ML17308A459
| ML17308A459 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/01/1989 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17308A460 | List: |
| References | |
| NUDOCS 8903140058 | |
| Download: ML17308A459 (3) | |
See also: IR 05000335/1988033
Text
ACCEMRATED
Dl STK Bt 'TlON
DE MON NITRATION
SYSTEM
ESSION NBR:
FACIL:50--389
AUTH.N
CRLENJAK,R.V.
RECIP.NAME
CONWAY,W.F.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
8903140058
DOC.DATE: 89/03/01
NOTARIZED: NO
t. Lucie Plant, Unit 1, Florida Power
& Light Co.
Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTHOR AFFILIATION
Region 2, Ofc of the Director
RECIPIENT AFFILIATION
Florida Power
& Light Co.
DOCKET
05000335
05000389
SUBJECT:
Forwards Insp Repts
50-335/88-33
& 50-389/88-33
on
881211-890128.No violations or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
INTERNAL:
RECIPIENT
ID CODE/NAME
PD2-2
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMAN J
EG FIXE
COPIES
LTTR ENCL
1
-
1
2
2
.1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRIS,J
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
COPIES
LTTR ENCL
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
h
EXTERNAL: LPDR
1
1
1
1
'RC
1
1
R
I
'D
S
h
NarE rO ALL iiRIDSii RECIPIENrs:
PLEASE HELP US 1O REDUCE gASTE!
CONrACr 'THE DOCUMEÃZ CONrROL DESK
RXM Pl-37
(EXT. 20079)
XO ELIMINATEKSR NAME PRCH DISTEKKTZIGN
LISTS FOR DOCUMEXZS YOU DON'T NEEDt
D
S
ViAR 0
1
1989
Docket Nos.
50-335,
50-,389
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. W.
F.
Conway
Senior Vice President - Nuclear
P.
O.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-335/88"33
AND 50-389/88-33
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
L. Paulk
on December ll, 1988 - January
28,
1989.
The inspection
included
a
review of activities authorized for your St.
Lucie facility.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within
the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In
accordance
with Section
2.790
of
NRC's
"Rules
of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter
and its enclosure
will be placed
in the
NRC Public Document
Room..
Sincerely
Original Sloned Cy
R.
V. Crlenjak (for)
Bruce A. Wilson, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure
NRC Inspection
Report
cc w/encl:
K. N. Harris, Vice President
St.
Lucie Nuclear Plant
G. J. Boissy, Plant Manager
J.
B. Harper,
QA Superintendent
State of Florida
~p()sf<~
(
OSO()033-'~gCrgSOi
/Op
AOOcl
pQC
Q
meo/
Florida Power
and Light
Company'cc
w/encl:
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
RIIg
WKPoertner
2/~89
4! c.rQqiK