Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17338A727 + (18:10:23, 7 January 2025)
- L-79-117, Submits Supplementary Rept to Annual Nonradiological Environ Monitoring Rept 1978 + (18:10:27, 7 January 2025)
- ML17338A725 + (18:10:29, 7 January 2025)
- ML17338A723 + (18:10:30, 7 January 2025)
- ML17338A724 + (18:10:30, 7 January 2025)
- ML17338A722 + (18:10:31, 7 January 2025)
- ML17338A720 + (18:10:33, 7 January 2025)
- L-79-128, Forwards Schedule for Plant Mods Re Fire Protection & Addl Info Re Safety Evaluation,Per 790321 Request + (18:10:34, 7 January 2025)
- ML17338A718 + (18:10:35, 7 January 2025)
- L-79-127, Submits Analysis Supporting Amend to App a of Licenses DPR-31 & DPR-41.DNBR Safety Limit of 1.24 Is Consistent W/Cobra Iiic Computer Code.Forwards DNBR Safety Limit for Cobra Iiic Analysis + (18:10:36, 7 January 2025)
- L-79-126, Forwards Executed Amend 10 to Indemnity Agreement B-46, Increasing Coverage to $160 Million + (18:10:38, 7 January 2025)
- L-79-122, Forwards Steam Generator Insp Program. Insp Showed No New Phenomena.Verified General Pattern of Denting Is within Predictable Limits.Requests Permission to Return Facility to Power Operation + (18:10:40, 7 January 2025)
- ML17338A711 + (18:10:40, 7 January 2025)
- ML17338A708 + (18:10:43, 7 January 2025)
- IR 05000250/1979008 + (18:10:45, 7 January 2025)
- ML17338A704 + (18:10:48, 7 January 2025)
- ML17338A701 + (18:10:50, 7 January 2025)
- ML17338A700 + (18:10:50, 7 January 2025)
- L-79-113, Forwards Initial Response Re Emergency Power Sys Periodic Tests Requested in NRC + (18:10:51, 7 January 2025)
- L-79-112, Forwards Replacement First Page for Safety Evaluation, Forwarded 790502,w/Tech Spec Change Proposal Re Safety Injection Trip Logic + (18:10:52, 7 January 2025)
- ML17338A695 + (18:10:54, 7 January 2025)
- ML17338A694 + (18:10:55, 7 January 2025)
- 05000251/LER-1979-006-03, /03L-0 on 790322:packing leak-off Observed on Three Valves.Cause Undetermined for Two Valves.Leaking Packing on Third Due to Broken Bellows Seal.Unit in Reeling Shutdown;Repairs Will Be Made Before Return to Power + (18:10:56, 7 January 2025)
- 05000251/LER-1979-006, Forwards LER 79-006/03L-0 + (18:10:58, 7 January 2025)
- 05000251/LER-1979-005-03, /03L-0 on 790322:process Radiation Monitors R-11 & R-12 Were Out of Svc.Caused by Failure of Air Sampling Blower Which Supplies Monitors.Blower Replaced & Monitors Returned to Svc + (18:10:59, 7 January 2025)
- 05000251/LER-1979-005, Forwards LER 79-005/03L-0 + (18:11:01, 7 January 2025)
- L-79-109, Forwards Request to Amend App a of Licenses DPR-31 & DPR-41 Re Pressurizer Level.Affidavit & Safety Evaluation Encl + (18:11:02, 7 January 2025)
- ML17338A686 + (18:11:04, 7 January 2025)
- ML17338A685 + (18:11:06, 7 January 2025)
- ML17338A683 + (18:11:07, 7 January 2025)
- ML17338A677 + (18:11:08, 7 January 2025)
- ML17338A675 + (18:11:09, 7 January 2025)
- ML17338A672 + (18:11:10, 7 January 2025)
- ML17338A674 + (18:11:10, 7 January 2025)
- ML17338A669 + (18:11:11, 7 January 2025)
- ML17338A671 + (18:11:11, 7 January 2025)
- ML17338A666 + (18:11:13, 7 January 2025)
- IR 05000250/1979003 + (18:11:14, 7 January 2025)
- ML17338A661 + (18:11:16, 7 January 2025)
- ML17338A658 + (18:11:16, 7 January 2025)
- 05000251/LER-1979-004-03, /03L-0 on 790315:vendor Reported Main Steam Line Mechanical Snubber,Returned for Routine Testing,Was in locked-up Condition.Caused by Damaged Thrust Bearing. X-stop Adjusted + (18:11:17, 7 January 2025)
- 05000251/LER-1979-002-03, /03L-0 on 790310:during Cold Shutdown,Cracks Observed in 4B Charging Pump Suction Piping.Probably Caused by Design/Installation of Positive Displacement Pumps. Welds Repaired & Mods Made to Reduce Stresses + (18:11:19, 7 January 2025)
- 05000251/LER-1979-004, Forwards LER 79-004/03L-0 + (18:11:21, 7 January 2025)
- 05000251/LER-1979-003-03, /03L-0 on 790315:during Normal Operation,Crack Observed in 4C Charging Pump Suction Piping.Caused by Design/Installation of Pumps Resulting in Operational Pressure Pulsation/Vibration Effects.Weld Repaired + (18:11:22, 7 January 2025)
- 05000251/LER-1979-002, Forwards LER 79-002/03L-0 + (18:11:24, 7 January 2025)
- 05000251/LER-1979-003, Forwards LER 79-003/03L-0 + (18:11:26, 7 January 2025)
- ML17338A643 + (18:11:27, 7 January 2025)
- ML17338A642 + (18:11:28, 7 January 2025)
- ML17338A640 + (18:11:32, 7 January 2025)
- ML17338A637 + (18:11:33, 7 January 2025)
- ML17338A639 + (18:11:33, 7 January 2025)