ 4/90 12/ 5/99 12/ 6/90 i./ 7';98 12/ 8/90 12/ 9/VO 12/10/99 "2/il/90 12/12/90 12/13/90 12/14/90 12/'5/90 12/16/90 1"/17/90 12/18/90 1"/19/90 12/20/90 1"/~1/90 12/22/90 12/23/'?0 12/24/90 1"/"5/90 12/26/90 12/27/90 12/28/90 12/29/S'0 12/30/90 12/31/90 86'64 864 691 QB P
769 866 866 868 869 870 868 868 86?
867 865 866 865 865 863 861 864 864 864 862 862 862 861 861 863 861
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 335 DATE gag 1
C lS91 CONPLETED BY J,J.
BREEN TELEPHONE 407/465/3550
- i. UNIT NAVE:
Sr, LUCXE UNIT 1
2 o
REPORTXNG PERIOD DECEHBER 1 99(')
3.
LXCENSED THERMAL POWER
<HWT):
~700 NAMEPLATE RATTNG
<GROSS NWE):
850 5i DESXGN ELECTRXCAL RATING
<NET NWE) o 830 6.
NAXXNUM DEPENDABLE CAPACITY (GROSS HWE) l 872 7i HAXIHUN DEPENDABLE CAPACITY (NET HWE):
839 8,
XF CHANGES OCCUR IN C*PACTTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~
GIVE REASONS:
POWER LEVEL TO WHXCH RESTRICTED~ IF *NY (NET HWE) 10'EASONS FOR RESTRICTIONS'F ANY@
MONTHLY
-YTD-CUHULATIVE 1 1 o
HOURS XN REPORT PERIOD 3 12.
NUHBER OF HOURS RE*CTOR WAS CRITXCAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15<
UNXT RESERVE SHUTDOWN HOURS lb.
GROSS THERMAL ENERGY GENERATED
<HWH) 17 GROSS ELECTRICAL ENERGY GENERATED (HWH) 18.
NET ELECTRIC*L ENERGY GENERATED (HWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 2li CAPACXTY FACTOR (USING HDC NET) 22m CAPACITY FACTOR (USING DER NET) 23 o
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744'0.0 744oO OiO 1951346 656140 623009 100+0 100iO 99i8 100i9 OiO 8760 5569o9 OiO 5467.4 0.0 14284414 4765570 4493877 62+4 62.4 61 i 1 61 '
16i7 122976oO 92958i5 2e5.3 92104.4 39+3 237242054 78208640 73892742 74 '
74.9 74 '
73.4 25, XF SHUT DOWN AT END OF REPORT PERIOD~
ESTIHATED DATE OF STARTUP:
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DECEMBER'990 DOCKET NO. 50 UNiT NAMEST.
LUCIE g1 DATE "A" ~ < >99l COMPLETED ByJ. J.
BREEN TELEPHONE 4 07-4 65-3 55 0 No.
Date Type'uration (Hours)
Reason2 Method of Shutting Down Reactor Ucensee Event Reports'ystem Code4 Component Codes Cause &Corrective Actionto Prevent Recurrence 16 901204 17 901205 18 901205
. 19 901205 0.0 0.0 0.0 0.0 5
N/A 5
N/A 5
N/A 4
N/A HH HH PUMPXX ALVEX URBIN ALVEX Problems with the 1A Condensate Pump.
Problems with 1A heater drain pump solenoid valve.
Vibration in g1 and g2 low pressure bearings.
Problems with 1A heater drain pump solenoid valve.
F Forced S Scheduled 2
Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other(Exphin)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData Entry Scheets Licensee Event Report(LER) File (NURES@161)
Exhibit1-Same Source
a/%
& ~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie 1
DATE
'..JA i 4 N>
COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 REPORT MONTH DECEMBER 1990 Unit 1 was at full power until December 4,
- 1990, when downpower commenced due to 1A condensate pump problems.
On December 5, 1990, the pump was back in service and power began to increase. It was held at approximately 804 due to a problem with the heater drain pump solenoid valve; Unit 1 then experienced vibration in the g1 and g2 low pressure bearings.
At approximately 774 power, bearing vibration readings became acceptable and power was held for repair of the 1A heater drain pump solenoid valve.
I Unit 1
came up to full power on December 6,
- 1990, and remained there for the rest of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
'I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389 UNIT St. Lucie 2
DATE COMPLETED BY Z. Z. Breen TELEPHONE 407 465-3550 DAY MONTH DECEMBER 1990 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/ '/90 12/ 2/90 12/ 3/'90 12/ 4/90 12/ 5/98 12/ 6/90 12/ 7/90 12/ 8/90 12/ 9t98 1"/10/90
'2/11/90 1"/1" ""-8 12/13/90 12/14/90 1 /'b/90 12/16/90 1"/17/90 12/18/90 12/19t90 12/20/90 12/21/90 12/22/90 12/23/90 12/24/90 12/26/90 12/27/90 1 /28/90 12/29/~0 12/30/90 12/31/90
-31 3'7 "P4
-"6 187 229 489 56""
673 788 849 869 864 862 862 862 862 866 868 867 866 868 868 869 868 840 804 868 868 868 868
J
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 389 DATE JAN 1,4 COMPLETED BY J.J.
