y GPU Huclear Corporation
. NggIgf Post Office Box 388 Route 9 South Forked River New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:
June 27, 1986 Mr. John A. Zwolinski, Director BWR Project Directorate No.1 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Zwolinski:
Subject:
Oyster Creek Nuclear generating Station Docket No. 50-219 Implementation of Generic Requirements Our letter of June 2,1986 described the level of effort required to properly respond to your request for the Oyster Creek status on the implementation of various Multi-Plant Actions (MPAs) which the NRC has been tracking internally. We stated that it would possibly require several man-years of effort to properly respond to your request.
However, after receipt of our letter, the immediacy of your need for the information was discussed with GPUN management. Based on that discussion, we committed to respond by June 27, 1986 with a reduced scope of our effort.
Due to the time constraints, we have not been able to do a thorough search of our records or physically verify the documented actions to determine a status as accurately as is our normal policy for NRC submittals.
The attached markup of your list of generic requirements show GPUN's status for each of the MPAs that we feel we can identify from the information you have provided.
In some cases, we still do not have a clear identification of the MPA. These items, which are marked with an asterisk, were given to Mr. J. Donohew on June 23,1986 with the understanding that further clarification or information is needed. For the remaining items, our response is based on our best estimate of the action that was required when the MPA was initiated. Some of the MPAs clearly have periodic update requirements. Some of the MPAs deal with issues which have been the subject of on-going requests. Therefore, a MPA shown to be complete does not indicate any additional required actions which relate to the same subject area. For active items, the dates which are given are not intended to revise any commitment date previously provided.
[
GPU fiu(,ieat Cuperation is a subsidiary of the General Public Utilities Corporation
.= -
- If it appears that we have misinterpreted any of the MPAs or a more accurate status is desired, please inform us.
If there are any questions, please contact Mr. Michael Laggart of my staff at (201)299-2341.
Very truly yours, Vice President and Director Oyster Creek PBF:ML:3600f 3
(0024t)
Attachments cc: Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA. 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 Mr. J. Donohew, Project Manager i
U.S. Nuclear Regulatory Commission Phillips Building,11 ail Stop No. 314 7.920 Norfolk Avenue Bethesda, Maryland 20014 l
l t
i t
+
g
LIC ACT TAE NO.
MPA #
TITLE COMPLETE STATUS M05 '3 34 A-01 10 CFR 50.55 A(G) - ISI 06/28/83C Comple MOS100 A-02 APPENDIX I - ALARA 04/30/86 Projec Mub908*
A-03 JECUk1TY REVIEW 5-MODIF1ED AMENDMENT PIANS 09/14/79C M()b l 04*
A-04 APPENDIX J - CONTAINMENT LEAK TESTING 01/01/70C Mohb78 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 03/03/82C Projec
\\
M07922 A-05 GE MARK 1 CONTAINMENT TECH SPECS-SHORT TERM 06/28/78C Compleh MI1638 A-OH ECU5 EVAL.UATION-GENERIC PER 50.40 COMPLIANCE 05/30/79C Comple M11ibb*
A-09 PRE 5SURE VESSEL BELTLINE MATERIAL SURVEILLANCE 10/16/79C Mlth97 A-10 CONTINGENCY PLANNING 09/25/80C Comple.
Molbh $
A-ll GUAkb TRAINING PLANS 02/ll/81C Comple Mlun00 A-12 VITAL AREA ANAL.YSIS 04/12/82C Complet M1.651*
A-15 QUALITY AS5URANCE REQUEST REGARDING DIESEL GENERAT 01/30/80C M47116 A-16 QUAL.:FICATIONS OF EXAMINATION, INSEECTION, TESTING 03/ll/82C Complef
- Milll, A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 09/30/86 Projee M33/26 A-lb TECH SPECS AFFECTED BY 50. 72 AND 50. 7 3 (GL 83-4 3 )
05/30/8SC Projec Mvel22 A-2U lu LFR 50.62 OPERATING REACTOR REVIEWS 06/30/86 Projec Mub 3 34 B-02 FIkE PROTECTION 03/03/78C Projec M!.0668 E STRE55 CORROSION CRACKING - BWR RCSPB 06/29/84C Pro jec MU5224*
B-07 5TkEbS CORROSION CRACKING - BWR RCSFB 10/17/79C
- Nkr Project Manager to provide additional information
.~_r,_..
