Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000482/LER-1986-014, :on 850731 & 860313,hourly Patrols of Fire Dampers Not Performed,Violating Tech Spec 3.7.11.Caused by Personnel Error.Patrols Reestablished & Rept Added to Reading List + (07:21:05, 8 December 2024)
- ML20202J023 + (07:21:06, 8 December 2024)
- ML20202J022 + (07:21:06, 8 December 2024)
- ML20202J021 + (07:21:07, 8 December 2024)
- ML20202J019 + (07:21:08, 8 December 2024)
- ML20202J018 + (07:21:08, 8 December 2024)
- ML20202J016 + (07:21:09, 8 December 2024)
- IR 05000312/1986008 + (07:21:11, 8 December 2024)
- ML20202J013 + (07:21:13, 8 December 2024)
- ML20202J012 + (07:21:13, 8 December 2024)
- ML20202J011 + (07:21:14, 8 December 2024)
- ML20202J008 + (07:21:15, 8 December 2024)
- ML20202J009 + (07:21:15, 8 December 2024)
- NPL-98-0099, Forwards Response to Violations Noted in Insp Repts 50-266/97-25 & 50-301/97-25.Corrective Actions:Remainder of Facade Freeze Protection Sys Evaluated & Preliminary Results Indicate That Several Addl Functions Should Be Added + (07:21:16, 8 December 2024)
- 05000457/LER-1997-005-08, :on 971106,relief Valve 2SI8851 Lifted & Failed to Reseat.Caused by Limited Margin Between Pump Start Pressure Transient & Valve Lift Setpoints.Replaced Failed Relief Valves W/New Valves & Performed Testing + (07:21:18, 8 December 2024)
- ML20202J004 + (07:21:19, 8 December 2024)
- ML20202J003 + (07:21:20, 8 December 2024)
- ML20202H999 + (07:21:20, 8 December 2024)
- 05000324/LER-1986-009, :on 860311,upscale Spike of Reactor Bldg Ventilation Exhaust Radiation Monitor Instrument Trip Unit Occurred.Cause Not Determined.Trip & Isolation Signals Reset & Sys Returned to Svc + (07:21:25, 8 December 2024)
- ML20202H995 + (07:21:30, 8 December 2024)
- TXX-4753, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305.Gibbs & Hill Directed to Determine Adequacy of Calculations + (07:21:31, 8 December 2024)
- ML20202H994 + (07:21:31, 8 December 2024)
- ML20202H991 + (07:21:32, 8 December 2024)
- 05000247/LER-1986-007, :on 860307,plant Heated Above 200 F Although Listed Transmitters Not Resealed,Per Environ Qualification Requirements.Caused by Not Recognizing Environ Status Should Have Been Restored.Procedures Reviewed + (07:21:33, 8 December 2024)
- ML20202H989 + (07:21:34, 8 December 2024)
- ML20202H987 + (07:21:35, 8 December 2024)
- ML20202H984 + (07:21:36, 8 December 2024)
- ML20202H985 + (07:21:36, 8 December 2024)
- ML20202H981 + (07:21:37, 8 December 2024)
- ML20202H983 + (07:21:37, 8 December 2024)
- ML20202H980 + (07:21:38, 8 December 2024)
- 3F0386-13, Suppl 2 to Special Rept 85-03:on 850807,intermediate- & high-range Channels of Gaseous Release Monitors RM-A1 & RM-A2 Not Calibr.Mod to Achieve Overlap & Calibr of Intermediate Channels Completed + (07:21:39, 8 December 2024)
- ML20202H978 + (07:21:39, 8 December 2024)
- ML20202H977 + (07:21:40, 8 December 2024)
- ML20202H976 + (07:21:41, 8 December 2024)
- 05000482/LER-1986-013, :on 860314,containment Depressurization Initiated W/Containment Atmosphere Radiation Monitor in Bypass Position,Violating Tech Specs 3.3.2 & 3.3.3.1.Caused by Personnel Error.Rept Added to Reading List + (07:21:47, 8 December 2024)
- ML20202H973 + (07:21:53, 8 December 2024)
- ML20202H969 + (07:21:54, 8 December 2024)
- ML20202H966 + (07:21:55, 8 December 2024)
- ML20202H968 + (07:21:55, 8 December 2024)
- ML20202H965 + (07:22:01, 8 December 2024)
- ML20202H962 + (07:22:02, 8 December 2024)
- ML20202H963 + (07:22:02, 8 December 2024)
- ML20202H961 + (07:22:03, 8 December 2024)
- ML20202H958 + (07:22:04, 8 December 2024)
- ML20202H956 + (07:22:05, 8 December 2024)
- ML20202H954 + (07:22:06, 8 December 2024)
- ML20202H950 + (07:22:12, 8 December 2024)
- 05000298/LER-1986-007, :on 860311,setpoint for Main Steam Line High Flow Primary Containment Isolation Determined to Have Been Based on Design Vs Rated Flow.Approval for Tech Spec Change & Temporary Waiver Granted by NRC + (07:22:18, 8 December 2024)
- 05000454/LER-1986-010-03, :on 860318,w/plant in Mode 1,main Control Room Outside Air Intake B Process Radiation Monitor OPR34J Went Into Interlock Mode Due to Loss of Sample Flow.Caused by Sample Pump Shutdown Due to Bumping Switch + (07:22:25, 8 December 2024)
- ML20202H943 + (07:22:27, 8 December 2024)
- NOC-AE-0074, Application for Amend to License NPF-80,incorporating Attached Amend to TS 3.4.5.Amend Will Implement 1-volt voltage-based Repair Criteria for SG Tube Support plate-to- Tube Intersections + (07:22:27, 8 December 2024)