BREEN TELEPHONE 407/465/3550 1.
UNTT NAME:
ST.
LUCIE UNIT 2 2 ~
REPORTING PERIOD:
DECEMBER 1990 3.
LICENSED THERHAI
-'OWER (HWT):
~70()
4, NAHEPLATE RATING (GROSS MWE) l 850 5.
DESIGN ELECTRICAL RATING (NET HWE) o 830 6.
MAXIMUM DEPENDABLE CAF'ACXTY (GROSS HWE) l 882 7+
MAXXHUH DEPENDABLE CAPACITY (NET MWE)i 839 8.
XF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUHBER 3 THROUGH 7)
SINCE LAST REPORT~
GI E REASONS:
9+
POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET HWE) 10 REASONS FOR RESTRICTIONS'F ANY'ONTHLY
" -YTD-CUMULATIVE i 1 o HOURS XN REPORT PERIOD:
12'UMBER OF HOURS REACTOR WAS CRXTXCAL 13m REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON-LINE 15'NIT RESERVE SHUTDOWN HOURS ihi GROSS THERMAL ENERGY GENERATED (HWH) 17'ROSS ELECTRICAL ENERGY GENERATED (HWH) 18'ET ELECTRXCAL ENERGY GENERATED
<HWH) 19 o
UNXT SERVICE FACTOR 20+
UNIT AVAXLABXLXTYFACTOR 21 i CAF'ACITY FACTOR
( USING MDC NET )
22'APACITY FACTOR
<USING DER NET) 23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 704oO OoO 649i8 OoO 1575775 531140 498985 87.3 87o3 79i9 80o8 12i7 8760 6691.4 0 '
6489+6 OoO 16991685 5645010 5320989 74.1 74 i 1 72 '
73o2 ii+0 64873.6 54860.3 O.v 53844 0+0 140789081 4689692e 44334103 83 '
83 '
83 '
83 '
6 '
25 i IF SHUT DOWN AT END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP:
C I
No.
18 20 20 21 22 Date 900930 901203 901204 901204 901204 901205 F Forced S Scheduled Type UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
ST.
LUCIE g2 JAH i 4 DATE COMPLETED BY J
J.
BREEN HONE 407-465-3550 REPORT MONTH DECEMBERI 1990 Method of Shutting Down Reactor Cause &Corrective Actionto Prevent Recurrence Ucensee Event Reports'omponent Codes System Code4 Duration (Hours)
Reason~
Unit 2
was in a refueling outage until December 3,
1990.
62.7 C
N/A RC FUELXX N/A 0.0 B
RB XXXXXX Power held at 25< for physics testing.
0.0 Downpower due to overspeed trip testing.
N/A HA TURBIN N/A Turbine overspeed trip.
0.3 A
TURBIN TURBIN Vibration in g6 bearing.
31.2 A
N/A 0.0 N/A XXXXXX Held at 30%
power due to chemistry hold.
3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUREG4161)
Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restnction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)
H - Other(Exphin)
Exhibit1-Same Source
rf>
II
UNlT SHUTDOWNS AND POWER REDUCTlONS DOCKET NO.
UNITNAME ST.
LUCIE g2 DATE
'JAIL 1 4 l991 REPORT MONTH DECEMBERi 1990 COMPLETED By
~. Z-BREEN TELEPHONE 407 465-3550 Date Type'uration (Hours)
Reason2 Method of Shutting Down Reactor Licensee Event Reportif'ystem Code4 Component Codes Cause &Corrective Actionto Prevent Recurrence 23 901206 0.0 F
N/A ZZZZZZ Nuclear Delta Temperature calibration.
24 901206 25 901207 26 901208 0.0 0.0 0 '
N/A N/A N/A XXXXXX ALVEX XXXXX Power held at 50% for physics testing.
Moisture seperator reheater block temperature control valve problems.
Power held at 804 for physics testing.
F Forced S Scheduled Reason A - EquipmentFaHure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NURE&4161)
Exhibit1-Same Source
\\
ll
~~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO ~ 50-389 UNIT St. Lucie 2
DATE 'S COMPLETED BY J. J.
Breen TELEPHONE 407 465-3550 REPORT MONTH DECEMBER 1990 On December 3, 1990, as Unit 2 started coming out of the fall 1990
.refueling outage, power was held at 25% for physics testing.
On December 4, 1990, Unit 2 started to downpower for turbine overspeed trip testing; the turbine then tripped due to the g6 bearing.
Troubleshooting was done on g6 bearing and was completed on December 5,
1990.
Power was then increased and held at 30% due to a chemistry hold.
On December 6,
- 1990, as power started to increase a nuclear delta temperature calibration was done; power was then increased and held at approximately 504 for physics testing.
On December 7, 1990, power was held at 49.5% to resolve moisture seperator reheater temperature control valve, problems.
Power was then raised to 804 and held for physics testing on December 8,
1990 thru December 9,
1990.
On December 9,
- 1990, power was increased and Unit 2 was at full power from December 10, 1990, until the rest of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.