ML17338B239

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/79-29 & 50-251/79-29 on 790911-14.No Noncompliance Noted
ML17338B239
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338B241 List:
References
NUDOCS 7911070203
Download: ML17338B239 (4)


See also: IR 05000250/1979029

Text

~S BEgy

~4

"o

Cy

0O

In Reply Refer To:

RII:RVL

50-250/79-29

50-251/79-29

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

gyp'2

6 1979

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

,P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by R. J. Votg-I.owell of this office on

September

11-14,

1979, of activities authorized, by NRC Operating

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, and to the discussion of our

findings held with H. E. Yaeger at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is proprietary,

and

should

be

prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

791XO',FO

4

Florida Power and Light Company

gyp 2

6 1979

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Z.c.

R.

C.

ewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Xnspection Report Nos. 50-250/79-29,

and 50-251/79-29

cc w/encl:

H. E. Yaeger, Plant Manager

P. 0. Box 013100

Miami, FL

33101