Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-88-400, Forwards Revised Response to NRC Re Violations Noted in Insp Repts 50-250/86-06 & 50-251/86-06.Corrective Actions:Procedure 3/4-OSP-068.2 Will Be Revised to Establish Requirements for New Ref Values + (16:42:47, 7 January 2025)
- L-88-386, Forwards Summary of mgt-on-shift Weekly Rept Per 871019 Order + (16:42:50, 7 January 2025)
- L-88-409, Forwards Select Sys Assessment Progress Summary for Aug 1988,per 860812 Order + (16:42:55, 7 January 2025)
- 05000251/LER-1988-009, :on 880816,steam Generator Feedwater Pump Tripped During Coating of Condensate Polisher Vessel 4B W/ Resin for Secondary Sys Startup.Caused by Failure of Differential Pressure Switch.Switch Replaced + (16:42:59, 7 January 2025)
- 05000251/LER-1988-008-01, :on 880815,Phase a of Containment Isolation Train a Actuated.Caused by Wire Bundle Bouncing Contacts of Relay 4-SIA2.Actuation Signal Reset + (16:43:02, 7 January 2025)
- 05000251/LER-1988-007-01, :on 880812,while Performing Corrective Maint, Subcritical Reactor Trip Occurred.Caused by Failure of Source Range Neutron Detector N-32.Post-trip Review Performed & Detector Replaced + (16:43:05, 7 January 2025)
- ML17345A374 + (16:43:07, 7 January 2025)
- ML17345A372 + (16:43:08, 7 January 2025)
- ML17345A371 + (16:43:10, 7 January 2025)
- ML17345A368 + (16:43:11, 7 January 2025)
- ML17345A366 + (16:43:12, 7 January 2025)
- ML17345A364 + (16:43:14, 7 January 2025)
- ML17345A363 + (16:43:16, 7 January 2025)
- ML17345A362 + (16:43:17, 7 January 2025)
- ML17345A360 + (16:43:18, 7 January 2025)
- ML17345A359 + (16:43:20, 7 January 2025)
- ML17345A358 + (16:43:22, 7 January 2025)
- L-88-372, Forwards Summary of mgt-on-shift Weekly Repts. Supervisor-nuclear Shift Repts Encl + (16:43:23, 7 January 2025)
- L-88-364, Responds to Violations Noted in Insp Repts 50-250/88-14 & 50-251/88-14.Corrective Action:Fitting That Failed on Pump 3A Replaced W/Stainless Steel Matl Per Class L of Piping Spec + (16:43:25, 7 January 2025)
- ML17345A355 + (16:43:29, 7 January 2025)
- ML17345A354 + (16:43:31, 7 January 2025)
- ML17345A353 + (16:43:32, 7 January 2025)
- L-88-383, Special Rept:On 880826,nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days, in Accordance W/Tech Spec 3.14.5.b.Addl Corrective Actions Initiated & Compensatory Measures Implemented as Applicable + (16:43:33, 7 January 2025)
- L-88-384, Responds to Violations Noted in Insp Repts 50-250/88-11 & 50-251/88-11.Corrective Actions:Chemistry Dept Training Program Revised to Include Addl Instruction on Procedure Usage + (16:43:35, 7 January 2025)
- L-88-367, Semiannual Radioactive Effluent Release Rept,Jan-June 1988 + (16:43:41, 7 January 2025)
- L-88-365, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-250/88-16 & 50-251/88-16.Corrective Actions:Draft of Ltr of Instruction for Security Plan Changes Prepared for Review & Comment + (16:43:46, 7 January 2025)
- ML17345A347 + (16:43:49, 7 January 2025)
- IR 05000250/1988019 + (16:44:03, 7 January 2025)
- ML17345A344 + (16:44:06, 7 January 2025)
- L-88-350, Forwards Results of NRC Confirmatory Measurements Program Samples,Per 880421 Request + (16:44:07, 7 January 2025)
- L-88-371, Forwards Summary of Ref Matl Supplied to Region II for Operator Exams,Per Request + (16:44:10, 7 January 2025)
- PNO-II-88-050A, on 880816,spent Fuel Pit Cooling Sys Pump Failed Resulting in Unplanned Spilling of Some 3,100 Gallons of Spent Fuel Pit Water at Plant.Backup Pump Installed.Util Continuing Work to Decontaminate HX Room + (16:44:15, 7 January 2025)
- L-88-359, Forwards Summary Rept of Integrated Schedule for Aug 1988, Reflecting Info as of 880819,including New Outage Completion Date for Unit 4,Cycle 12.Next 6-month Rept Will Be Issued Following Nov 1988 Schedule + (16:44:16, 7 January 2025)
- L-88-339, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880729.Plant Supervisor Nuclear Shift Repts Also Submitted + (16:44:19, 7 January 2025)
- PNO-II-88-050, on 880816,approx 3,100 Gallons of Slightly Radioactive Water Released from Spent Fuel Pit by Vent Valve on Failed Pump.Cause Under Investigation.Hourly Sampling Underway.Sandbags Placed Around Spill Areas + (16:44:22, 7 January 2025)
- ML17345A336 + (16:44:23, 7 January 2025)
- ML17345A335 + (16:44:25, 7 January 2025)
- TAC:68954 + (16:44:26, 7 January 2025)
- ML17345A334 + (16:44:29, 7 January 2025)
- ML17345A333 + (16:44:30, 7 January 2025)
- TAC:65038 + (16:44:31, 7 January 2025)
- L-88-338, Discusses Schedule for Submittal of Proof & Review Tech Specs.Comments Expected by 880923 + (16:44:35, 7 January 2025)
- IR 05000250/1988017 + (16:44:40, 7 January 2025)
- ML17345A328 + (16:44:42, 7 January 2025)
- 05000251/LER-1988-006-01, :on 880716,containment Ventilation & Control Room Ventilation Sys Isolation Occurred.Caused by Very Conservative Setpoint for R-11 Actuation.Unit Removed from Operation & Temporary Repair Effected + (16:44:44, 7 January 2025)
- ML17345A325 + (16:44:45, 7 January 2025)
- ML17345A324 + (16:44:46, 7 January 2025)
- L-88-351, Forwards Monthly Operating Repts for Jul 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (16:44:47, 7 January 2025)
- L-88-340, Forwards Jul 1988 Progress Summary of Select Sys Assessment Re Design Basis Reconstitution,Safety Engineering Group, Walkdowns & Other Significant Progress + (16:44:49, 7 January 2025)
- 05000250/LER-1988-014, :on 880714,RCS Leakage Surveillance Not Performed within Required Interval Due to Personnel Error. Note Placed in Night Book Stressing Need to Meet 18-30 H Tech Specs Requirements + (16:44:53, 7 January 2025)
- ML17345A315 + (16:44:54, 7 January 2025)