ML20202H976

From kanterella
Jump to navigation Jump to search
Advises That Addl Info Provided in Re UE Proposed TS Change to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SG Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954
ML20202H976
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/02/1997
From: Westreich B
NRC (Affiliation Not Assigned)
To: Taylor J
FRAMATOME
References
NUDOCS 9712110011
Download: ML20202H976 (3)


Text

_ __

$0kb

~

en REou g

p

\\

UNITED STATES

,}

NUCLEAP. REGULATORY COMMISSION WASHINGTON. D.C. 3084H001

\\l 4 %. /

December 2, 1997 Mr. James H. Taylor Manager Licensing Services Framatome Technologies. Inc.

3315 Old Forest Road P.O. Box 10935 Lynchburg. VA 24506-0935

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE -

FRAMAT0t'E TECHNOLOGIES. INC.

Dear Mr. Taylor:

By letter dated September 10, 1997. Union Electric Company (UE) responded to a g

request for additional information from the NF; staff regarding UE's proposed q

technical specification change to allow the installation of Framatome

.i electrosleeves in the Callaway Plant. Unit 1 steam generators and requested that it be withheld from public disclosurn pursuant to 10 CFR 2.790.

An affidavit. dated September 5.1997, from Framatome Technologies. Inc., the owner of the information, was included in the application.

Framatome Technologies. Inc. states that the submitted information should be considered exempt from mandetory public disclosure for the following reasons:

"(ii) b.

The information reveals data or material concerning FTI research or development plans or programs of present or potential competitive advantage to FTI.

c.

The use of the information by a competitor would decrease his expenditures in time or resources, in designing, producing or marketing a similar product.

d.

The information consists of test data or other similar data concerning a process, metnod or component, the application of which results in a competitive advantage to FTI."

We have reviewed vour application and the material in accordance with the requirementsof1DCFRz.790and,onthebasisofFramatomeTechnologies.Inc.

statements, have determined that the submitted infccmation sought to be withheld contains proprietary commercial information.

I O(Ol 2 Egg ppt w_e nny nm.

9712110011 971202 PDR ADOCK 05000403 L

l.llI.l l.lll..Il.l!ll ll[l.l.

u

.n

'Mr.LJamesLH;:Taylorr

-2L-

-December 2,1997

.Therefore, we havel determined that the additional information:provided in the September 10.-1997, letter from Union Electric. marked as 3ro

' withheld from public disclosure pursuant to 10 CFR 2.790())(prietary will?be

5) and Section:-

103(b) of the Atomic Energy Act of 1954, as amended, Withholding from public inspection shall not affect the right, _i_f any, of-

persons properly and~directly--concerned to inspect the documents.

If the need -

. arises.:we.may send copies of-this information to our consultants working in this. area. 'We will,-of course, ensure that.the consultants have signed the-appropriate agreements:for handling proprietary information.

If the basis for withholding thisiinformation from public inspection should change in the future such that the information could then be made available foripublic inspection. you should promptly notify the NRC.

You also should

~

understand that-the NRC may have cause to review this determination in the-

' future, for. example. if the scope of a Freedom of Information Act request includes' your information.

In all review: situations 'if-the:NRC makes a.

determination adverse to the above, you;will be notified in advance of-any Lpublic disclosure.

5 Sincerely WD wy Barry C. Westreich, Project Manager Project: Directorate IV-2 Division of-Reactor Projects III/IV Office of Nuclear; Reactor Regulation-

-cc:

See.next.page DISTRIBUTION:

4Mt!tR*(904887.

PUBLIC.

PDIV-2. Reading EGA1 WBateman EPeyton BWestreich

'MPSiemien JStrosnider PGwynn, Region IV Document Name: -CAL. WIT OFC' PDIV-2 PDIV-2 EMCB

p OGC {\\ N J

-NAME EPN BWestreich MtrosniM MPSiehen

'DATE-1068/97 M/ Y/97 N/6/97 5/b97 I

.0FFICIAL RECORD COPY-4

?'

j

., ~ -,

A

l (t

-Mr. James H. Taylor December 2, 1997-cc:

Professional Nuclear Mr. Otto L. Maynard Consulting. Inc.

President and Chief Executive Officer 3

i 19041 Raines Drive Wolf Creek Nuclear Operating Corporation Derwood._ Maryland 20855 P.O. Box 411 4

Burlington. Kansas 66839 1

Gerald Charnoff. Esq.

Thomas A. Baxter. Esq.

Mr. Dan I. Bolef. President Shaw. Pittman, Pctts & Trowbridge Kay Drey, Representative l

2300 N. Street. N.W.

Board of Directors Coalition Washington, D.C.

200T., -

for the Environment 6267 Delmar Boulevard Mr. H.=D. Bono University City. Missouri -63130 Supervising Engineer.

Site Licensing Mr. Lee Fritz

-_ Union Electric Company Presiding Commissioner Post Office Box 620 Callaway County Court House Fulton, Missouri 65251 10 East Fifth Street Fulton Missouri 65151 U.S. Nuclear Regulatory Commission Resident Inspector Office Mr. Alan C. Passwater.-Manager 8201 NRC Road Licensing and Fuels Steedman, Missouri 65077-1302 Union Electric Company Post Office Box 66149 Mr. J. V. Laux. Manager.

St, Louis. Missouri 63166-6149 Ouality Assurance Union Electric Company Mr. Garry L. Randolph Post Office Fox 620 Vice President and Chief Nuclear Officer Fulton, Missouri 65251 Union Electric Company Post Office Box 620 Manager - Electric Department Fulton Missouri 65251 Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City. Missouri 65102 Regional Administrator. Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive. Suite 400 Arlington. Texas 76011-8064 Mr. Ronald A. Kucera. Deputy Director Department of Natural Resources.

P.O. Box 176 Jefferson City. Missouri 65102 4

.