)fp~~4 UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING STATION UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No.
DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
C.
D.
The application for amendment by Florida Power and Light Company (the licensee) dated March 6, 1979 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and.regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
05OVii
2.
Accordingly, paragraph 3.E is modified to amend sub-paragraph 3.E.5 and sub-paragraph 3.E.6 is deleted.
Sub-paragraph 3.E.5 reads as follows:
"E. Steam Generator Ins ections 5.
In order to perform an inspection of the steam generators, Unit No.
3 shall be brought to the cold shutdown condition within six equivalent months of operation from March 29,
- 1979, unless:
(1) an inspection of the -steam generators is performed within this six month period as a result of the requiremehts in 2, 3 and 4 above, or (2) an acceptable analysis of the susceptibility for stress corrosion cracking of tubing is submitted to explicitly justify continued operation of Unit No.
3 beyond the authorized six equivalent months of operation.
Any, analysis justifying continued operation must be submitted at least 45 days prior to the expiration date of the authorized six equivalent months of operation.
For the purpose of this requirement,-
equivalent operation is defined as operation with a primary coolant temperature greater than 350'F.
NRC approval shall be obtained before resuming power operation following this inspection.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION jM~c~C~
A. Schwencer, Chief Operating Reactors Branch gl Oivision of Operating Reactors Date of Issuance:
March 30, 1979