Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202G880 + (07:30:57, 8 December 2024)
- 05000388/LER-1986-007-01, :on 860609,as-found Leakage Exceeded Tech Spec 3.6.1.2 Criteria During Integrated Leak Rate Test.Cause Unstated.Isolation Valves Reworked + (07:30:59, 8 December 2024)
- 3F1297-06, Special Rept 97-07:re Hoop Tendon 51H26 That Was Found to Have Normalized lift-off Force of More than 10% Below Predicted Value.Out of Tolerance Tendons Were Returned to Proper pre-stress Level.Commitment Attached + (07:31:00, 8 December 2024)
- 05000213/LER-1986-028, :on 860610,switchgear Room Halon Sys Declared Inoperable.Caused by Failure to Perform Adequate Retest of Sys Mod & Document Basis for Test Waiver.Continuous Fire Watch Posted + (07:31:02, 8 December 2024)
- ML20202G871 + (07:31:03, 8 December 2024)
- ML20202G873 + (07:31:03, 8 December 2024)
- IR 05000344/1986024 + (07:31:04, 8 December 2024)
- ML20202G866 + (07:31:05, 8 December 2024)
- ML20202G863 + (07:31:06, 8 December 2024)
- ML20202G864 + (07:31:06, 8 December 2024)
- ML20202G862 + (07:31:07, 8 December 2024)
- ML20202G859 + (07:31:08, 8 December 2024)
- ML20202G858 + (07:31:09, 8 December 2024)
- ML20202G857 + (07:31:09, 8 December 2024)
- ML20202G855 + (07:31:10, 8 December 2024)
- ML20202G854 + (07:31:11, 8 December 2024)
- ML20202G852 + (07:31:14, 8 December 2024)
- ML20202G851 + (07:31:15, 8 December 2024)
- ML20202G845 + (07:31:16, 8 December 2024)
- ML20202G844 + (07:31:17, 8 December 2024)
- ML20202G843 + (07:31:18, 8 December 2024)
- ML20202G842 + (07:31:19, 8 December 2024)
- NOC-AE-000388, Forwards Corrected Westinghouse Application Ltr CAW-98-1303 for Withholding Proprietary Info from Public Disclosure Associated with WCAP-13698 & WCAP-13699 + (07:31:20, 8 December 2024)
- ML20202G837 + (07:31:20, 8 December 2024)
- ML20202G834 + (07:31:21, 8 December 2024)
- ML20202G833 + (07:31:22, 8 December 2024)
- ML20202G830 + (07:31:23, 8 December 2024)
- ML20202G829 + (07:31:23, 8 December 2024)
- ML20202G827 + (07:31:24, 8 December 2024)
- 3F1297-19, Application for Amend to License DPR-72,proposing Changes to Improved TSs for CREVS & to Vftp.List of Commitments,Summary of Changes,Reason & Justification for Request,Control Room post-accident Dose Calculations & Analysis Also Encl + (07:31:25, 8 December 2024)
- 05000247/LER-1986-008, :on 860205,discovered That Setpoints on Three Degraded Bus Voltage Relays on 480-volt Buses Not within Tech Spec Range.Caused by Setpoint Drift Due to Vibration, Temp Change & Aging.Relays Reset & Tested + (07:31:26, 8 December 2024)
- ML20202G822 + (07:31:28, 8 December 2024)
- ML20202G821 + (07:31:29, 8 December 2024)
- ML20202G819 + (07:31:30, 8 December 2024)
- ML20202G818 + (07:31:31, 8 December 2024)
- ML20202G815 + (07:31:31, 8 December 2024)
- IR 05000206/1986033 + (07:31:32, 8 December 2024)
- JAFP-98-0046, Forwards Revised Amend to DPR-59,revising TS Table 3.2-2 & 4.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements. W/Revised TS Pages & Safety Evaluation + (07:31:33, 8 December 2024)
- ML20202G808 + (07:31:34, 8 December 2024)
- ML20202G809 + (07:31:34, 8 December 2024)
- ML20202G803 + (07:31:35, 8 December 2024)
- ML20202G801 + (07:31:36, 8 December 2024)
- ML20202G802 + (07:31:36, 8 December 2024)
- ML20202G800 + (07:31:37, 8 December 2024)
- ML20202G796 + (07:31:38, 8 December 2024)
- ML20202G799 + (07:31:38, 8 December 2024)
- ML20202G793 + (07:31:39, 8 December 2024)
- 3F1297-11, Application for Amend to License DPR-72,revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal + (07:31:40, 8 December 2024)
- 05000263/LER-1986-016, :on 860611,both Squib Valve Detonators Shorted After Firing & Control Power Transformer Fuse Blew,Causing Pump Motor Trip.Caused by Improper Fuse Coordination.Fuse Coordination Corrected + (07:31:41, 8 December 2024)
- 05000219/LER-1986-011-01, :on 860609,spurious Signal Caused Isolation of Secondary Containment & Initiation of Standby Gas Treatment Sys.Caused by Spike in Power Supply of Reactor Bldg Vent Radiation monitors.RN37 Power Supply Replaced + (07:31:43, 8 December 2024)
- ML20202G787 + (07:31:44, 8 December 2024)
- ML20202G784 + (07:31:45, 8 December 2024)