ML20203M539
| ML20203M539 | |
| Person / Time | |
|---|---|
| Issue date: | 03/04/1998 |
| From: | Craig C NRC (Affiliation Not Assigned) |
| To: | Essig T NRC (Affiliation Not Assigned) |
| References | |
| PROJECT-691, PROJECT-692 NUDOCS 9803090045 | |
| Download: ML20203M539 (6) | |
Text
e a
March 4, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Claudia M Craig, Senior Project Manager Original Signed By:
l Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH THE JOINT OWNERS GROUP (JOG)
DATE AND TIME:
March 31,1998 8:30 am - 3:00 pm LOCATION:
Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room O-1/F5 l
PURPOSE:
To discuss the initial results of the JOG dynamic testing programs, PARTICIPANTS:
NRC JRG R. Wessman S. Loehlein D. Terao G. Warren
- T. Scarbrough F. Winter, et al.
G. Weidenhamer C Craig, et al.
Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the ' Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wlah to attend should contact Claudia Craig (NRC) at (301) 415-1053.
D cc: See attached page GC>
DOCUMENT NAME: g:\\ CMC 1\\33198 JOG.NOT DISTRIBUTION: See next page
[]p; dim 1l OFFICE PM:PGEB (A)SC:PGEB -
gpg6%
CCraig:hsfb MM NAME DATE 3/4 /98 3/d 198
{@
OFFICIAL' RECORD COPY votiUb ll!I!Il!l.II.IIlli 9003090045 900304 PDR TOPRP EMVQENE PDR C.,,
p itig, p *'
t UNITED STATES g
}
_ NUCLEAR REGULATORY COMMISSION -
t WASHINGTON, D.c. 30666-0001
\\*..../
March 4, 1998 MEMORANDUM TO: Thomas h dssig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation -
FROM:
Claudia M. Craig, Senior Project Manager bl 1
b Generic issues and Environmental Projects Branch h
Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH THE JOINT OWNERS GROUP (JOG)
DATE AND TIME:
March 31,1998 8:30 am - 3:00 pm l
LOCATION:
Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room O-1/F5 PURPOSE:
To discuss the initial results of the JOG motor-operated valve (MOV) dynamic testing programs.
PARTICIPANTS:
NHQ IQfa R. Wessman S. Loehlein D. Terao G. Warren T. Scarbrough F. Winter, et al.
G. Weidenhamer C. Craig, et al.
Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal RegistBI 48344,9/20/94. Members of the public who wish to attend should contact Claudia Craig (NRC) at (301) 415-1053.
cc: See attached page
Project No. 691 Boiling Water Reactor Owners Group cc:
Thomas J. Rausch, Chairman Warren W. Glenn Boiling Water Reactor Owners' Group Southern Nuclear / Georgia Power Commonwealth Edison Company E.I. Hatch Nuclear Plant Nuclear Fuel Services PO Box 1295 M/C B052 1400 Opus Place,4th Floor ETWill Birmingham, AL 35201 I
Downers Grove,IL 60515 Carl D. Terry Dennis B. Townsend Vice President, Nuclear Engineering GE Nuclear Energy Niagara Mohawk Power Corporation M/C 182 Nine Mile Point-2 175 Curtner Avenue PO Box 63 San Jose, CA 95125 Lycoming, NY 13093 Drew B. Fetters Thomas A. Green PECO Energy GE Nuclear Energy Nuclear Group Headquarters Mail Code 182 MC 62C-3 175 Curtner Avenue 965 Chesterbrook Blvd.
San Jose, CA 95125 Wayne, PA 19087 John Hosner K.K. Sedney Commonwealth Edison GE Nuclear Energy Executive Towers,4th Floor 175 Curtner Ave, M/C 182 1400 Opus Place San Jose, CA 95125 Downers Grove,IL 60515 George T. Jones Pennsylvania Power & Light MC A6-1 Two North Ninth Street Allentown, PA 18101 Lewis H. Sumner Southern Nuclear / Georgia Power E. l. Hatch Nuclear Power Plant U.S. Route 1 North, Box 439 Baxley, GA 31513 L. A. England Entergy Operations Inc.
PO Box 31995 Jackson, MS 39286
Westinghouse Owners Group cc:
Mr. Nicholas Liparulo, Manager Regulatory and Engineering Networks Westinghouse Electric Corporation Mail Stop ECE 4-15 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, PA 15230-0355 l
Mark Beaumont Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike, Suite 450 Rockville, MD 20852
CE OWNERS GROUPProject No. 6S?.
cc:
Mr. Gordon C. Bischoff CEOG Project Manager ABB Combustion Engineering M.S. 9615-1932 2000 Day Hill Road Windsor, CT 06095 Mr. David Pilmer, Chairman CE Owners Group San Onofre Nuclear Generating Station 14300 Mesa Road San Clemente, CA 92672 Mr. Charles P Brinkman, Director N iclear Syr...,ns Licensing ABB-Combusilon Engineering, Inc.
Post Office Box 500 2000 Day Hill Road Windsor, CT 06095 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 l
1
DICTRIBUTION: Meeting Notice with the JOG dated 14ar. 4, 1998 liard Cooy PUBLIC -
Control Files PGEB R/F Project File CCraig OWFN Recepticenst OGC,015 B 18 ACRS, T 2 E 26 MMalloy E-Mad SCollins/FMiraglia (SJC1/CJM) l RZimmerman (RPZ)
BSheron (BWS)
JRoe/DMatthews (JWR/DBM)
PMNS WDean (WMD)
SDroggitis (SCD)
Dross (DFR)
RGallo GLainas (GCL)
RWessman DTerao TScarbrough GWeidenhamer, RES SMagruder PWen JWilson