Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203M542 + (04:59:20, 8 December 2024)
- ML20203M545 + (04:59:20, 8 December 2024)
- ML20203M539 + (04:59:21, 8 December 2024)
- ML20203M538 + (04:59:22, 8 December 2024)
- ML20203M536 + (04:59:22, 8 December 2024)
- ML20203M532 + (04:59:23, 8 December 2024)
- 05000295/LER-1986-019, :on 860514,QA Dept Discovered That Fuel Handling Instruction FHI-21,Rev 4,not Reviewed by Technical Staff Supervisor.Caused by Personnel Error.Ler Will Be Distributed to Personnel Involved in Review + (04:59:26, 8 December 2024)
- ML20203M529 + (04:59:27, 8 December 2024)
- ML20203M524 + (04:59:28, 8 December 2024)
- IR 05000029/1986007 + (05:00:20, 8 December 2024)
- ML20203M516 + (05:00:21, 8 December 2024)
- ML20203M520 + (05:00:21, 8 December 2024)
- ML20203M515 + (05:00:22, 8 December 2024)
- ML20203M514 + (05:00:26, 8 December 2024)
- IR 05000461/1986055 + (05:00:28, 8 December 2024)
- ML20203M512 + (05:00:29, 8 December 2024)
- ML20203M509 + (05:00:30, 8 December 2024)
- ML20203M511 + (05:00:30, 8 December 2024)
- ML20203M506 + (05:00:31, 8 December 2024)
- ML20203M507 + (05:00:31, 8 December 2024)
- ML20203M502 + (05:00:32, 8 December 2024)
- ML20203M501 + (05:00:33, 8 December 2024)
- ML20203M498 + (05:00:34, 8 December 2024)
- NG-98-0342, Application for Amend to License DPR-49,revising Improved Tech Specs for Plant,Per NUREG-1433 + (05:00:36, 8 December 2024)
- ML20203M486 + (05:00:38, 8 December 2024)
- ML20203M482 + (05:00:39, 8 December 2024)
- U-600656, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-28.Corrective Actions:Fog Nozzle at Hose Station 1FP603Q Replaced by Straight Stream Nozzle on 860429 & All Hose Stations Inspected & Procedures Revised + (05:00:40, 8 December 2024)
- ML20203M472 + (05:00:41, 8 December 2024)
- ML20203M470 + (05:00:42, 8 December 2024)
- IR 05000254/1986013 + (05:00:46, 8 December 2024)
- HL-5583, Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2 + (05:00:46, 8 December 2024)
- ML20203M463 + (05:00:47, 8 December 2024)
- ML20203M457 + (05:01:00, 8 December 2024)
- ML20203M455 + (05:01:00, 8 December 2024)
- ML20203M452 + (05:01:01, 8 December 2024)
- ML20203M451 + (05:01:02, 8 December 2024)
- 05000346/LER-1986-033, :on 860729,determined That Some Blowout Panels in Shield Bldg Wall Would No Longer Withstand Differential Pressure During Loca.Caused by Inadequate Technical Review of Panel Design Functions.Panel Revised + (05:01:05, 8 December 2024)
- 2CAN029805, Forwards SG Tubing ISI Rept Which Presents Results from ANO-2 Twelfth Refueling Outage Conducted During May 1997. 2R12 ISI Scope Included 100% of Examined Full Length W/ Bobbin Probe in Both SGs + (05:01:08, 8 December 2024)
- 05000304/LER-1986-015-04, :on 860729,inadvertent ESF Equipment Actuated During Safeguards Testing.Probably Caused by Sticky Contact on Reset Pushbutton.Reset Pushbutton Replaced + (05:01:11, 8 December 2024)
- ML20203M436 + (05:01:12, 8 December 2024)
- ML20203M432 + (05:01:26, 8 December 2024)
- ML20203M424 + (05:01:29, 8 December 2024)
- ML20203M427 + (05:01:29, 8 December 2024)
- IR 05000269/1986021 + (05:01:31, 8 December 2024)
- ML20203M417 + (05:01:36, 8 December 2024)
- ML20203M416 + (05:01:37, 8 December 2024)
- 05000354/LER-1986-053, :on 860804,Channel a LOCA Logic Actuation Occurred Due to Invalid Low Water Level 1 Signal.Caused by Personnel Error.Technician Counseled Re Ramifications of Improper Valving During Test Performance + (05:01:40, 8 December 2024)
- ML20203M412 + (05:01:41, 8 December 2024)
- ML20203M409 + (05:01:42, 8 December 2024)
- ML20203M407 + (05:01:43, 8 December 2024)
- ML20203M403 + (05:01:43, 8 December 2024)