- .-=..=
LIC ACT TAC NO.
MPA #
I_1 T L_E_ _ _ _ _
COMPLETE ST_ATUS M06200 B-06 BWR RELIEF VALVE 01/16/80C M12145 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C Comple M08440 B-17 TECH.iPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/31/86 Comple.
M102"7*
B-20 CONTAINMENT 1.EAKAGE DUE TO SEAL DETERIORATION 01/16/81C M10349*
B-21 10SS OF 123-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C
\\
MOS439 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/31/86 Comple M100 38 B-23 DEGRADED GRID VOLTAGE lO/16/81C Comple -
M10191 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 08/25/80C M '. 2 c l $
- b-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW Ol/21/86C rrojee M' LM L 1 1 b-25 EWR FEEDWATER N0ZZLE CRACKING 03/19/82C Projee M10891*
B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C MU/404*
B-2/
REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 07/01/78C M11015*
b-29 BWR FEEDWATER PUMP TRIP 11/30/78C Mill 04 E-41 FIRE PROTEFTION - FINAL TECH SPECS (INCLUDES SER S 02/13/81C Comple.
Mll733 E-42 TMI FULLOW LP - ALL PLANTS 05/08/80C See B-M12422 B-44 LESSUNS LEARNED IMPLEMENTATION 03/27/81C Projec M!2919 E-43 WASH 1400 EVENT V,
" PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Comple M42083*
E-46 ANALY5IS OF TURBINE DISC CRACKS 05/15/80C M:2699*
h-47 ECC5; CLAD SWELLING AND RUPTURE 07/20/80C M12/66 E-48 ADF QUACY OF STATION ELECTRIC DISTRIBUTION VOI TAGE 10/16/81C Comple M42215 E-38 SDV CAPABILITY 10/15/82C Comple L
w i
~
LIC ACT TAU NO.
MPA #
TITLE COMPLETE STATUS-e M42914 B-59 MASONRY WALL DESIGN 12/23/85C Projec M42524 B-60 ENVIRONMENTAL. QUALIFICATION 05/28/85C Comple' M42t92*
B-61 LOS5 0F NON C LASS IE I&C POWER 07/28/82C M427b3*
b-62 E5F RESET CONTkOL DESIGN DEFICIENCY 06/21/82C M41919 B-63 INTERIM PROCEDURES FOR 5H0kl l'ERM BLACKOUT 09/04/81C
- Comple, MS1717 B-63 SAFETY CONCERNS A550CIATED WITH PIPE BREAKS IN BWR 01/27/86C Complek 5
M4hb23*
B-70 FATIGUE TRANSIENT LIMIT TS 05/25/82C M,loS7 B-72 NUREG 0737 TECH SFZCS (GENERIC LETTER 82-16) 05/30/85C Projer Mi2782 B-76 ITEM 1.1 - POST TRIP REVIEW; PROGRAM DESCRIPTION &
05/14/85C Projec-M,2503 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 11/30/86 Projec~_
I M,2944 B-78 ITEMS 3.1.1 & 3.1.2 - POST MAINTEN ANCE TEST PROCEDU 04/30/86 Projee_
1 5
5 M,3025 B-79 ITEM s.l.3 - POST MAINTENANCE TESTING - CHANGES TO 07/30/86 Comple.
[
M,4554 B-83 TECH 5PECIFICATIONS COVERED BY GENEkIC LETTERS 83-11/22/85C Comple-
= 3 e
2 M,,605 B-84 IN5PECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 08/05/85C Projec[
E M,3615 E-65 5AI.EM ATWS 1.2 DATA CAPABILITY 05/31/86 Comple_
g M,io98 B-S6 SALEM ATWS 2.2 S-R COMPONENTS 01/30/87 Projec-3 E
781 B-87 SALEM ATWS 3.2.1 & 3.2.9 S-R COMPONENTS 04/30/86 P ro j e c-d M, Ju 4 B-bb SAI EM ATWS 3.2.3 T.S.
S-R COMPONENTS 07/30/86 Comple m
^
a M,0091 B-92 SALEM ATSW 4.5.1 DIVERSE TRIP FEATURES 05/15/8b Comple-Mn4008 B-9?
5ALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIVES 04/30/86 Compic d
Mu8282 C-02 BWR-RLUIRC PUMP TRIP (ATWS) 08/20/79C Comp l e-
- - L r ule r review by the NRC
^
M
se-mm.-
.M LIC ACT TAC _No.
MPA #
TITLE COMPLETE STATUS M': 7128 C 10 CONTRO! 0F HEAVY LOADS OVER SPENT FUCL P00' ( P!! ASC 06/21/83C Comple M07147 C-Il RPS POWER SUPPLY 03/30/83C Projec M52253 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/28/85C Comple Projecl M07944 D-01 GE 51 ARK I CONTAINMENT EVALUATION - LONG TERM 01/13/84C M!OO70*
D-ll F15SION GAS RELEASE 10/13/78C 5
k Mu/961*
D-12 NON-JET PUMP BWR CORE SPRAY PERFORMANCE 04/06/83C M12291*
D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/18/81C M430,1 D-17 DEFINITION OF OPERABLE 10/29/82C Comple N'3M85 D-19 DIESEL GENERATOR RFLIABILITY TECH SPECS (GL 84-15) 10/07/85C Projec M,7161 D-20 MARK I DhYWEI I. VACUUM BREAKERS - I.ICENSEE RESPONSE 06/30/86 Projec M44043 F-01 1.A.l.1 SHIFT TECHNICAL ADVISOR 01/15/82C Comple M44112 F-02 I.A.l.3 SHIFT MANNING 11/28/83C Comple M441M3 F-03 1.A.2.1 UPGRADED OF HO AND SRO TRAINING ll/30/82C Comple M44254 F-04 I.C.l.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C Comple:
M44324 F-03 I.C.l.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 03/30/87 Comple:
94/237 F-06
!.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/01/82C Comp l e-M4 7 509 F-07 I. C.
6 CURRECT PERFORMANCE OF OPERATING ACTIVITI 02/01/82C Comple Mn1185 F-0S I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 10/10/84C Projec M11265 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 03/05/86C P ro.j e c N64 39 3 F-10 II.B.1 RCS HIGH POINT VENTS 09/02/83C Comple-
+t.urrently in ne go t i u t. i u ns with NRC
~ + g o a".s.
.,'Mw w: #.. "... c....e. - m> - on. m, a.
.O T
g
.,f.s 5
.^ ~
'N-
?
4 k. *:
.:.lb '._ ^
')
.'. } _.,,,, ' - ;,,#
- [
7,_
,._9.
- 7...,
..
- 9 ll
~
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE M08334 A-01 10 CFR 50.55 A(G) - ISI 06/28/83C Complete 10/85 M08100 A-02 APPENDIX I - ALARA 04/30/86 Projected 11/87 M06908*
A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS 09/14/79C
-M06104*
A-04 APPENDIX J - CONTAINMENT LEAK TESTING 01/01/700 M08678 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 03/03/82C Projected 10/86 M07922 A-05 GE MARK I CONTAINMENT TECH SPECS-SHORT TERM 06/28/78C Complete 7/78 M11638 A-08 ECCS EVALUATION-GENERIC PER 50.46 COMPLIANCE 05/30/79C Complete 5/79 M11366*
A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 10/16/79C M10497 A-10 CONTINGENCY PLANNING 09/25/80C Complete 10/80 M07683 A-11 GUA'RD TRAINING PLANS 02/11/81C Complete 10/79 M10500 A-12 VITAL AREA ANALYSIS 04/12/82C Complete 10/79 M12651*
A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENERAT 01/30/80C M47116 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 03/11/82C Complete 9/82 M51115 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 09/30/86 Projected IAW Living Schedule M55726 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/30/85C Projected 7/86 M59122 A-20 10 CFR 50462 OPERATING REACTOR REVIEWS 06/30/86 Projected 12/88 M06534 B-02 FIRE PROTECTION 03/03/78C Projected 11R M46668 B-05 STRESS CORR 0d'qN CRACKING - BWR RCSPB 06/29/84C Projected 11R M08224*
B-05 STRESS CORROSION CRACKING - BWR RCSPB' 10/17/79C CNRC Project Manager to provide additional information
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE-M08200 B-06 BWR RELIEF VALVE 01/16/80C M12145 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C Complete 4/81 M08440 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/31/86 Complete 4/86 M10287*
B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/16/81C M10349*
