ML20202H989
| ML20202H989 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/09/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Puntenney J SAFE ENERGY COALITION OF MICHIGAN |
| Shared Package | |
| ML20202H992 | List: |
| References | |
| FOIA-86-244 NUDOCS 8607170002 | |
| Download: ML20202H989 (4) | |
Text
- - - - -
Nhh UNITED STATES r
' 't NUCLEAR REGULATORY COMMISSION j
'VASHINGTON, D, C,20555
/
JUL a b86 Ms. Jennifer E. Puntenney Safe Energy Coalition of Michigan P.O. Box 331 IN RESPONSE REFER Monroe, MI 48161 TO F01A-86-244
Dear Ms. Puntenney:
This in partial response to your letter dated March 24, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of three categories of records regarding the Fermi 2 nuclear power plant.
In a telephone conversation on April 11, 1986, with Natalie Brown of my staff, you narrowed the scope of category 1 of your request to any documents produced as a result of any meetings between the NRC and the Detroit Edison Company since fuel loading.
The documents identified on enclosed Appendix A are already available in the NRC Public Document Room (PDR), located at 1717 H Street, NW, Washington, DC 20555.
I have indicated the PDR accession number beside each document description. The documents identified on enclosed Appendix B are being placed f
in the PDR in file folder F01A-86-244 in your name. We are enclosing a notice which provides for obtaining documents from the PDR.
The search for and review of documents that are subject to your request are continuing. We will notify you upon completion of the search and review.
Sincerely,
$ /,
,..;f,,
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated 0607170002 060~/09 l'DR FOIA l'UNTCNNDh-24 A gunn
a P-1 L
Re:
F01A-86-244 Appendix A Documents Already Available in the PDR 1.
02/19/85 Memo from Doolittle to Youngblood Accession No. 8502220354 2.
03/11/85 Letter from Denton to Puntenney Accession No. 8503180569 3.
09/19/85 Memo from Lynch to Novak Accession No. 8509260457
___________________a
k Appendix B F01A 86-244 Documents Being Placed in the POR 1.
04/02/85 Memo to Multiple Addressees from W. H. Jens re:
Minutes of Meeting with the Nuclear Regulatory Commission, April 1, 1985 (5 pages) 2.
07/01/85 Fermi 2 Readiness Briefing for Commissioner Asselstine (53 pages) 3.
07/02/85 Fermi 2 Premature Criticality Event of July 2, 1985, Summary of Findings (RSL 07/20/85) (2 pages) 4.
07/02/85 Outline for Meeting with NRC on 07/23/85 -
Rod Pull Event 07/02/85 (20 pages) 5.
07/15/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85-58 (1 page) 6.
07/17/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85-58A (1 page) 7.
07/23/85 Fermi 2 Presentation to NRC Region 3 - Premature Criticality of July 2, 1985 (36 pages) 8.
07/23/85 Handwritten notes - Management meeting - RIII (1 page) 9.
08/08/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85 __,(1 page)
- 10. 09/10/85 Presentation Outline (draft) (25 pages)
- 11. 09/10/85 Handwritten notes - 09/10/86 meeting (1 page)
- 12. 09/10/85 List of attendees at 09/10/85 meeting (2 pages) 13.
10/85 Handwritten notes for prescntation to the Monroe County Commissioners on 10/10/85 (2 pages)
- 14. Undated Handwritten notes " Fermi Items" (1 page) 15.
12/05/85 Memo from E. G. Greenman to R. Lickus re:
AITS No. F03048785, Inspection Report 50-341/85040 (1 page) 16.
12/11/85 Note to J. G. Keppler from A. 8. Davis re:
Fermi Diesel Generators (4 pages) 17.
01/24/86 Agenda - Equipment History Problems Other Causes Corrective Action Schedule (36 pages)
J N
Re F0AI-86-244
^
- 18. 01/24/86 Fenni 2 Diesel Generators Agenda (46 pages)
- 19. 01/31/86 Earthquake of January 31, 1986 (12 pages)
- 20. 02/10/86 Memo to L. A. Reyes from F. A. Maura re: Areas of Disagreement with Detroit Edison Company -
Diesel Generator Meeting of January 24, 1986 (4 pages)
- 21. 02/10/86 Fermi 2 Presentation to E. G. Adensam and M. D. Lynch (16 pages)
- 22. 02/14/86 Agenda of Management Meeting with Detroit Edison Company to Discuss Emergency Diesel Generator Issues (12 pases) 23.
Undated Meeting Handouts on Engineering issues (16 pages)
- 24. Undated Fermi 2 Engineering Review (21 pages)
- 25. Undated S&W Evaluation - Directed by C. M. Heidel, President DECO (1 page)
- 26. Undated Handwritten notes re: Bearing Failure on the Emergency Diesel Generators at Fermi 2 (6 pages)
- 27. 02/14/86 Presentation NRC - Detroit Edison Management Meeting to Discuss Emergency Diesel Generator Issues, Glen Ellyn, Illinois (8 pages)
- 28. 03/11/86 Memo from E. G. Greenman to J. G. Keppler re:
Ferrai Status w/ enclosures (250 pages)
- 29. 03/12/86 Slides re: Commission Briefing on Fermi 2 Status (S pages) 30.
Undated S&W Evaluation Completion of Engineering Work (2pages) 31 02/28/86 Memo from E. G. Greenman to N. J. Chrissotimos re:
Fermi 2 South Reactor Feedwater Pump Turbine Failure (DN50-341) (15 pages) 32.
2/10/86 Agenda - Visit of E. Adensam and M. Lynch (34 pages) 33.
3/7/86 Handwritten note from Lynch to Bernero and Houston (2 pages) 34.
3/8/85 Letter from Spessard to Jens (6 pages)
- 35. 8/28/85 flote to Christenburg from Lieberman (1 page) 36.
7/3/85 flote to Axelrad from Lieberman (1 page)
.