Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203K703 + (05:26:29, 8 December 2024)
- ML20203K698 + (05:26:30, 8 December 2024)
- ML20203K697 + (05:26:31, 8 December 2024)
- ML20203K693 + (05:26:38, 8 December 2024)
- ML20203K690 + (05:26:39, 8 December 2024)
- 05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 + (05:26:40, 8 December 2024)
- ML20203K685 + (05:26:40, 8 December 2024)
- ML20203K678 + (05:26:47, 8 December 2024)
- ML20203K671 + (05:26:48, 8 December 2024)
- ML20203K663 + (05:26:52, 8 December 2024)
- ML20203K661 + (05:26:52, 8 December 2024)
- ML20203K655 + (05:26:53, 8 December 2024)
- ML20203K653 + (05:26:54, 8 December 2024)
- ML20203K647 + (05:26:55, 8 December 2024)
- ML20203K642 + (05:26:56, 8 December 2024)
- ML20203K640 + (05:26:57, 8 December 2024)
- 05000296/LER-1986-006-03, :on 860714,fire Protection Water Main Water for Sprinklers Discovered Unavailable.Caused by Failure to Remove Welded Pipe Blank During Sys Testing.Blank Removed. Pipe Testing Planned + (05:26:59, 8 December 2024)
- ML20203K636 + (05:27:00, 8 December 2024)
- ML20203K632 + (05:27:03, 8 December 2024)
- ML20203K629 + (05:27:04, 8 December 2024)
- ML20203K631 + (05:27:04, 8 December 2024)
- PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified + (05:27:05, 8 December 2024)
- IR 05000259/1973012 + (05:27:06, 8 December 2024)
- ML20203K625 + (05:27:07, 8 December 2024)
- 05000354/LER-1986-037, :on 860712,grab Sample Not Obtained at 12 H Frequency.Caused by Personnel Error.Supervisor Counseled in Proper Determination of Equipment Operability.Event Will Be Included in Training Program + (05:27:09, 8 December 2024)
- IR 05000259/1973007 + (05:27:12, 8 December 2024)
- ML20203K618 + (05:27:13, 8 December 2024)
- ML20203K615 + (05:27:14, 8 December 2024)
- B16913, Provides Revised Schedule for Completion of Commitments Re Corrective Action Plan for Licensed Operator Training in Response to CAL 1-97-10 + (05:27:16, 8 December 2024)
- ML20203K609 + (05:27:17, 8 December 2024)
- 05000388/LER-1986-010-01, :on 860717,reactor Manually Shut Down Due to Excessive Unidentified Drywell Leakage.Caused by Leaking RHR Loop B Injection Testable Check Valve HV-251-F050B.Valve Repacked & Returned to Svc + (05:27:43, 8 December 2024)
- ML20203K592 + (05:27:44, 8 December 2024)
- IR 05000291/2011001 + (05:27:46, 8 December 2024)
- ML20203K585 + (05:27:48, 8 December 2024)
- ML20203K586 + (05:27:48, 8 December 2024)
- ML20203K580 + (05:27:49, 8 December 2024)
- ML20203K578 + (05:27:50, 8 December 2024)
- ML20203K576 + (05:27:50, 8 December 2024)
- ML20203K575 + (05:27:52, 8 December 2024)
- NOC-AE-0037, Submits Annual Rept Re Revs to Accepted ECCS Evaluation Model,Per 10CFR50.46(a)(3)(ii) + (05:27:53, 8 December 2024)
- ML20203K569 + (05:27:54, 8 December 2024)
- IR 05000259/1973004 + (05:27:55, 8 December 2024)
- ML20203K565 + (05:27:56, 8 December 2024)
- ML20203K564 + (05:27:57, 8 December 2024)
- ML20203K558 + (05:27:59, 8 December 2024)
- NOC-AE-0046, Notifies Commission That SRO Wl Kidd,License 42352-1,will No Longer Serve in Position Requiring License,Per 10CFR50.74 + (05:27:59, 8 December 2024)
- ML20203K555 + (05:28:00, 8 December 2024)
- ML20203K556 + (05:28:00, 8 December 2024)
- ML20203K551 + (05:28:01, 8 December 2024)
- ML20203K550 + (05:28:03, 8 December 2024)
- ML20203K546 + (05:28:17, 8 December 2024)