B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C M08439 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECilANICAL 03/31/86 Complete 4/86 M10038 B-23 DEGRADED GRID VOLTAGE 10/16/81C Complete 2/85 M10191 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 08/25/80C M42613*
B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 01/21/86C Projected 11R M08411 B-25 BWR FEEDWATER N0ZZLE CRACKING 03/19/82C Projected 13R M10891*
B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C M07404*
B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFCAS EXPL 07/01/78C M11015*
B-29 BWR FEEDWATER PUMP TRIP 11/30/78C M11104 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 02/13/81C Complete 1/82 M11755 B-42 TMI FOLLOW UP - ALL PLANTS 05/08/800 See B-44 M12422 B-44 LESSONS LEARNED IMPLEMENTATION 03/27/81C Projected 9/87 M12919 B-45 WASH 1400 EVENT V. " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Complete 5/81 M42083*
B-46 ANALYSIS OF TURBINE DISC CRACKS 05/15/80C M12699*
B-47 ECCS; CLAD SWELLING AND RUPTURE 07/20/80C M12766 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/16/81C Complete 2/85
, M42215 B-58 SDV CAPABILITY 10/15/82C Complete 1983
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE M42914 B-59 MASONRY WALL DESIGN 12/23/85C Projected 11/87 M42524 B-60 ENVIRONMENTAL QUALIFICATION 05/28/85C Complete 11/85 M42692*
B-61 LOSS OF NON CLASS IE I&C POWER 07/28/82C M42763*
B-62 ES'F RESET CONTROL DESIGN DEFICIENCY 06/21/820 M43919 B-63 INTERIM PRCCEDURES FOR SHORT TERM BLACKOUT 09/04/810 Complete 10/84 M43717 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BWR 01/27/86C Complete 1/86 M46623*
B-70 FATIGUE TRANSIENT LIMIT TS 05/25/82C M51687 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/30/85C Projected 11R M52782 B-76 ITEM 1.1 - POST TRIP REVIEW; PROGRAM DESCRIPTION &
05/14/85C Projected 12R M52863 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 11/30/86 Projected 12/88 M52944 B-78 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TEST PROCEDU 04/30/86 Projected M53025 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 07/30/86 Complete 10/85 Mi4554 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-11/22/850 Complete 10/85 mis 605 B-84 INSPECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 08/05/85C Projected 11R M53615 B-85 SALEM ATWS 1.2 DATA CAPABILITY 05/31/86 Complete 4/86 M53698 B-86 SALEM ATWS 2.2 S-R COMPONENTS 01/30/87 Projected 12/88 V
M53781 B-87 SALEM ATWS 3.2.1 & 3.2.2 S-R COMPONENTS 04/30/86 Projected MS3864 B-88 SALEM ATWS 3.2.3 1.S. S-R COMPONENTS 07/30/86 Complete 10/85 M54091 B-92 SALEM ATSW 4.5.1 DIVERSE TRIP FEATURES 05/15/86 Complete 8/85 M54008 B-93 SALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIVES 04/30/86 Complete 6/85 M08282 C-02 BWR-RECIRC. PUMP TRIP (ATWS) 08/20/79C Complete 1981
--Under review by the NRC 1
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE M47128 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/21/83C Complete 6/84 M07147 C-11 RPS POWER SUPPLY 03/30/83C Projected 6/87 M52253 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/28/85C Complete 6/85 M07944 D-01 GE MARK I CONTAINMENT EVALUATION - LONG TERM 01/13/84C Projected 12R M10070*
D-11 FISSION GAS RELEASE 10/13/78C M07961*
D-12 NON-JET PUMP BWR CORE SPRAY PERFORMANCE 04/06/830 M12291*
