1 SeabrookLANPEm Resource From:

Buford, Angela Sent:

Thursday, March 02, 2017 8:30 AM To:

Deborah Grinnell

Subject:

RE: Re: The NRC acceptance of the SLA Hi Debbie, Thank you for taking the time to reach out with these concerns. I am forwarding to Fred Bower, the responsible branch chief for NRCs Oversight of Seabrook. It has been the practice of that branch in Region I to consolidate questions and provide feedback as applicable. I did want to clarify one part of your email right now regarding the NRCs acceptance review process. The NRC accepted the license amendment request, meaning that the request reasonably appears to contain sufficient technical informationfor the NRC staff to complete the detailed technical review and renderan independent assessment NRCs Acceptance only means that the application contains enough information to begin a technical review, it is not a decision on the approval or the license amendment; the NRC will still approve or deny the license amendment per our review process.

NRC Acceptance Review guidance: https://www.nrc.gov/docs/ML0918/ML091810088.pdf NRC License Amendment Review guidance: https://www.nrc.gov/docs/ML1132/ML113200053.pdf

Thanks, Angie Angela Buford, PE Structural Engineer, Division of License Renewal, NRR US Nuclear Regulatory Commission 301-415-3166 From: Deborah Grinnell [1]

Sent: Wednesday, March 01, 2017 4:38 PM To: Buford, Angela <Angela.Buford@nrc.gov>

Subject:

[External_Sender] Re: The NRC acceptance of the SLA let me try it again.or is it to primarily to relicense the plant. I am so angry that the NRC will allow NextEra to operate with ASR with no ability to predict before loads shift and at an unknown time allow a collapse in a structure to occurs. The NRC will say that it was not predictedand the NRC would be right, the concrete in the rebar will" blow up" or the deformation will place pressure on a wall that will collapse, with the number of documented construction issues..it is a matter of time, On Mar 1, 2017, at 10:14 AM, Deborah Grinnell <grinnelldebbie2@gmail.com> wrote:

Angela, NextEra has not answered the questions you asked in research The NRC still can not state Seabrook is operating with ASR under their license and never will be able to operate safely under their UFSAR and current license.

NextEras SLA has not addressed how they will monitor ASR in the complexity required ( which is a guess) nor have they been reliable in monitoring ASR at Seabrook in all the NRC documentation. Since 2011 without the NRC inspectors violations or NRC RAIs to push them to learn and you learn and understand the requirements to monitor or even monitor under NRC pressure to corrective actions or violations or rewriting their responses to the NRC RAI.

Will they?? NO. The NRC studies are not complete or peer reviewed, right??

2 BUT you know you needed the NIST study done and peer reviewed in a gold standard.

I can not believe the NRC accepted NextEra license amendment. Did you accept the SLA ?? Did the NRC research division accept the SLA?? Did anyone? How?

Is the decision based on on basis.you dont have an ASR basis to accept it. The operative determination is singularly based on a single day..ASR at Seabrook will collapseand to continue to operate the plant you will only continue to report SEABROOKs ASR until the one report about a collapse. Hopefully it will not be at a ground level radiation release and the public radiation health exposure lot of people are at riskisnt that your job to protect usor is it to primarily to release the plant?? I has been proven, hasnt it?? Lawyers can not morally cover your responsibly, can they?

Debbie

Hearing Identifier:

Seabrook_LA_NonPublic Email Number:

365 Mail Envelope Properties (Angela.Buford@nrc.gov20170302082900)

Subject:

RE: Re: The NRC acceptance of the SLA Sent Date:

3/2/2017 8:29:45 AM Received Date:

3/2/2017 8:29:00 AM From:

Buford, Angela Created By:

Angela.Buford@nrc.gov Recipients:

"Deborah Grinnell" <grinnelldebbie2@gmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3764 3/2/2017 8:29:00 AM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: