Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17339A073 + (18:03:38, 7 January 2025)
- ML17339A072 + (18:03:39, 7 January 2025)
- ML17339A070 + (18:03:39, 7 January 2025)
- EPID:L-2017-LLA-0383 + (18:03:40, 7 January 2025)
- ML17339A069 + (18:03:40, 7 January 2025)
- ML17339A050 + (18:03:41, 7 January 2025)
- ML17339A049 + (18:03:42, 7 January 2025)
- TAC:M95644 + (18:03:43, 7 January 2025)
- ML17339A045 + (18:03:44, 7 January 2025)
- L-96-222, Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel + (18:03:46, 7 January 2025)
- ML17339A044 + (18:03:46, 7 January 2025)
- 05000249/LER-1979-023-03, /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified + (18:03:51, 7 January 2025)
- 05000249/LER-1979-021-03, /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly + (18:03:52, 7 January 2025)
- ML17338B294 + (18:03:53, 7 January 2025)
- ML17338B292 + (18:03:55, 7 January 2025)
- ML17338B291 + (18:03:56, 7 January 2025)
- ML17338B290 + (18:03:57, 7 January 2025)
- ML17338B286 + (18:03:57, 7 January 2025)
- IR 05000254/1979008 + (18:03:58, 7 January 2025)
- ML17338B270 + (18:04:00, 7 January 2025)
- ML17338B272 + (18:04:00, 7 January 2025)
- 05000219/LER-1979-001-03, /03L-0 on 790118:valve V-14-35 Failed to Open Completely During Routine Isolation Condenser Valve Operability Test.Caused by Dirty Torque Limit Switch Contacts,Which Were Subsequently Cleaned & Burnished + (18:04:02, 7 January 2025)
- 05000219/LER-1979-001, Forwards LER 79-001/03L-0 + (18:04:04, 7 January 2025)
- ML17338B263 + (18:04:05, 7 January 2025)
- W3F1-2017-0082, Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year Interval + (18:04:05, 7 January 2025)
- BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of + (18:04:06, 7 January 2025)
- ML17338B256 + (18:04:09, 7 January 2025)
- IR 05000335/1978016 + (18:04:10, 7 January 2025)
- ML17338B248 + (18:04:12, 7 January 2025)
- ML17338B246 + (18:04:13, 7 January 2025)
- 05000250/LER-1979-027-03, /03L-0:790919,line Starter of Fire Pump E Upgraded to NFPA Requirements W/Ul/Fm Approved Unit.Pump Inoperable for 30 Days.Caused by Difficulties Encountered in Mounting Starter + (18:04:14, 7 January 2025)
- 05000250/LER-1979-027, Forwards LER 79-027/03L-0 + (18:04:16, 7 January 2025)
- IR 05000250/1979029 + (18:04:18, 7 January 2025)
- ML17338B239 + (18:04:20, 7 January 2025)
- 05000250/LER-1979-029-03, /03L-0:on 791002,during Power Operation,Condensate Storage Tank Contained Less than 185,000 Gallons Required by Tech Specs.Caused by Condenser Leak & Resin Bed Depletion.Plant Changes & Mods Scheduled + (18:04:21, 7 January 2025)
- 05000250/LER-1979-029, Forwards LER 79-029/03L-0 + (18:04:22, 7 January 2025)
- 05000250/LER-1979-028-03, /03L-0:on 791001,auxiliary Feedwater Pump a Failed to Start.Caused by Inoperability of Auxiliary Feedwater Steam Turbine Pressure Control Valve CV-3705.Low Points of Instrument Air Sys Drained + (18:04:24, 7 January 2025)
- 05000250/LER-1979-028, Forwards LER 79-028/03L-0 + (18:04:26, 7 January 2025)
- ML17338B232 + (18:04:27, 7 January 2025)
- 05000250/LER-1979-009-03, During Refueling Shutdown,Leak Observed from Temporary Level Indication Line Near Base of Refueling Water Storage Tank.Cause Undetermined.Integrity of Piping & Instrumentation Verified + (18:04:28, 7 January 2025)
- 05000250/LER-1979-009, Forwards Updated LER 79-009/03X-1 + (18:04:31, 7 January 2025)
- IR 05000250/1979024 + (18:04:33, 7 January 2025)
- ML17338B224 + (18:04:35, 7 January 2025)
- ML17338B222 + (18:04:36, 7 January 2025)
- ML17338B221 + (18:04:36, 7 January 2025)
- ML17338B219 + (18:04:37, 7 January 2025)
- ML17338B218 + (18:04:39, 7 January 2025)
- ML17338B217 + (18:04:40, 7 January 2025)
- ML17338B216 + (18:04:43, 7 January 2025)
- ML17338B215 + (18:04:44, 7 January 2025)
- L-79-300, Forwards Executed Amend 11 to Indemnity Agreement B-46, Modifying Prefatory Language Re Transportation,Handling & Storage of Radioactive Matl + (18:04:46, 7 January 2025)