Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17309A128 + (06:16:16, 8 January 2025)
- 05000244/LER-1981-003-03, /03L-0:on 810115,during Normal Reactor Coolant Boration,Absence of Boric Acid Flow from a Boric Acid Pump Observed.A Pump Declared Inoperable.Caused by Valve Not Fully Open After Sampling.Valves Will Be Locked Open + (06:16:17, 8 January 2025)
- ML17309A126 + (06:16:18, 8 January 2025)
- 05000244/LER-1981-002-03, /03L-0:on 810109,safety Injection Pump C Did Not Start W/Bus Breaker 16.Probable Cause Due to Breaker in off-set Position.Personnel to Be Instructed in Proper Breaker Alignment + (06:16:19, 8 January 2025)
- 05000244/LER-1981-001-03, /03L-0:on 810105,leak Noted on Diesel Emergency Generator B Jacket Cooling Water Return Line to Expansion Tank.Caused by Broken Bushing Due to Possible Lack of Support Connection.Bushing Replaced + (06:16:20, 8 January 2025)
- ML17309A122 + (06:16:21, 8 January 2025)
- ML17309A118 + (06:16:22, 8 January 2025)
- 05000244/LER-1980-010-03, /03L-0:on 801125,pinhole Leak Found in Weld on RHR Thermowell.Caused by Poor Quality Weld.Weld Repaired + (06:16:23, 8 January 2025)
- ML17309A112 + (06:16:25, 8 January 2025)
- ML17309A110 + (06:16:26, 8 January 2025)
- ML17309A108 + (06:16:26, 8 January 2025)
- ML17309A105 + (06:16:28, 8 January 2025)
- ML17309A107 + (06:16:28, 8 January 2025)
- 05000244/LER-1980-009-03, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running + (06:16:33, 8 January 2025)
- 05000244/LER-1980-008-03, /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed + (06:16:36, 8 January 2025)
- ML17309A075 + (06:16:37, 8 January 2025)
- ML17309A090 + (06:16:37, 8 January 2025)
- ML17309A074 + (06:16:38, 8 January 2025)
- ML17309A073 + (06:16:40, 8 January 2025)
- ML17309A071 + (06:16:41, 8 January 2025)
- ML17309A041 + (06:16:42, 8 January 2025)
- ML17309A069 + (06:16:42, 8 January 2025)
- ML17309A024 + (06:16:43, 8 January 2025)
- ML17309A010 + (06:16:44, 8 January 2025)
- ML17309A009 + (06:16:46, 8 January 2025)
- ML17309A008 + (06:16:47, 8 January 2025)
- ML17309A002 + (06:16:49, 8 January 2025)
- ML17308A579 + (06:16:50, 8 January 2025)
- ML17308A577 + (06:16:51, 8 January 2025)
- ML17308A576 + (06:16:52, 8 January 2025)
- ML17308A575 + (06:16:53, 8 January 2025)
- ML17308A568 + (06:16:55, 8 January 2025)
- ML17308A569 + (06:16:55, 8 January 2025)
- ML17308A565 + (06:16:57, 8 January 2025)
- ML17308A564 + (06:16:58, 8 January 2025)
- ML17308A551 + (06:16:59, 8 January 2025)
- ML17308A522 + (06:17:00, 8 January 2025)
- ML17308A521 + (06:17:01, 8 January 2025)
- ML17308A519 + (06:17:03, 8 January 2025)
- L-91-053, Combined Semiannual Radioactive Effluent Release Rept for Period Jul-Dec 1990 + (06:17:04, 8 January 2025)
- ML17308A515 + (06:17:41, 8 January 2025)
- L-90-421, Forwards Summary Sheets of 1990 Operator License Requalification Exam Results.Exam Conducted During Wks of 901029 & 1105.Encl Withheld (Ref 10CFR2.790(a)(6)) + (06:17:44, 8 January 2025)
- ML17308A512 + (06:17:44, 8 January 2025)
- IR 05000335/1990028 + (06:18:01, 8 January 2025)
- 05000389/LER-1990-005-03, :on 901112,component Cooling Water HX Pinhole Leak Discovered Due to Shell to Tube Sheet Weld Degradation. Sample of West End Weld Removed & Sent to Lab for Failure Analysis + (06:18:05, 8 January 2025)
- ML17308A508 + (06:18:07, 8 January 2025)
- ML17308A507 + (06:18:08, 8 January 2025)
- TAC:68608 + (06:18:09, 8 January 2025)
- ML17308A504 + (06:18:10, 8 January 2025)
- L-90-215, Rept of 10CFR50.59 Plant Changes, Covering 890123-900122 + (06:18:12, 8 January 2025)
- L-90-210, Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions + (06:18:15, 8 January 2025)