D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/18/81C M43051 D-17 DEFINITION OF OPERABLE 10/29/82C Complete 11/82 M55885 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 10/07/85C Projected 7/86 M57161 D-20 MARK I DRYWELL VACUUM BREAKERS - LICENSEE RESPONSE 06/30/86 Projected 13R M44043 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/15/82C Complete 11/84 M44112 F-02 I.A.1.3 SHIFT MANNING 11/28/83C Complete 5/86 M44183 F-03 I.A.2.1 UPGRADED OF R0 AND SR0 TRAINING 11/30/82C Complete 11/82 M44254 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C Complete 4/86 M44324 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 03/30/87 Complete 10/85 M47237 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/01/82C Complete 10/80 M47309 F-07 I."C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/01/82C Complete 12/80 M51185 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 10/10/84C Projected 12R M51265 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 03/05/86C Projected 9/87 F'44393 F-10 II.B.1 RCS HIGH POINT VENTS 09/02/83C Complete 2/86
+ Currently in negotiations with NRC 9
J I
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE M44533 F-11 II.B.2 PLANT SHIELDING 04/19/85C Complete 9/85 M44462 F-12 II.B.3 POST ACCIDENT SAMPLING 08/29/84C Ccmplete 11/85 M44533 F-13 II.B.4 TdAINING FOR MITIGATING CORE DAMAGE 11/30/82C Complete 1/82 M44603 F-14 II.D.1 RV AND SV TRAINING 06/19/84C Complete 4/83 M44801 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 11/08/82C
+
V44872 F-19 II.E.4.2. CONTAINMENT ISOLATION DEPENDABILITY 08/31/83C
+
E44943 F-20 II.F.1.1 NOBLE CAS MONITOR 03/31/82C Complete 1984 M45014 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 03/31/82C Complete 1984 M45085 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 10/20/82C Projected 11R M47621 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 09/29/83C Complete 11/84 M47692 F-24 II.F.1.5 CONTAINMENT WATER LEVEL INSTRUMENT 09/29/83C Complete 11/84 M47763 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 09/29/83C Complete 11/84 M45155 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 08/09/85C Projected 11R M45365 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 06/10/82C Complete 12/84 M45548 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 03/03/82C N/A-0C M45558 F-44 II.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 12/18/81C Complete 4/81 M45600 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 10/23/84C Complete 12/84 M45651 F-47 II.K.3.17 ECCS OUTAGES 08/04/83C Complete 2/81 M45696 F-48 II.K.3.18 ADS ACTUATION 01/04/85C Complete 8/84 M45720 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 05/30/85C Projected 11R i
i l
LIC ACT LICENSEE TAC NO.
MPA #
TITLE COMPLETE STATUS DATE-M45744 F-50 II.K.3.21 RESTART OF CSS AND LPCI 05/27/83C Complete 11/84 M45768 F-53 II.K.3.25 POWER ON PUMP SEALS 10/22/82C Complete 2/82 M45792 F-54 II.K.3.27 COMMON REFERENCE LEVEL 04/13/82C Complete 11/84 M45802 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSER 02/01/84C Complete 2/86 M45848 F-57 II.K.3.30 SB LOCA METHODS 12/21/83C Complete 7/82 M48187 F-58 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46 12/21/83C Complete 7/82 M45892 F-59 II.K.3.44 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 06/18/82C Complete 2/82 M45916 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 05/17/83C Complete 2/81 M45967 F-63 III.A.I.2 TECHNICAL SUPPORT CENTER 03/03/86C Complete 2/85 M46038 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 03/03/86C Complete 4/82 M46110 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 03/03/86C Complete 3/84 M46182*
F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46254 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/09/83C Complete 5/83 M46326 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 03/03/86C Complete 10/84 M46397 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 06/29/82C Complete 7/82 M46466 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 03/31/86 Projected 12R M56147 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 02/27/86C Projected 12R i
~
~
3587f
- -