APPENDIX A NOTICE OF VIOLATION Florida Power and Light Company Turkey Point, Units 3 and 4
License Nos.
DPR-31 DPR-41 Based on the NRC inspection July 17-20, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by 10 CFR 50, Appendix B, Criterion XV, and Topical Quality Requirement 15.0 of the Topical Quality Assurance Report No.
FPLTQAR 1-76A, as implemented by paragraph 5.4.2 of QA Procedure 15.2, open nonconformance reports shall be periodically reviewed by the appropriate Quality Control organization to assure that response to/and closure of nonconformances are being conducted in a timely manner.
Contrary to the above, a nonconformance report (NCR) written on June 8, 1979, concerning the installation of PC/M 79-42 had not been assigned an "NCR No." as required by Quality Procedure 15.2 and was not being tracked for dispositioning in a timely maner.
This is an infraction.